Require Re-Authentication When Using the sudo Command

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The sudo timestamp_timeout tag sets the amount of time sudo password prompt waits. The default timestamp_timeout value is 5 minutes. The timestamp_timeout should be configured by making sure that the timestamp_timeout tag exists in /etc/sudoers configuration file or any sudo configuration snippets in /etc/sudoers.d/. If the value is set to an integer less than 0, the user’s time stamp will not expire and the user will not have to re-authenticate for privileged actions until the user’s session is terminated.

Rationale

Without re-authentication, users may access resources or perform tasks for which they do not have authorization.

When operating systems provide the capability to escalate a functional capability, it is critical that the user re-authenticate.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'sudo' 2>/dev/null | grep -q installed; then

var_sudo_timestamp_timeout='15'


if grep -Px '^[\s]*Defaults.*timestamp_timeout[\s]*=.*' /etc/sudoers.d/*; then
    find /etc/sudoers.d/ -type f -exec sed -Ei "/^[[:blank:]]*Defaults.*timestamp_timeout[[:blank:]]*=.*/d" {} \;
fi

if /usr/sbin/visudo -qcf /etc/sudoers; then
    cp /etc/sudoers /etc/sudoers.bak
    if ! grep -P '^[\s]*Defaults.*timestamp_timeout[\s]*=[\s]*[-]?\w+.*$' /etc/sudoers; then
        # sudoers file doesn't define Option timestamp_timeout
        echo "Defaults timestamp_timeout=${var_sudo_timestamp_timeout}" >> /etc/sudoers
    else
        # sudoers file defines Option timestamp_timeout, remediate wrong values if present
        if grep -qP "^[\s]*Defaults\s.*\btimestamp_timeout[\s]*=[\s]*(?!${var_sudo_timestamp_timeout}\b)[-]?\w+\b.*$" /etc/sudoers; then
            sed -Ei "s/(^[[:blank:]]*Defaults.*timestamp_timeout[[:blank:]]*=)[[:blank:]]*[-]?\w+(.*$)/\1${var_sudo_timestamp_timeout}\2/" /etc/sudoers
        fi
    fi
    
    # Check validity of sudoers and cleanup bak
    if /usr/sbin/visudo -qcf /etc/sudoers; then
        rm -f /etc/sudoers.bak
    else
        echo "Fail to validate remediated /etc/sudoers, reverting to original file."
        mv /etc/sudoers.bak /etc/sudoers
        false
    fi
else
    echo "Skipping remediation, /etc/sudoers failed to validate"
    false
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication
- name: XCCDF Value var_sudo_timestamp_timeout # promote to variable
  set_fact:
    var_sudo_timestamp_timeout: !!str 15
  tags:
    - always

- name: Require Re-Authentication When Using the sudo Command - Find /etc/sudoers.d/*
    files containing 'Defaults timestamp_timeout'
  ansible.builtin.find:
    path: /etc/sudoers.d
    patterns: '*'
    contains: ^[\s]*Defaults\s.*\btimestamp_timeout[\s]*=.*
  register: sudoers_d_defaults_timestamp_timeout
  when: '"sudo" in ansible_facts.packages'
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication

- name: Require Re-Authentication When Using the sudo Command - Remove 'Defaults timestamp_timeout'
    from /etc/sudoers.d/* files
  ansible.builtin.lineinfile:
    path: '{{ item.path }}'
    regexp: ^[\s]*Defaults\s.*\btimestamp_timeout[\s]*=.*
    state: absent
  with_items: '{{ sudoers_d_defaults_timestamp_timeout.files }}'
  when: '"sudo" in ansible_facts.packages'
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication

- name: Require Re-Authentication When Using the sudo Command - Ensure timestamp_timeout
    has the appropriate value in /etc/sudoers
  ansible.builtin.lineinfile:
    path: /etc/sudoers
    regexp: ^[\s]*Defaults\s(.*)\btimestamp_timeout[\s]*=[\s]*[-]?\w+\b(.*)$
    line: Defaults \1timestamp_timeout={{ var_sudo_timestamp_timeout }}\2
    validate: /usr/sbin/visudo -cf %s
    backrefs: true
  register: edit_sudoers_timestamp_timeout_option
  when: '"sudo" in ansible_facts.packages'
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication

- name: Require Re-Authentication When Using the sudo Command - Enable timestamp_timeout
    option with correct value in /etc/sudoers
  ansible.builtin.lineinfile:
    path: /etc/sudoers
    line: Defaults timestamp_timeout={{ var_sudo_timestamp_timeout }}
    validate: /usr/sbin/visudo -cf %s
  when:
  - '"sudo" in ansible_facts.packages'
  - |
    edit_sudoers_timestamp_timeout_option is defined and not edit_sudoers_timestamp_timeout_option.changed
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication

- name: Require Re-Authentication When Using the sudo Command - Remove timestamp_timeout
    wrong values in /etc/sudoers
  ansible.builtin.lineinfile:
    path: /etc/sudoers
    regexp: ^[\s]*Defaults\s.*\btimestamp_timeout[\s]*=[\s]*(?!{{ var_sudo_timestamp_timeout
      }}\b)[-]?\w+\b.*$
    state: absent
    validate: /usr/sbin/visudo -cf %s
  when: '"sudo" in ansible_facts.packages'
  tags:
  - NIST-800-53-IA-11
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_require_reauthentication
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers