Deactivate Wireless Network Interfaces

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Deactivating wireless network interfaces should prevent normal usage of the wireless capability.

Verify that there are no wireless interfaces configured on the system with the following command:

$ ls -L -d /sys/class/net/*/wireless | xargs dirname | xargs basename -a

Rationale

The use of wireless networking can introduce many different attack vectors into the organization’s network. Common attack vectors such as malicious association and ad hoc networks will allow an attacker to spoof a wireless access point (AP), allowing validated systems to connect to the malicious AP and enabling the attacker to monitor and record network traffic. These malicious APs can also serve to create a man-in-the-middle attack or be used to create a denial of service to valid network resources.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

if [ -n "$(find /sys/class/net/*/ -type d -name wireless)" ]; then
    interfaces=$(find /sys/class/net/*/wireless -type d -name wireless | xargs -0 dirname | xargs basename)

    for i in $interfaces; do
        ip link set dev "$i" down
        drivers=$(basename "$(readlink -f /sys/class/net/"$i"/device/driver)")
        echo "install $drivers /bin/false" >> /etc/modprobe.d/disable_wireless.conf
        modprobe -r "$drivers"
     done
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - DISA-STIG-UBTU-20-010455
  - NIST-800-171-3.1.16
  - NIST-800-53-AC-18(3)
  - NIST-800-53-AC-18(a)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-MP-7
  - PCI-DSS-Req-1.3.3
  - PCI-DSSv4-1.3
  - PCI-DSSv4-1.3.3
  - low_complexity
  - medium_disruption
  - medium_severity
  - no_reboot_needed
  - unknown_strategy
  - wireless_disable_interfaces

- name: Service facts
  ansible.builtin.service_facts: null
  tags:
  - DISA-STIG-UBTU-20-010455
  - NIST-800-171-3.1.16
  - NIST-800-53-AC-18(3)
  - NIST-800-53-AC-18(a)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-MP-7
  - PCI-DSS-Req-1.3.3
  - PCI-DSSv4-1.3
  - PCI-DSSv4-1.3.3
  - low_complexity
  - medium_disruption
  - medium_severity
  - no_reboot_needed
  - unknown_strategy
  - wireless_disable_interfaces

- name: Ensure NetworkManager is installed
  ansible.builtin.package:
    name: '{{ item }}'
    state: present
  with_items:
  - NetworkManager
  tags:
  - DISA-STIG-UBTU-20-010455
  - NIST-800-171-3.1.16
  - NIST-800-53-AC-18(3)
  - NIST-800-53-AC-18(a)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-MP-7
  - PCI-DSS-Req-1.3.3
  - PCI-DSSv4-1.3
  - PCI-DSSv4-1.3.3
  - low_complexity
  - medium_disruption
  - medium_severity
  - no_reboot_needed
  - unknown_strategy
  - wireless_disable_interfaces

- name: NetworkManager Deactivate Wireless Network Interfaces
  command: nmcli radio wifi off
  when:
  - '''NetworkManager'' in ansible_facts.packages'
  - ansible_facts.services['NetworkManager.service'].state == 'running'
  tags:
  - DISA-STIG-UBTU-20-010455
  - NIST-800-171-3.1.16
  - NIST-800-53-AC-18(3)
  - NIST-800-53-AC-18(a)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-MP-7
  - PCI-DSS-Req-1.3.3
  - PCI-DSSv4-1.3
  - PCI-DSSv4-1.3.3
  - low_complexity
  - medium_disruption
  - medium_severity
  - no_reboot_needed
  - unknown_strategy
  - wireless_disable_interfaces
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers