azure_network_bastion_host

disable_copy_paste

Type: BOOLEAN
Provider name: properties.disableCopyPaste
Description: Enable/Disable Copy/Paste feature of the Bastion Host resource.

dns_name

Type: STRING
Provider name: properties.dnsName
Description: FQDN for the endpoint on which bastion host is accessible.

enable_file_copy

Type: BOOLEAN
Provider name: properties.enableFileCopy
Description: Enable/Disable File Copy feature of the Bastion Host resource.

enable_ip_connect

Type: BOOLEAN
Provider name: properties.enableIpConnect
Description: Enable/Disable IP Connect feature of the Bastion Host resource.

Type: BOOLEAN
Provider name: properties.enableShareableLink
Description: Enable/Disable Shareable Link of the Bastion Host resource.

enable_tunneling

Type: BOOLEAN
Provider name: properties.enableTunneling
Description: Enable/Disable Tunneling feature of the Bastion Host resource.

etag

Type: STRING
Provider name: etag
Description: A unique read-only string that changes whenever the resource is updated.

id

Type: STRING
Provider name: id
Description: Resource ID.

ip_configurations

Type: UNORDERED_LIST_STRUCT
Provider name: properties.ipConfigurations
Description: IP configuration of the Bastion Host resource.

  • etag
    Type: STRING
    Provider name: etag
    Description: A unique read-only string that changes whenever the resource is updated.
  • id
    Type: STRING
    Provider name: id
    Description: Resource ID.
  • name
    Type: STRING
    Provider name: name
    Description: Name of the resource that is unique within a resource group. This name can be used to access the resource.
  • private_ip_allocation_method
    Type: STRING
    Provider name: properties.privateIPAllocationMethod
    Description: Private IP allocation method.
  • provisioning_state
    Type: STRING
    Provider name: properties.provisioningState
    Description: The provisioning state of the bastion host IP configuration resource.
  • public_ip_address
    Type: STRUCT
    Provider name: properties.publicIPAddress
    Description: Reference of the PublicIP resource.
    • id
      Type: STRING
      Provider name: id
      Description: Resource ID.
  • subnet
    Type: STRUCT
    Provider name: properties.subnet
    Description: Reference of the subnet resource.
    • id
      Type: STRING
      Provider name: id
      Description: Resource ID.
  • type
    Type: STRING
    Provider name: type
    Description: Ip configuration type.

location

Type: STRING
Provider name: location
Description: Resource location.

name

Type: STRING
Provider name: name
Description: Resource name.

provisioning_state

Type: STRING
Provider name: properties.provisioningState
Description: The provisioning state of the bastion host resource.

resource_group

Type: STRING

scale_units

Type: INT32
Provider name: properties.scaleUnits
Description: The scale units for the Bastion Host resource.

sku

Type: STRUCT
Provider name: sku
Description: The sku of this Bastion Host.

  • name
    Type: STRING
    Provider name: name
    Description: The name of this Bastion Host.

subscription_id

Type: STRING

subscription_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: Resource type.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers