Alibaba Cloud

The Datadog Alibaba Cloud integration does not support the Datadog for Government site.

Overview

Connect to Alibaba Cloud to get metrics from your:

  • Alibaba Cloud Servers Load Balancer (SLB)
  • Alibaba Elastic Compute Service instances
  • Alibaba Cloud ApsaraDB for RDS instances
  • Alibaba Cloud ApsaraDB for Redis instances
  • Alibaba Cloud Content Delivery Network (CDN) instances
  • Alibaba Cloud Container Service clusters
  • Alibaba Cloud Express Connect instances

Setup

Installation

Navigate to the Datadog-Alibaba Cloud integration configuration tile and press add account.

Configuration

Fill out the following parameters to integrate Datadog with the Alibaba Cloud API:

  • Account Id

Find this by hovering over the avatar on the top right of the Alibaba Cloud console and selecting Security Settings. The account ID is displayed on the top of that page.

Account ID AC
  • Access Key Id & Access Key Secret

In your Alibaba Cloud Account:

  1. Create a new user in the RAM tab with the following parameters:

    • Logon Name: Datadog
    • display name: Datadog
    • description: Datadog User for the Datadog-Alibaba Cloud integration
  2. Select Programmatic Access:

    Programmatic access
  3. After hitting OK, copy and paste the AccessKeyID and AccessKeySecret in the Datadog-Alibaba Cloud integration tile and click install integration.

    AC access keys
  4. In your Alibaba Cloud Account, select Add Permissions for the user you just created, then add all of the following permissions:

    AliyunCloudMonitorReadOnlyAccess
    AliyunECSReadOnlyAccess
    AliyunKvstoreReadOnlyAccess
    AliyunRDSReadOnlyAccess
    AliyunSLBReadOnlyAccess
    AliyunCDNReadOnlyAccess
    AliyunCSReadOnlyAccess
    AliyunExpressConnectReadOnlyAccess
    
  5. Press Update, and after around ~15 minutes, the metrics seen in the Metrics tab of the Datadog-Alibaba Cloud integration tile starts appearing in your metric explorer page tagged with any custom tags you add to your resources and tags found here:

  6. Optional - Set Optionally Limit Metrics Collection in your Datadog-Alibaba Cloud integration tile. This comma separated list of Alibaba Cloud tags (in the form <KEY:VALUE>) defines a filter to use when collecting metrics from Alibaba Cloud. Wildcards such as ? (for single characters) and * (for multiple characters) can be used. Only hosts that match one of the defined labels are imported into Datadog—the rest are ignored. Hosts matching a given label can also be excluded by adding ! before the label.

Data Collected

Metrics

alibabacloud.slb.healthy_server_count.average
(gauge)
Number of healthy backend ECS instances
Shown as instance
alibabacloud.slb.healthy_server_count.minimum
(gauge)
Number of healthy backend ECS instances
Shown as instance
alibabacloud.slb.healthy_server_count.maximum
(gauge)
Number of healthy backend ECS instances
Shown as instance
alibabacloud.slb.unhealthy_server_count.average
(gauge)
Number of faulty backend ECS instances
Shown as instance
alibabacloud.slb.unhealthy_server_count.minimum
(gauge)
Number of faulty backend ECS instances
Shown as instance
alibabacloud.slb.unhealthy_server_count.maximum
(gauge)
Number of faulty backend ECS instances
Shown as instance
alibabacloud.slb.packet_tx.average
(rate)
Number of outgoing packets per second on the port
Shown as packet
alibabacloud.slb.packet_tx.minimum
(rate)
Number of outgoing packets per second on the port
Shown as packet
alibabacloud.slb.packet_tx.maximum
(rate)
Number of outgoing packets per second on the port
Shown as packet
alibabacloud.slb.packet_rx.average
(rate)
Number of incoming packets per second on the port
Shown as packet
alibabacloud.slb.packet_rx.minimum
(rate)
Number of incoming packets per second on the port
Shown as packet
alibabacloud.slb.packet_rx.maximum
(rate)
Number of incoming packets per second on the port
Shown as packet
alibabacloud.slb.traffic_rx_new.average
(rate)
Inbound data volume per second on the port
Shown as bit
alibabacloud.slb.traffic_rx_new.minimum
(rate)
Inbound data volume per second on the port
Shown as bit
alibabacloud.slb.traffic_rx_new.maximum
(rate)
Inbound data volume per second on the port
Shown as bit
alibabacloud.slb.traffic_tx_new.average
(rate)
Outbound data volume per second on the port
Shown as bit
alibabacloud.slb.traffic_tx_new.minimum
(rate)
Outbound data volume per second on the port
Shown as bit
alibabacloud.slb.traffic_tx_new.maximum
(rate)
Outbound data volume per second on the port
Shown as bit
alibabacloud.slb.active_connection.average
(gauge)
Number of active connections on the port, that is, the number of connections that clients set up to access Server Load Balancer
Shown as connection
alibabacloud.slb.active_connection.minimum
(gauge)
Number of active connections on the port, that is, the number of connections that clients set up to access Server Load Balancer
Shown as connection
alibabacloud.slb.active_connection.maximum
(gauge)
Number of active connections on the port, that is, the number of connections that clients set up to access Server Load Balancer
Shown as connection
alibabacloud.slb.inactive_connection.average
(gauge)
Number of inactive connections on the port, that is, the number of connections that are idle after access to Server Load Balancer
Shown as connection
alibabacloud.slb.inactive_connection.minimum
(gauge)
Number of inactive connections on the port, that is, the number of connections that are idle after access to Server Load Balancer
Shown as connection
alibabacloud.slb.inactive_connection.maximum
(gauge)
Number of inactive connections on the port, that is, the number of connections that are idle after access to Server Load Balancer
Shown as connection
alibabacloud.slb.new_connection.average
(gauge)
Current number of new connections on the port
Shown as connection
alibabacloud.slb.new_connection.minimum
(gauge)
Current number of new connections on the port
Shown as connection
alibabacloud.slb.new_connection.maximum
(gauge)
Current number of new connections on the port
Shown as connection
alibabacloud.slb.max_connection.average
(gauge)
Number of concurrent connections on the port
Shown as connection
alibabacloud.slb.max_connection.minimum
(gauge)
Number of concurrent connections on the port
Shown as connection
alibabacloud.slb.max_connection.maximum
(gauge)
Number of concurrent connections on the port
Shown as connection
alibabacloud.slb.drop_connection.average
(rate)
Number of dropped connections per second during monitoring
Shown as connection
alibabacloud.slb.drop_connection.minimum
(rate)
Number of dropped connections per second during monitoring
Shown as connection
alibabacloud.slb.drop_connection.maximum
(rate)
Number of dropped connections per second during monitoring
Shown as connection
alibabacloud.slb.drop_packet_rx.average
(rate)
Number of dropped incoming packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_packet_rx.minimum
(rate)
Number of dropped incoming packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_packet_rx.maximum
(rate)
Number of dropped incoming packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_packet_tx.average
(rate)
Number of dropped outgoing packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_packet_tx.minimum
(rate)
Number of dropped outgoing packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_packet_tx.maximum
(rate)
Number of dropped outgoing packets per second during monitoring
Shown as packet
alibabacloud.slb.drop_traffic_rx.average
(rate)
Number of dropped incoming bits per second during monitoring
Shown as bit
alibabacloud.slb.drop_traffic_rx.minimum
(rate)
Number of dropped incoming bits per second during monitoring
Shown as bit
alibabacloud.slb.drop_traffic_rx.maximum
(rate)
Number of dropped incoming bits per second during monitoring
Shown as bit
alibabacloud.slb.instance_active_connection.average
(rate)
Number of active connections per second on the instance
Shown as connection
alibabacloud.slb.instance_active_connection.minimum
(rate)
Number of active connections per second on the instance
Shown as connection
alibabacloud.slb.instance_active_connection.maximum
(rate)
Number of active connections per second on the instance
Shown as connection
alibabacloud.slb.instance_drop_connection.average
(rate)
Number of dropped connections per second on the instance
Shown as connection
alibabacloud.slb.instance_drop_connection.minimum
(rate)
Number of dropped connections per second on the instance
Shown as connection
alibabacloud.slb.instance_drop_connection.maximum
(rate)
Number of dropped connections per second on the instance
Shown as connection
alibabacloud.slb.instance_drop_packet_rx.average
(rate)
Number of dropped incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_packet_rx.minimum
(rate)
Number of dropped incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_packet_rx.maximum
(rate)
Number of dropped incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_packet_tx.average
(rate)
Number of dropped outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_packet_tx.minimum
(rate)
Number of dropped outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_packet_tx.maximum
(rate)
Number of dropped outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_drop_traffic_rx.average
(rate)
Number of dropped incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_drop_traffic_rx.minimum
(rate)
Number of dropped incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_drop_traffic_rx.maximum
(rate)
Number of dropped incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_drop_traffic_tx.average
(rate)
Number of dropped outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.instance_drop_traffic_tx.minimum
(rate)
Number of dropped outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.instance_drop_traffic_tx.maximum
(rate)
Number of dropped outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.instance_inactive_connection.average
(rate)
Number of inactive connections per second on the instance
Shown as connection
alibabacloud.slb.instance_inactive_connection.minimum
(rate)
Number of inactive connections per second on the instance
Shown as connection
alibabacloud.slb.instance_inactive_connection.maximum
(rate)
Number of inactive connections per second on the instance
Shown as connection
alibabacloud.slb.instance_max_connection.average
(rate)
Maximum number of concurrent connections per second on the instance
Shown as connection
alibabacloud.slb.instance_max_connection.minimum
(rate)
Maximum number of concurrent connections per second on the instance
Shown as connection
alibabacloud.slb.instance_max_connection.maximum
(rate)
Maximum number of concurrent connections per second on the instance
Shown as connection
alibabacloud.slb.instance_new_connection.average
(rate)
Number of new connections per second on the instance
Shown as connection
alibabacloud.slb.instance_new_connection.minimum
(rate)
Number of new connections per second on the instance
Shown as connection
alibabacloud.slb.instance_new_connection.maximum
(rate)
Number of new connections per second on the instance
Shown as connection
alibabacloud.slb.instance_packet_rx.average
(rate)
Number of incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_packet_rx.minimum
(rate)
Number of incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_packet_rx.maximum
(rate)
Number of incoming packets per second on the instance
Shown as packet
alibabacloud.slb.instance_packet_tx.average
(rate)
Number of outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_packet_tx.minimum
(rate)
Number of outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_packet_tx.maximum
(rate)
Number of outgoing packets per second on the instance
Shown as packet
alibabacloud.slb.instance_traffic_rx.average
(rate)
Number of incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_traffic_rx.minimum
(rate)
Number of incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_traffic_rx.maximum
(rate)
Number of incoming bits per second on the instance
Shown as bit
alibabacloud.slb.instance_traffic_tx.average
(rate)
Number of outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.instance_traffic_tx.minimum
(rate)
Number of outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.instance_traffic_tx.maximum
(rate)
Number of outgoing bits per second on the instance
Shown as bit
alibabacloud.slb.qps.average
(rate)
Layer-7 protocol port QPS
Shown as query
alibabacloud.slb.rt.average
(gauge)
Layer-7 protocol port RT
Shown as millisecond
alibabacloud.slb.status_code2xx.average
(rate)
Layer-7 protocol port status code 2XX
alibabacloud.slb.status_code3xx.average
(rate)
Layer-7 protocol port status code 3XX
alibabacloud.slb.status_code4xx.average
(rate)
Layer-7 protocol port status code 4XX
alibabacloud.slb.status_code5xx.average
(rate)
Layer-7 protocol port status code 5XX
alibabacloud.slb.upstream_code4xx.average
(rate)
Layer-7 protocol port Upstream status code 4xx
alibabacloud.slb.upstream_code5xx.average
(rate)
Layer-7 protocol port Upstream status code 5xx
alibabacloud.slb.upstream_rt.average
(gauge)
Layer-7 protocol port UpstreamRT
Shown as millisecond
alibabacloud.slb.instance_qps.average
(rate)
Layer-7 protocol instance QPS
Shown as query
alibabacloud.slb.instance_rt.average
(gauge)
Layer-7 protocol instance RT
Shown as millisecond
alibabacloud.slb.instance_status_code2xx.average
(rate)
Layer-7 protocol instance status code 2XX
alibabacloud.slb.instance_status_code3xx.average
(rate)
Layer-7 protocol instance status code 3XX
alibabacloud.slb.instance_status_code4xx.average
(rate)
Layer-7 protocol instance status code 4XX
alibabacloud.slb.instance_status_code5xx.average
(rate)
Layer-7 protocol instance status code 5XX
alibabacloud.slb.instance_status_code_other.average
(rate)
Layer-7 protocol instance status code Other
alibabacloud.slb.instance_upstream_code4xx.average
(rate)
Layer-7 protocol instance Upstream status code 4XX
alibabacloud.slb.instance_upstream_code5xx.average
(rate)
Layer-7 protocol instance Upstream status code 5XX
alibabacloud.slb.instance_upstream_rt.average
(gauge)
Layer-7 protocol instance UpstreamRT
Shown as millisecond
alibabacloud.ecs.cpu_utilization.average
(gauge)
CPU usage
Shown as percent
alibabacloud.ecs.cpu_utilization.minimum
(gauge)
CPU usage
Shown as percent
alibabacloud.ecs.cpu_utilization.maximum
(gauge)
CPU usage
Shown as percent
alibabacloud.ecs.internet_in_rate.average
(rate)
Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.internet_in_rate.minimum
(rate)
Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.internet_in_rate.maximum
(rate)
Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.intranet_in_rate.average
(rate)
Inbound private network bandwidth
Shown as bit
alibabacloud.ecs.intranet_in_rate.minimum
(rate)
Inbound private network bandwidth
Shown as bit
alibabacloud.ecs.intranet_in_rate.maximum
(rate)
Inbound private network bandwidth
Shown as bit
alibabacloud.ecs.internet_out_rate.average
(rate)
Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.internet_out_rate.minimum
(rate)
Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.internet_out_rate.maximum
(rate)
Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.intranet_out_rate.average
(rate)
Outbound private network bandwidth
Shown as bit
alibabacloud.ecs.intranet_out_rate.maximum
(rate)
Outbound private network bandwidth
Shown as bit
alibabacloud.ecs.intranet_out_rate.minimum
(rate)
Outbound private network bandwidth
Shown as bit
alibabacloud.ecs.internet_out_rate_percent.average
(gauge)
Outbound public network bandwidth usage
Shown as percent
alibabacloud.ecs.disk_read_bps.average
(rate)
Total system disk read BPS
Shown as bit
alibabacloud.ecs.disk_read_bps.minimum
(rate)
Total system disk read BPS
Shown as bit
alibabacloud.ecs.disk_read_bps.maximum
(rate)
Total system disk read BPS
Shown as bit
alibabacloud.ecs.disk_write_bps.average
(rate)
Total system disk write BPS
Shown as bit
alibabacloud.ecs.disk_write_bps.minimum
(rate)
Total system disk write BPS
Shown as bit
alibabacloud.ecs.disk_write_bps.maximum
(rate)
Total system disk write BPS
Shown as bit
alibabacloud.ecs.disk_read_iops.average
(rate)
System disk read IOPS
Shown as operation
alibabacloud.ecs.disk_read_iops.minimum
(rate)
System disk read IOPS
Shown as operation
alibabacloud.ecs.disk_read_iops.maximum
(rate)
System disk read IOPS
Shown as operation
alibabacloud.ecs.disk_write_iops.average
(rate)
System disk write IOPS
Shown as operation
alibabacloud.ecs.disk_write_iops.minimum
(rate)
System disk write IOPS
Shown as operation
alibabacloud.ecs.disk_write_iops.maximum
(rate)
System disk write IOPS
Shown as operation
alibabacloud.ecs.vpc_public_ip_internet_in_rate.average
(rate)
VPC - Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_in_rate.minimum
(rate)
VPC - Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_in_rate.maximum
(rate)
VPC - Inbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_out_rate.average
(rate)
VPC - Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_out_rate.minimum
(rate)
VPC - Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_out_rate.maximum
(rate)
VPC - Outbound public network bandwidth
Shown as bit
alibabacloud.ecs.vpc_public_ip_internet_out_rate_percent.average
(gauge)
VPC - Outbound public network bandwidth usage
Shown as percent
alibabacloud.ecs.disk_readbytes.average
(rate)
System agent disk read bytes device
Shown as byte
alibabacloud.ecs.disk_readbytes.minimum
(rate)
System agent disk read bytes device
Shown as byte
alibabacloud.ecs.disk_readbytes.maximum
(rate)
System agent disk read bytes device
Shown as byte
alibabacloud.ecs.disk_readiops.average
(rate)
System agent disk read IOPS
Shown as operation
alibabacloud.ecs.disk_readiops.minimum
(rate)
System agent disk read IOPS
Shown as operation
alibabacloud.ecs.disk_readiops.maximum
(rate)
System agent disk read IOPS
Shown as operation
alibabacloud.ecs.disk_writebytes.average
(rate)
System agent disk write bytes device
Shown as byte
alibabacloud.ecs.disk_writebytes.minimum
(rate)
System agent disk write bytes device
Shown as byte
alibabacloud.ecs.disk_writebytes.maximum
(rate)
System agent disk write bytes device
Shown as byte
alibabacloud.ecs.disk_writeiops.average
(rate)
System agent disk write IOPS
Shown as operation
alibabacloud.ecs.disk_writeiops.minimum
(rate)
System agent disk write IOPS
Shown as operation
alibabacloud.ecs.disk_writeiops.maximum
(rate)
System agent disk write IOPS
Shown as operation
alibabacloud.ecs.diskusage_avail.average
(gauge)
System agent disk usage available
Shown as byte
alibabacloud.ecs.diskusage_avail.minimum
(gauge)
System agent disk usage available
Shown as byte
alibabacloud.ecs.diskusage_avail.maximum
(gauge)
System agent disk usage available
Shown as byte
alibabacloud.ecs.diskusage_free.average
(gauge)
Host disk usage free
Shown as byte
alibabacloud.ecs.diskusage_free.minimum
(gauge)
Host disk usage free
Shown as byte
alibabacloud.ecs.diskusage_free.maximum
(gauge)
Host disk usage free
Shown as byte
alibabacloud.ecs.diskusage_total.average
(gauge)
Host disk usage total
Shown as byte
alibabacloud.ecs.diskusage_total.minimum
(gauge)
Host disk usage total
Shown as byte
alibabacloud.ecs.diskusage_total.maximum
(gauge)
Host disk usage total
Shown as byte
alibabacloud.ecs.diskusage_used.average
(gauge)
Host disk usage used
Shown as byte
alibabacloud.ecs.diskusage_used.minimum
(gauge)
Host disk usage used
Shown as byte
alibabacloud.ecs.diskusage_used.maximum
(gauge)
Host disk usage used
Shown as byte
alibabacloud.ecs.diskusage_utilization.average
(percent)
Host disk usage utilization
Shown as byte
alibabacloud.ecs.diskusage_utilization.minimum
(percent)
Host disk usage utilization
Shown as byte
alibabacloud.ecs.diskusage_utilization.maximum
(percent)
Host disk usage utilization
Shown as byte
alibabacloud.ecs.gpu_decoder_utilization.average
(gauge)
GPU decoder utilization
Shown as percent
alibabacloud.ecs.gpu_decoder_utilization.minimum
(gauge)
GPU decoder utilization
Shown as percent
alibabacloud.ecs.gpu_decoder_utilization.maximum
(gauge)
GPU decoder utilization
Shown as percent
alibabacloud.ecs.gpu_encoder_utilization.average
(gauge)
GPU encoder utilization
Shown as percent
alibabacloud.ecs.gpu_encoder_utilization.minimum
(gauge)
GPU encoder utilization
Shown as percent
alibabacloud.ecs.gpu_encoder_utilization.maximum
(gauge)
GPU encoder utilization
Shown as percent
alibabacloud.ecs.gpu_gpu_temperature.average
(gauge)
GPU temperature
Shown as degree celsius
alibabacloud.ecs.gpu_gpu_temperature.minimum
(gauge)
GPU temperature
Shown as degree celsius
alibabacloud.ecs.gpu_gpu_temperature.maximum
(gauge)
GPU temperature
Shown as degree celsius
alibabacloud.ecs.gpu_gpu_usedutilization.average
(gauge)
GPU used utilization
Shown as percent
alibabacloud.ecs.gpu_gpu_usedutilization.minimum
(gauge)
GPU used utilization
Shown as percent
alibabacloud.ecs.gpu_gpu_usedutilization.maximum
(gauge)
GPU used utilization
Shown as percent
alibabacloud.ecs.gpu_memory_freespace.average
(gauge)
GPU memory free space
Shown as byte
alibabacloud.ecs.gpu_memory_freespace.minimum
(gauge)
GPU memory free space
Shown as byte
alibabacloud.ecs.gpu_memory_freespace.maximum
(gauge)
GPU memory free space
Shown as byte
alibabacloud.ecs.gpu_memory_freeutilization.average
(gauge)
GPU memory free utilization
Shown as percent
alibabacloud.ecs.gpu_memory_freeutilization.minimum
(gauge)
GPU memory free utilization
Shown as percent
alibabacloud.ecs.gpu_memory_freeutilization.maximum
(gauge)
GPU memory free utilization
Shown as percent
alibabacloud.ecs.gpu_memory_usedspace.average
(gauge)
GPU memory used space
Shown as byte
alibabacloud.ecs.gpu_memory_usedspace.minimum
(gauge)
GPU memory used space
Shown as byte
alibabacloud.ecs.gpu_memory_usedspace.maximum
(gauge)
GPU memory used space
Shown as byte
alibabacloud.ecs.gpu_memory_usedutilization.average
(gauge)
GPU memory used utilization
Shown as percent
alibabacloud.ecs.gpu_memory_usedutilization.minimum
(gauge)
GPU memory used utilization
Shown as percent
alibabacloud.ecs.gpu_memory_usedutilization.maximum
(gauge)
GPU memory used utilization
Shown as percent
alibabacloud.ecs.gpu_power_readings_power_draw.average
(gauge)
GPU power readings power draw
Shown as watt
alibabacloud.ecs.gpu_power_readings_power_draw.minimum
(gauge)
GPU power readings power draw
Shown as watt
alibabacloud.ecs.gpu_power_readings_power_draw.maximum
(gauge)
GPU power readings power draw
Shown as watt
alibabacloud.rds.cpu_usage.average
(gauge)
CPU usage
Shown as percent
alibabacloud.rds.cpu_usage.minimum
(gauge)
CPU usage
Shown as percent
alibabacloud.rds.cpu_usage.maximum
(gauge)
CPU usage
Shown as percent
alibabacloud.rds.disk_usage.average
(gauge)
Disk usage
Shown as percent
alibabacloud.rds.disk_usage.minimum
(gauge)
Disk usage
Shown as percent
alibabacloud.rds.disk_usage.maximum
(gauge)
Disk usage
Shown as percent
alibabacloud.rds.iops_usage.average
(gauge)
IOPS usage
Shown as percent
alibabacloud.rds.iops_usage.minimum
(gauge)
IOPS usage
Shown as percent
alibabacloud.rds.iops_usage.maximum
(gauge)
IOPS usage
Shown as percent
alibabacloud.rds.connection_usage.average
(gauge)
Connection usage
Shown as percent
alibabacloud.rds.connection_usage.minimum
(gauge)
Connection usage
Shown as percent
alibabacloud.rds.connection_usage.maximum
(gauge)
Connection usage
Shown as percent
alibabacloud.rds.data_delay.average
(gauge)
Read-only instance latency
Shown as second
alibabacloud.rds.data_delay.minimum
(gauge)
Read-only instance latency
Shown as second
alibabacloud.rds.data_delay.maximum
(gauge)
Read-only instance latency
Shown as second
alibabacloud.rds.memory_usage.average
(gauge)
Memory usage
Shown as percent
alibabacloud.rds.memory_usage.minimum
(gauge)
Memory usage
Shown as percent
alibabacloud.rds.memory_usage.maximum
(gauge)
Memory usage
Shown as percent
alibabacloud.rds.my_sql_network_in_new.average
(rate)
MysqlInbound network traffic per second
Shown as bit
alibabacloud.rds.my_sql_network_in_new.minimum
(rate)
MysqlInbound network traffic per second
Shown as bit
alibabacloud.rds.my_sql_network_in_new.maximum
(rate)
MysqlInbound network traffic per second
Shown as bit
alibabacloud.rds.my_sql_network_out_new.average
(rate)
MysqlOutbound network traffic per second
Shown as bit
alibabacloud.rds.my_sql_network_out_new.minimum
(rate)
MysqlOutbound network traffic per second
Shown as bit
alibabacloud.rds.my_sql_network_out_new.maximum
(rate)
MysqlOutbound network traffic per second
Shown as bit
alibabacloud.rds.sql_server_network_in_new.average
(rate)
SQLServer - inbound network traffic per second
Shown as bit
alibabacloud.rds.sql_server_network_out_new.average
(rate)
SQLServer - outbound network traffic per second
Shown as bit
alibabacloud.redis.memory_usage.average
(gauge)
Percentage of memory in use
Shown as percent
alibabacloud.redis.memory_usage.minimum
(gauge)
Percentage of memory in use
Shown as percent
alibabacloud.redis.memory_usage.maximum
(gauge)
Percentage of memory in use
Shown as percent
alibabacloud.redis.connection_usage.average
(gauge)
Percentage of connections in use
Shown as percent
alibabacloud.redis.connection_usage.minimum
(gauge)
Percentage of connections in use
Shown as percent
alibabacloud.redis.connection_usage.maximum
(gauge)
Percentage of connections in use
Shown as percent
alibabacloud.redis.intranet_in_ratio.average
(gauge)
Percentage of bandwidth consumed during write operations
Shown as percent
alibabacloud.redis.intranet_in_ratio.minimum
(gauge)
Percentage of bandwidth consumed during write operations
Shown as percent
alibabacloud.redis.intranet_in_ratio.maximum
(gauge)
Percentage of bandwidth consumed during write operations
Shown as percent
alibabacloud.redis.intranet_in.average
(rate)
Write speed
Shown as bit
alibabacloud.redis.intranet_in.minimum
(rate)
Write speed
Shown as bit
alibabacloud.redis.intranet_in.maximum
(rate)
Write speed
Shown as bit
alibabacloud.redis.failed_count.average
(rate)
Number of failed operations on KVSTORE
Shown as operation
alibabacloud.redis.failed_count.minimum
(rate)
Number of failed operations on KVSTORE
Shown as operation
alibabacloud.redis.failed_count.maximum
(rate)
Number of failed operations on KVSTORE
Shown as operation
alibabacloud.redis.cpu_usage.average
(gauge)
CPU usage
Shown as percent
alibabacloud.redis.cpu_usage.minimum
(gauge)
CPU usage
Shown as percent
alibabacloud.redis.cpu_usage.maximum
(gauge)
CPU usage
Shown as percent
alibabacloud.redis.used_memory.average
(gauge)
Memory in use
Shown as byte
alibabacloud.redis.used_memory.minimum
(gauge)
Memory in use
Shown as byte
alibabacloud.redis.used_memory.maximum
(gauge)
Memory in use
Shown as byte
alibabacloud.redis.used_connection.average
(gauge)
Number of used connections
Shown as connection
alibabacloud.redis.used_connection.minimum
(gauge)
Number of used connections
Shown as connection
alibabacloud.redis.used_connection.maximum
(gauge)
Number of used connections
Shown as connection
alibabacloud.cdn.qps.average
(gauge)
Total access requests
Shown as request
alibabacloud.cdn.qps.minimum
(gauge)
Total access requests
Shown as request
alibabacloud.cdn.qps.maximum
(gauge)
Total access requests
Shown as request
alibabacloud.cdn.bps.average
(rate)
Peak bandwidth
Shown as bit
alibabacloud.cdn.bps.minimum
(rate)
Peak bandwidth
Shown as bit
alibabacloud.cdn.bps.maximum
(rate)
Peak bandwidth
Shown as bit
alibabacloud.cdn.hit_rate.average
(gauge)
Bytes hit rate
Shown as percent
alibabacloud.cdn.code4xx.average
(gauge)
Percent of 4xx status codes
Shown as percent
alibabacloud.cdn.code5xx.average
(gauge)
Percent of 5xx status codes
Shown as percent
alibabacloud.cdn.internet_out.sum
(gauge)
Downstream traffic
Shown as byte
alibabacloud.cdn.count
(gauge)
Number of instances
Shown as instance
alibabacloud.container_service.cluster.cpu.limit
(gauge)
cluster CPU limit
Shown as core
alibabacloud.container_service.cluster.cpu.request
(gauge)
cluster CPU request
Shown as core
alibabacloud.container_service.cluster.cpu.usage_rate
(gauge)
cluster CPU usage rate
Shown as core
alibabacloud.container_service.cluster.cpu.utilization
(gauge)
cluster CPU utilization
Shown as percent
alibabacloud.container_service.cluster.memory.limit
(gauge)
cluster memory limit
Shown as byte
alibabacloud.container_service.cluster.memory.request
(gauge)
cluster memory request
Shown as byte
alibabacloud.container_service.cluster.memory.utilization
(gauge)
cluster memory utilization
Shown as percent
alibabacloud.container_service.node.cpu.allocatable
(gauge)
node CPU allocatable
Shown as core
alibabacloud.container_service.node.cpu.capacity
(gauge)
node CPU capacity
Shown as core
alibabacloud.container_service.node.cpu.limit
(gauge)
node CPU limit
Shown as core
alibabacloud.container_service.node.cpu.oversale_rate
(rate)
node CPU oversale rate
Shown as core
alibabacloud.container_service.node.cpu.request
(gauge)
node CPU request
Shown as core
alibabacloud.container_service.node.cpu.usage_rate
(rate)
node CPU usage rate
Shown as core
alibabacloud.container_service.node.cpu.utilization
(gauge)
node CPU utilization
Shown as percent
alibabacloud.container_service.node.filesystem.available
(gauge)
node filesystem available
Shown as node
alibabacloud.container_service.node.filesystem.inodes
(gauge)
node filesystem inodes
Shown as inode
alibabacloud.container_service.node.filesystem.limit
(gauge)
node filesystem limit
Shown as node
alibabacloud.container_service.node.filesystem.usage
(gauge)
node filesystem usage
Shown as node
alibabacloud.container_service.node.memory.allocatable
(gauge)
node memory allocatable
Shown as byte
alibabacloud.container_service.node.memory.cache
(gauge)
node memory cache
Shown as byte
alibabacloud.container_service.node.memory.limit
(gauge)
node memory limit
Shown as byte
alibabacloud.container_service.node.memory.oversale_rate
(gauge)
node memory oversale rate
Shown as percent
alibabacloud.container_service.node.memory.request
(gauge)
node memory request
Shown as byte
alibabacloud.container_service.node.memory.usage
(gauge)
node memory usage
Shown as byte
alibabacloud.container_service.node.memory.utilization
(gauge)
node memory utilization
Shown as percent
alibabacloud.container_service.node.memory.working_set
(gauge)
node memory working set
Shown as byte
alibabacloud.container_service.node.network.rx_errors
(gauge)
node network rx errors
Shown as error
alibabacloud.container_service.node.network.rx_errors_rate
(rate)
node network rx errors rate
Shown as byte
alibabacloud.container_service.node.network.rx_rate
(rate)
node network rx rate
Shown as byte
alibabacloud.container_service.node.network.tx_errors_rate
(rate)
node network tx errors rate
Shown as byte
alibabacloud.container_service.node.network.tx_rate
(rate)
node network tx rate
Shown as byte
alibabacloud.container_service.ns.cpu.limit
(gauge)
ns CPU limit
Shown as core
alibabacloud.container_service.pod.cpu.limit
(gauge)
pod CPU limit
Shown as core
alibabacloud.container_service.pod.cpu.oversale_rate
(gauge)
pod CPU oversale rate
Shown as percent
alibabacloud.container_service.pod.cpu.request
(gauge)
pod CPU request
Shown as core
alibabacloud.container_service.pod.cpu.usage_rate
(rate)
pod CPU usage rate
Shown as core
alibabacloud.container_service.pod.cpu.utilization
(gauge)
pod CPU utilization
Shown as percent
alibabacloud.container_service.pod.memory.cache
(gauge)
pod memory cache
Shown as byte
alibabacloud.container_service.pod.memory.limit
(gauge)
pod memory limit
Shown as byte
alibabacloud.container_service.pod.memory.oversale_rate
(gauge)
pod memory oversale rate
Shown as percent
alibabacloud.container_service.pod.memory.request
(gauge)
pod memory request
Shown as byte
alibabacloud.container_service.pod.memory.rss
(gauge)
pod memory rss
Shown as byte
alibabacloud.container_service.pod.memory.utilization
(gauge)
pod memory utilization
Shown as percent
alibabacloud.container_service.pod.memory.working_set
(gauge)
pod memory working set
Shown as byte
alibabacloud.container_service.pod.network.rx_errors_rate
(rate)
pod network rx errors rate
Shown as byte
alibabacloud.container_service.pod.network.rx_rate
(rate)
pod network rx rate
Shown as byte
alibabacloud.container_service.pod.network.tx_errors_rate
(rate)
pod network tx errors rate
Shown as byte
alibabacloud.container_service.pod.network.tx_rate
(rate)
pod network tx rate
Shown as byte
alibabacloud.container_service.deployment.filesystem.available
(gauge)
deployment filesystem available
Shown as byte
alibabacloud.container_service.deployment.filesystem.limit
(gauge)
deployment filesystem limit
Shown as byte
alibabacloud.container_service.pod.filesystem.available
(gauge)
pod filesystem available
Shown as byte
alibabacloud.container_service.pod.filesystem.limit
(gauge)
pod filesystem limit
Shown as byte
alibabacloud.container_service.cluster.filesystem.available
(gauge)
cluster filesystem available
Shown as byte
alibabacloud.container_service.cluster.filesystem.limit
(gauge)
cluster filesystem limit
Shown as byte
alibabacloud.container_service.count
(gauge)
Number of clusters
Shown as instance
alibabacloud.container_service.number_of_nodes
(gauge)
Number of nodes
Shown as node
alibabacloud.express_connect.intranet_rx
(gauge)
Inbound network traffic
Shown as byte
alibabacloud.express_connect.intranet_tx
(gauge)
Outbound network traffic
Shown as byte
alibabacloud.express_connect.receive_bandwidth
(rate)
Inbound network bandwidth
Shown as bit
alibabacloud.express_connect.transported_bandwidth
(rate)
Outbound network bandwidth
Shown as bit
alibabacloud.express_connect.router_interface_response_time.maximum
(gauge)
Latency
Shown as millisecond
alibabacloud.express_connect.router_interface_loss_rate.maximum
(gauge)
The percentage of the packet loss rate
Shown as percent
alibabacloud.express_connect.count
(gauge)
Number of instances
Shown as instance
alibabacloud.express_connect.bytes_out_from_vpc_to_idc
(gauge)
Number of outbound bytes from VPC to IDC
Shown as byte
alibabacloud.express_connect.pkgs_drop_in_from_idc_to_vpc
(rate)
Number of dropped incoming packets per second from IDC to VPC
Shown as packet
alibabacloud.express_connect.pkgs_drop_out_from_vpc_to_idc
(rate)
Number of dropped outgoing packets per second from VPC to IDC
Shown as packet
alibabacloud.express_connect.pkgs_in_from_idc_to_vpc
(rate)
Number of incoming packets per second from IDC to VPC
Shown as packet
alibabacloud.express_connect.pkgs_out_from_vpc_to_idc
(rate)
Number of outgoing packets per second from VPC to IDC
Shown as packet
alibabacloud.express_connect.rate_in_from_idc_to_vpc
(rate)
Number of incoming bits per second from IDC to VPC
Shown as bit
alibabacloud.express_connect.rate_out_from_vpc_to_idc
(rate)
Number of outgoing bits per second from VPC to IDC
Shown as bit
alibabacloud.express_connect.vbr_healthy_check_latency
(gauge)
VBR latency
Shown as microsecond
alibabacloud.express_connect.vbr_healthy_check_loss_rate
(gauge)
VBR loss rate
Shown as percent
alibabacloud.dcdn.code_count_1.maximum
(gauge)
Number of instance edge nodes 1XX
Shown as instance
alibabacloud.dcdn.code_count_2.maximum
(gauge)
Number of instance edge nodes 2XX
Shown as instance
alibabacloud.dcdn.code_count_3.maximum
(gauge)
Number of instance edge nodes 3XX
Shown as instance
alibabacloud.dcdn.code_count_4.maximum
(gauge)
Number of instance edge nodes 4XX
Shown as instance
alibabacloud.dcdn.code_count_400.maximum
(gauge)
Number of instance edge nodes 400
Shown as instance
alibabacloud.dcdn.code_count_403.maximum
(gauge)
Number of instance edge nodes 403
Shown as instance
alibabacloud.dcdn.code_count_404.maximum
(gauge)
Number of instance edge nodes 404
Shown as instance
alibabacloud.dcdn.code_count_416.maximum
(gauge)
Number of instance edge nodes 416
Shown as instance
alibabacloud.dcdn.code_count_499.maximum
(gauge)
Number of instance edge nodes 499
Shown as instance
alibabacloud.dcdn.code_count_5.maximum
(gauge)
Number of instance edge nodes 5XX
Shown as instance
alibabacloud.dcdn.code_count_500.maximum
(gauge)
Number of instance edge nodes 500
Shown as instance
alibabacloud.dcdn.code_count_502.maximum
(gauge)
Number of instance edge nodes 502
Shown as instance
alibabacloud.dcdn.code_count_503.maximum
(gauge)
Number of instance edge nodes 503
Shown as instance
alibabacloud.dcdn.code_count_504.maximum
(gauge)
Number of instance edge nodes 504
Shown as instance
alibabacloud.dcdn.code_ratio_400.maximum
(gauge)
Ratio of instance edge nodes to 400
Shown as percentage
alibabacloud.dcdn.code_ratio_403.maximum
(gauge)
Ratio of instance edge nodes to 403
Shown as percentage
alibabacloud.dcdn.code_ratio_404.maximum
(gauge)
Ratio of instance edge nodes to 404
Shown as percentage
alibabacloud.dcdn.code_ratio_416.maximum
(gauge)
Ratio of instance edge nodes to 416
Shown as percentage
alibabacloud.dcdn.code_ratio_499.maximum
(gauge)
Ratio of instance edge nodes to 499
Shown as percentage
alibabacloud.dcdn.code_ratio_500.maximum
(gauge)
Ratio of instance edge nodes to 500
Shown as percentage
alibabacloud.dcdn.code_ratio_502.maximum
(gauge)
Ratio of instance edge nodes to 502
Shown as percentage
alibabacloud.dcdn.code_ratio_503.maximum
(gauge)
Ratio of instance edge nodes to 503
Shown as percentage
alibabacloud.dcdn.code_ratio_504.maximum
(gauge)
Ratio of instance edge nodes to 504
Shown as percentage
alibabacloud.dcdn.ori_acc.maximum
(gauge)
Number of requests back to the origin server
Shown as instance
alibabacloud.dcdn.ori_bandwidth.maximum
(rate)
Bandwidth back to the origin station
Shown as bit
alibabacloud.dcdn.ori_code_count_1.maximum
(gauge)
Number of back-to-origin 1XX
Shown as instance
alibabacloud.dcdn.ori_code_count_2.maximum
(gauge)
Number of back-to-origin 2XX
Shown as instance
alibabacloud.dcdn.ori_code_count_3.maximum
(gauge)
Number of back-to-origin 3XX
Shown as instance
alibabacloud.dcdn.ori_code_count_4.maximum
(gauge)
Number of back-to-origin 4XX
Shown as instance
alibabacloud.dcdn.ori_code_count_400.maximum
(gauge)
Number of back-to-source 400
Shown as instance
alibabacloud.dcdn.ori_code_count_403.maximum
(gauge)
Number of back-to-source 403
Shown as instance
alibabacloud.dcdn.ori_code_count_404.maximum
(gauge)
Number of back-to-source 404
Shown as instance
alibabacloud.dcdn.ori_code_count_416.maximum
(gauge)
Number of back-to-source 416
Shown as instance
alibabacloud.dcdn.ori_code_count_499.maximum
(gauge)
Number of back-to-source 499
Shown as instance
alibabacloud.dcdn.ori_code_count_500.maximum
(gauge)
Number of back-to-source 500
Shown as instance
alibabacloud.dcdn.ori_code_count_502.maximum
(gauge)
Number of back-to-source 503
Shown as instance
alibabacloud.dcdn.ori_code_count_503.maximum
(gauge)
Number of back-to-source 503
Shown as instance
alibabacloud.dcdn.ori_code_count_504.maximum
(gauge)
Number of back-to-source 504
Shown as instance
alibabacloud.dcdn.ori_code_ratio_1.maximum
(gauge)
Proportion of 1XX back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_2.maximum
(gauge)
Proportion of 2XX back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_3.maximum
(gauge)
Proportion of 3XX back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_4.maximum
(gauge)
Proportion of 4XX back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_400.maximum
(gauge)
Proportion of 400 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_403.maximum
(gauge)
Proportion of 403 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_404.maximum
(gauge)
Proportion of 404 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_416.maximum
(gauge)
Proportion of 416 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_499.maximum
(gauge)
Proportion of 499 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_500.maximum
(gauge)
Proportion of 500 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_502.maximum
(gauge)
Proportion of 502 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_503.maximum
(gauge)
Proportion of 503 back-to-source
Shown as percentage
alibabacloud.dcdn.ori_code_ratio_504.maximum
(gauge)
Proportion of 504 back-to-source
Shown as percentage
alibabacloud.dcdn.bps_in.maximum
(rate)
Inbound bandwidth
Shown as bit
alibabacloud.dcdn.bps_in_http.maximum
(rate)
Http inbound bandwidth
Shown as bit
alibabacloud.dcdn.bps_in_ws.maximum
(rate)
Websocket inbound bandwidth
Shown as bit
alibabacloud.dcdn.bps_out.maximum
(rate)
Outbound bandwidth
Shown as bit
alibabacloud.dcdn.bps_out_http.maximum
(rate)
Http outbound bandwidth
Shown as bit
alibabacloud.dcdn.bps_out_ws.maximum
(rate)
Websocket outbound bandwidth
Shown as bit
alibabacloud.dcdn.code_count_499_http.average
(gauge)
Number of Http499 status codes
Shown as instance
alibabacloud.dcdn.code_count_499_http.minimum
(gauge)
Number of Http499 status codes
Shown as instance
alibabacloud.dcdn.code_count_499_http.maximum
(gauge)
Number of Http499 status codes
Shown as instance
alibabacloud.dcdn.code_count_499_ws.average
(gauge)
Number of Websocket499 status codes
Shown as instance
alibabacloud.dcdn.code_count_499_ws.minimum
(gauge)
Number of Websocket499 status codes
Shown as instance
alibabacloud.dcdn.code_count_499_ws.maximum
(gauge)
Number of Websocket499 status codes
Shown as instance
alibabacloud.dcdn.code_ratio_1.maximum
(gauge)
1XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_1_http.maximum
(gauge)
Http1XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_1_ws.maximum
(gauge)
Websocket1XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_2.maximum
(gauge)
2XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_2_http.maximum
(gauge)
Http2XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_2_ws.maximum
(gauge)
Websocket2XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_3.maximum
(gauge)
3XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_3_http.maximum
(gauge)
Http3XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_3_ws.maximum
(gauge)
Websocket3XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_4.maximum
(gauge)
4XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_499_http.maximum
(gauge)
Http499 status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_499_ws.maximum
(gauge)
Websocket499 status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_4_http.maximum
(gauge)
Http4XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_4_ws.maximum
(gauge)
Websocket4XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_5.maximum
(gauge)
5XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_5_http.maximum
(gauge)
Http5XX status code ratio
Shown as percentage
alibabacloud.dcdn.code_ratio_5_ws.maximum
(gauge)
Websocket5XX status code ratio
Shown as percentage
alibabacloud.dcdn.dcdn_qps.maximum
(rate)
Requests per second
Shown as request
alibabacloud.dcdn.dcdn_qps_http.maximum
(rate)
Http requests per second
Shown as request
alibabacloud.dcdn.dcdn_qps_ws.maximum
(rate)
Websocket requests per second
Shown as request
alibabacloud.dcdn.hit_rate.maximum
(gauge)
Byte hit rate
Shown as percentage
alibabacloud.dcdn.hit_rate_http.maximum
(gauge)
Http hit rate
Shown as percentage
alibabacloud.dcdn.hit_rate_ws.maximum
(gauge)
Websocket hit rate
Shown as percentage
alibabacloud.dcdn.rt.maximum
(gauge)
Request time
Shown as millisecond
alibabacloud.dcdn.rt_http.maximum
(gauge)
Http request time
Shown as millisecond
alibabacloud.dcdn.rt_ws.maximum
(gauge)
Websocket request time
Shown as millisecond
alibaabcloud.dcdn.waf_acl_block_qps.value
(rate)
DCDN WAF custom rule interception rate per second
Shown as instance
alibaabcloud.dcdn.waf_web_block_qps.value
(rate)
DCDN WAF basic protection interception rate per second
Shown as instance

Events

Events from Alibaba Cloud are collected on a per Alibaba Cloud-service basis.

Troubleshooting

Need help? Contact Datadog support.

Further Reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers