選択した Datadog サイト () では Cloud Cost Management はサポートされていません。

概要

Datadog Cloud Cost Management (CCM) automatically allocates the costs of your cloud clusters to individual services and workloads running in those clusters. Use cost metrics enriched with tags from pods, nodes, containers, and tasks to visualize container workload cost in the context of your entire cloud bill.

Clouds
CCM allocates costs of your AWS, Azure, or Google host instances. A host is a computer (such as an EC2 instance in AWS, a virtual machine in Azure, or a Compute Engine instance in Google Cloud) that is listed in your cloud provider’s cost and usage report and may be running Kubernetes pods.
Resources
CCM allocates costs for Kubernetes clusters and includes cost analysis for many associated resources such as Kubernetes persistent volumes used by your pods.

CCM displays costs for resources including CPU, memory, and more depending on the cloud and orchestrator you are using on the Containers page.

Cloud cost allocation table showing requests and idle costs over the past month on the Containers page

前提条件

CCM allocates costs of AWS ECS clusters as well as all Kubernetes clusters, including those managed through Elastic Kubernetes Service (EKS).

The following table presents the list of collected features and the minimal Agent and Cluster Agent versions for each.

機能最低限必要な Agent のバージョン最低限必要な Cluster Agent のバージョン
コンテナコスト割当7.27.01.11.0
AWS Persistent Volume Allocation7.46.01.11.0
  1. Configure the AWS Cloud Cost Management integration on the Cloud Costs Setup page.
  2. For Kubernetes support, install the Datadog Agent in a Kubernetes environment and ensure that you enable the Orchestrator Explorer in your Agent configuration.
  3. For AWS ECS support, set up Datadog Container Monitoring in ECS tasks.
  4. Optionally, enable AWS Split Cost Allocation for usage-based ECS allocation.

CCM allocates costs of all Kubernetes clusters, including those managed through Azure Kubernetes Service (AKS).

The following table presents the list of collected features and the minimal Agent and Cluster Agent versions for each.

機能最低限必要な Agent のバージョン最低限必要な Cluster Agent のバージョン
コンテナコスト割当7.27.01.11.0
  1. Configure the Azure Cost Management integration on the Cloud Costs Setup page.
  2. Install the Datadog Agent in a Kubernetes environment and ensure that you enable the Orchestrator Explorer in your Agent configuration.

CCM allocates costs of all Kubernetes clusters, including those managed through Google Kubernetes Engine (GKE).

The following table presents the list of collected features and the minimal Agent and Cluster Agent versions for each.

機能最低限必要な Agent のバージョン最低限必要な Cluster Agent のバージョン
コンテナコスト割当7.27.01.11.0
  1. Configure the Google Cloud Cost Management integration on the Cloud Costs Setup page.
  2. Install the Datadog Agent in a Kubernetes environment and ensure that you enable the Orchestrator Explorer in your Agent configuration.

コストの割り当て

Cost allocation divides host compute and other resource costs from your cloud provider into individual tasks or pods associated with them. These divided costs are then enriched with tags from related resources so you can break down costs by any associated dimensions.

Use the allocated_resource tag to visualize the spend resource associated with your costs at various levels, including the Kubernetes node, container orchestration host, storage volume, or entire cluster level.

These divided costs are enriched with tags from nodes, pods, tasks, and volumes. You can use these tags to break down costs by any associated dimensions.

Compute

For Kubernetes compute allocation, a Kubernetes node is joined with its associated host instance costs. The node’s cluster name and all node tags are added to the entire compute cost for the node. This allows you to associate cluster-level dimensions with the cost of the instance, without considering the pods scheduled to the node.

次に、Datadog はその日に該当ノード上で動作していたすべてのポッドを調査します。ノードのコストは、ポッドが使用したリソースとその実行時間に基づいて割り当てられます。この算出されたコストは、ポッドのすべてのタグを含めて詳細化されます。

Note: Only tags from pods and nodes are added to cost metrics. To include labels, enable labels as tags for nodes and pods.

All other costs are given the same value and tags as the source metric aws.cost.amortized.

Persistent volume storage

For Kubernetes Persistent Volume storage allocation, Persistent Volumes (PV), Persistent Volume Claims (PVC), nodes, and pods are joined with their associated EBS volume costs. All associated PV, PVC, node, and pod tags are added to the EBS volume cost line items.

Next, Datadog looks at all of the pods that claimed the volume on that day. The cost of the volume is allocated to a pod based on the resources it used and the length of time it ran. These resources include the provisioned capacity for storage, IOPS, and throughput. This allocated cost is enriched with all of the pod’s tags.

AWS ECS on EC2

ECS の割り当てにおいて、Datadog は ECS に使用された各 EC2 インスタンスでどのタスクが実行されたかを判定します。AWS Split Cost Allocation を有効にすると、メトリクスは予約ではなく使用量に基づいて ECS コストを割り当てるため、より細かい詳細が得られます。

タスクが使用したリソースに基づいて、Datadog はインスタンスのコンピュートコストの適切な部分をそのタスクに割り当てます。算出されたコストは、タスクのすべてのタグおよびタスク内で動作しているコンテナの全てのタグ (コンテナ名を除く) によって詳細化されます。

AWS ECS on Fargate

ECS tasks that run on Fargate are already fully allocated in the CUR. CCM enriches that data by adding out-of-the-box tags and container tags to the AWS Fargate cost.

Compute

For Kubernetes compute allocation, a Kubernetes node is joined with its associated host instance costs. The node’s cluster name and all node tags are added to the entire compute cost for the node. This allows you to associate cluster-level dimensions with the cost of the instance, without considering the pods scheduled to the node.

次に、Datadog はその日に該当ノード上で動作していたすべてのポッドを調査します。ノードのコストは、ポッドが使用したリソースとその実行時間に基づいて割り当てられます。この算出されたコストは、ポッドのすべてのタグを含めて詳細化されます。

Note: Only tags from pods and nodes are added to cost metrics. To include labels, enable labels as tags for nodes and pods.

All other costs are given the same value and tags as the source metric azure.cost.amortized.

Compute

For Kubernetes compute allocation, a Kubernetes node is joined with its associated host instance costs. The node’s cluster name and all node tags are added to the entire compute cost for the node. This allows you to associate cluster-level dimensions with the cost of the instance, without considering the pods scheduled to the node.

次に、Datadog はその日に該当ノード上で動作していたすべてのポッドを調査します。ノードのコストは、ポッドが使用したリソースとその実行時間に基づいて割り当てられます。この算出されたコストは、ポッドのすべてのタグを含めて詳細化されます。

Note: Only tags from pods and nodes are added to cost metrics. To include labels, enable labels as tags for nodes and pods.

All other costs are given the same value and tags as the source metric gcp.cost.amortized.

Agentless Kubernetes costs

To view the costs of GKE clusters without enabling Datadog Infrastructure Monitoring, use GKE cost allocation. Enable GKE cost allocation on unmonitored GKE clusters to access this feature set.

Limitations and differences from the Datadog Agent

  • There is no support for tracking workload idle costs.
  • The cost of individual pods are not tracked, only the aggregated cost of a workload and the namespace. There is no pod_name tag.
  • GKE enriches data using pod labels only and ignores any Datadog tags you add.
  • The full list of limitations can be found in the official GKE documentation.

To enable GKE cost allocation, see the official GKE documentation.

支出の把握

Use the allocated_spend_type tag to visualize the spend category associated with your costs at various levels, including the Kubernetes node, container orchestration host, storage volume, or entire cluster level.

Compute

The cost of a host instance is split into two components: 60% for the CPU and 40% for the memory. Each component is allocated to individual workloads based on their resource reservations and usage.

Costs are allocated into the following spend types:

Spend type説明
使用方法Cost of resources (such as memory and CPU) used by workloads, based on the average usage on that day.
Workload idleCost of resources (such as memory and CPU) that are reserved and allocated but not used by workloads. This is the difference between the total resources requested and the average usage.
Cluster idleCost of resources (such as memory and CPU) that are not reserved by workloads in a cluster. This is the difference between the total cost of the resources and what is allocated to workloads.

Persistent volume

The cost of an AWS EBS volume has three components: IOPS, throughput, and storage. Each is allocated according to a pod’s usage when the volume is mounted.

Spend type説明
使用方法Cost of provisioned IOPS, throughput, or storage used by workloads. Storage cost is based on the maximum amount of volume storage used that day, while IOPS and throughput costs are based on the average amount of volume storage used that day.
Workload idleCost of provisioned IOPS, throughput, or storage that are reserved and allocated but not used by workloads. Storage cost is based on the maximum amount of volume storage used that day, while IOPS and throughput costs are based on the average amount of volume storage used that day. This is the difference between the total resources requested and the average usage. Note: This tag is only available if you have enabled Resource Collection in your AWS Integration. To prevent being charged for Cloud Security Posture Management, ensure that during the Resource Collection setup, the Cloud Security Posture Management box is unchecked.
Cluster idleCost of provisioned IOPS, throughput, or storage that are not reserved by any pods that day. This is the difference between the total cost of the resources and what is allocated to workloads.

Note: Persistent volume allocation is only supported in Kubernetes clusters, and is only available for pods that are part of a Kubernetes StatefulSet.

Compute

The cost of a host instance is split into two components: 60% for the CPU and 40% for the memory. Each component is allocated to individual workloads based on their resource reservations and usage.

Costs are allocated into the following spend types:

Spend type説明
使用方法Cost of resources (such as memory and CPU) used by workloads, based on the average usage on that day.
Workload idleCost of resources (such as memory and CPU) that are reserved and allocated but not used by workloads. This is the difference between the total resources requested and the average usage.
Cluster idleCost of resources (such as memory and CPU) that are not reserved by workloads in a cluster. This is the difference between the total cost of the resources and what is allocated to workloads.

Compute

The cost of a host instance is split into two components: 60% for the CPU and 40% for the memory. Each component is allocated to individual workloads based on their resource reservations and usage.

Costs are allocated into the following spend types:

Spend type説明
使用方法Cost of resources (such as memory and CPU) used by workloads, based on the average usage on that day.
Workload idleCost of resources (such as memory and CPU) that are reserved and allocated but not used by workloads. This is the difference between the total resources requested and the average usage.
Cluster idleCost of resources (such as memory and CPU) that are not reserved by workloads in a cluster. This is the difference between the total cost of the resources and what is allocated to workloads.
Not monitoredCost of resources where the spend type is unknown. To resolve this, install the Datadog Agent on these clusters or nodes.

Understanding resources

Depending on the cloud provider, certain resources may or may not be available for cost allocation.

ResourceAWSAzureGoogle Cloud
CPU
メモリ
Persistent volumes

Storage resources within a cluster, provisioned by administrators or dynamically, that persist data independently of pod lifecycles.

Managed service fees

Cost of associated fees charged by the cloud provider for managing the cluster, such as fees for managed Kubernetes services or other container orchestration options.

ECS costsN/AN/A
Networking costsLimited*Limited*
GPULimited*
Local storage

Directly-attached storage resources for a node.

Limited*Limited*

Limited* resources have been identified as part of your Kubernetes spend, but are not fully allocated to specific workloads or pods. These resources are host-level costs, not pod or namespace-level costs, and are identified with allocated_spend_type:<resource>_not_supported.

コストメトリクス

When the prerequisites are met, the following cost metrics automatically appear.

Cost Metric説明
aws.cost.amortized.shared.resources.allocatedEC2 costs allocated by the CPU & memory used by a pod or ECS task, using a 60:40 split for CPU & memory respectively. Also includes allocated EBS costs.
Based on aws.cost.amortized
aws.cost.net.amortized.shared.resources.allocatedNet EC2 costs allocated by CPU & memory used by a pod or ECS task, using a 60:40 split for CPU & memory respectively. Also includes allocated AWS EBS costs.
Based on aws.cost.net.amortized, if available
Cost Metric説明
azure.cost.amortized.shared.resources.allocatedAzure VM costs allocated by the CPU & memory used by a pod or container task, using a 60:40 split for CPU & memory respectively. Also includes allocated Azure costs.
Based on azure.cost.amortized
Cost Metric説明
gcp.cost.amortized.shared.resources.allocatedGoogle Compute Engine costs allocated by the CPU & memory used by a pod, using 60:40 split for CPU & memory respectively. This allocation method is used when the bill does not already provide a specific split between CPU and memory usage.
Based on gcp.cost.amortized

These cost metrics include all of your cloud costs. This allows you to continue visualizing all of your cloud costs at one time.

For example, say you have the tag team on a storage bucket, a cloud provider managed database, and Kubernetes pods. You can use these metrics to group costs by team, which includes the costs for all three.

Applying tags

Datadog consolidates and applies the following tags from various sources to cost metrics.

Kubernetes

In addition to Kubernetes pod and Kubernetes node tags, the following non-exhaustive list of out-of-the-box tags are applied to cost metrics:

すぐに使えるタグ説明
orchestrator:kubernetesThe orchestration platform associated with the item is Kubernetes.
kube_cluster_nameKubernetes クラスターの名前。
kube_namespaceThe namespace where workloads are running.
kube_deploymentThe name of the Kubernetes Deployment.
kube_stateful_setThe name of the Kubernetes StatefulSet.
pod_nameThe name of any individual pod.

Conflicts are resolved by favoring higher-specificity tags such as pod tags over lower-specificity tags such as host tags. For example, a Kubernetes pod tagged service:datadog-agent running on a node tagged service:aws-node results in a final tag service:datadog-agent.

Persistent volume

In addition to Kubernetes pod and Kubernetes node tags, the following out-of-the-box tags are applied to cost metrics.

すぐに使えるタグ説明
persistent_volume_reclaim_policyThe Kubernetes Reclaim Policy on the Persistent Volume.
storage_class_nameThe Kubernetes Storage Class used to instantiate the Persistent Volume.
volume_modeThe Volume Mode of the Persistent Volume.
ebs_volume_typeThe type of the AWS EBS volume. Can be gp3, gp2, or others.

Amazon ECS

In addition to ECS task tags, the following out-of-the-box tags are applied to cost metrics.

Note: Most tags from ECS containers are applied (excluding container_name).

すぐに使えるタグ説明
orchestrator:ecsThe orchestration platform associated with the item is AWS ECS.
ecs_cluster_nameECS クラスターの名前。
is_aws_ecsECS の実行に関連するすべてのコスト。
is_aws_ecs_on_ec2EC2 上の ECS の実行に関連するすべての EC2 コンピュートコスト。
is_aws_ecs_on_fargateFargate 上の ECS の実行に関連するすべてのコスト。

Kubernetes

In addition to Kubernetes pod and Kubernetes node tags, the following non-exhaustive list of out-of-the-box tags are applied to cost metrics:

すぐに使えるタグ説明
orchestrator:kubernetesThe orchestration platform associated with the item is Kubernetes.
kube_cluster_nameKubernetes クラスターの名前。
kube_namespaceThe namespace where workloads are running.
kube_deploymentThe name of the Kubernetes Deployment.
kube_stateful_setThe name of the Kubernetes StatefulSet.
pod_nameThe name of any individual pod.
allocated_resource:data_transferThe tracking and allocation of costs associated with data transfer activities used by Azure services or workloads.
allocated_resource:local_storageThe tracking and allocation of costs at a host level associated with local storage resources used by Azure services or workloads.

Kubernetes

In addition to Kubernetes pod and Kubernetes node tags, the following non-exhaustive list of out-of-the-box tags are applied to cost metrics:

すぐに使えるタグ説明
orchestrator:kubernetesThe orchestration platform associated with the item is Kubernetes.
kube_cluster_nameKubernetes クラスターの名前。
kube_namespaceThe namespace where workloads are running.
kube_deploymentThe name of the Kubernetes Deployment.
kube_stateful_setThe name of the Kubernetes StatefulSet.
pod_nameThe name of any individual pod.
allocated_spend_type:not_monitoredThe tracking and allocation of Agentless Kubernetes costs associated with resources used by Google Cloud services or workloads, and the Datadog Agent is not monitoring those resources.
allocated_resource:data_transferThe tracking and allocation of costs associated with data transfer activities used by Google Cloud services or workloads.
allocated_resource:gpuThe tracking and allocation of costs at a host level associated with GPU resources used by Google Cloud services or workloads.
allocated_resource:local_storageThe tracking and allocation of costs at a host level associated with local storage resources used by Google Cloud services or workloads.

参考資料

お役に立つドキュメント、リンクや記事:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers