Install Datadog CoTerm

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

CoTerm is supported on macOS and Linux.

  1. Install Datadog CoTerm with Homebrew or curl:

    brew (macOS only)

    brew install coterm
    

    curl

    curl --tlsv1.2 --proto '=https' -sSf 'https://coterm.datadoghq.com/install-ddcoterm.sh' | bash
    

    This command downloads the latest version of CoTerm to .ddcoterm/bin/ddcoterm and updates your PATH in .bashrc and .zshrc. Restart your terminal or source your profile. If you are using a shell other than Bash or Zsh, add path/to/.ddcoterm/bin to your PATH manually.

  2. If your Datadog site is not https://app.datadoghq.com, set your site in .ddcoterm/config.yaml under connection_config.host:

    ...
    connection_config:
      host: 
    ...
    
  3. Initialize your configuration file by running:

    ddcoterm init
    

    Select your settings. You can change these settings in the ~/.ddcoterm/config.yaml file.

Authorize CoTerm to connect to Datadog

During initialization, you can choose one of the following ways to authorize CoTerm to access your Datadog Account:

  • OAuth: Opens a browser for you to log in with OAuth.
  • API Key + App Key: Prompts you to set your Datadog API key and application key in ~/.ddcoterm/config.yaml.
  • API Key Only: Prompts you to set your Datadog API key in ~/.ddcoterm/config.yaml.
If you select the API Key Only option, you cannot require approvals with Case Management.

Configure your CoTerm settings

The ~/.ddcoterm/config.yaml file contains your CoTerm configurations:

process_config
Configure CoTerm to act as a linter and take certain actions when it intercepts a command that matches a rule. See CoTerm Configuration Rules.
enable_telemetry
Enable or disable sending telemetry to Datadog. Defaults to false.
enable_ptrace
Enable or disable experimental ptrace-based process monitoring on Linux. Defaults to false.
connection_config
host
Host for connecting to Datadog. Defaults to https://app.datadoghq.com.
port
Port for connecting to Datadog. Defaults to 443.
api_key
If you are not using OAuth, your Datadog API key. If you have enabled OAuth, CoTerm defaults to using OAuth and ignores api_key.
app_key
If you are not using OAuth, your Datadog application key.
Note: To require approvals with Case Management, you must use OAuth or specify both your API key and application key in this file.

Next steps

  • Run ddcoterm to start a recorded terminal session.
  • Learn more about using CoTerm.

Uninstall

To uninstall CoTerm, delete the .ddcoterm folder.

Further reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers