このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

aws_ec2_instance

account_id

Type: STRING

ami_launch_index

Type: INT32
Provider name: AmiLaunchIndex
Description: The AMI launch index, which can be used to find this instance in the launch group.

architecture

Type: STRING
Provider name: Architecture
Description: The architecture of the image.

block_device_mappings

Type: UNORDERED_LIST_STRUCT
Provider name: BlockDeviceMappings
Description: Any block device mapping entries for the instance.

  • device_name
    Type: STRING
    Provider name: DeviceName
    Description: The device name (for example, /dev/sdh or xvdh).
  • ebs
    Type: STRUCT
    Provider name: Ebs
    Description: Parameters used to automatically set up EBS volumes when the instance is launched.
    • associated_resource
      Type: STRING
      Provider name: AssociatedResource
      Description: The ARN of the Amazon ECS or Fargate task to which the volume is attached.
    • attach_time
      Type: TIMESTAMP
      Provider name: AttachTime
      Description: The time stamp when the attachment initiated.
    • delete_on_termination
      Type: BOOLEAN
      Provider name: DeleteOnTermination
      Description: Indicates whether the volume is deleted on instance termination.
    • operator
      Type: STRUCT
      Provider name: Operator
      Description: The service provider that manages the EBS volume.
      • managed
        Type: BOOLEAN
        Provider name: Managed
        Description: If true, the resource is managed by an service provider.
      • principal
        Type: STRING
        Provider name: Principal
        Description: If managed is true, then the principal is returned. The principal is the service provider that manages the resource.
    • status
      Type: STRING
      Provider name: Status
      Description: The attachment state.
    • volume_id
      Type: STRING
      Provider name: VolumeId
      Description: The ID of the EBS volume.
    • volume_owner_id
      Type: STRING
      Provider name: VolumeOwnerId
      Description: The ID of the Amazon Web Services account that owns the volume. This parameter is returned only for volumes that are attached to Fargate tasks.

boot_mode

Type: STRING
Provider name: BootMode
Description: The boot mode that was specified by the AMI. If the value is uefi-preferred, the AMI supports both UEFI and Legacy BIOS. The currentInstanceBootMode parameter is the boot mode that is used to boot the instance at launch or start. The operating system contained in the AMI must be configured to support the specified boot mode. For more information, see Boot modes in the Amazon EC2 User Guide.

capacity_reservation_id

Type: STRING
Provider name: CapacityReservationId
Description: The ID of the Capacity Reservation.

capacity_reservation_specification

Type: STRUCT
Provider name: CapacityReservationSpecification
Description: Information about the Capacity Reservation targeting option.

  • capacity_reservation_preference
    Type: STRING
    Provider name: CapacityReservationPreference
    Description: Describes the instance’s Capacity Reservation preferences. Possible preferences include:
    • open - The instance can run in any open Capacity Reservation that has matching attributes (instance type, platform, Availability Zone).
    • none - The instance avoids running in a Capacity Reservation even if one is available. The instance runs in On-Demand capacity.
  • capacity_reservation_target
    Type: STRUCT
    Provider name: CapacityReservationTarget
    Description: Information about the targeted Capacity Reservation or Capacity Reservation group.
    • capacity_reservation_id
      Type: STRING
      Provider name: CapacityReservationId
      Description: The ID of the targeted Capacity Reservation.
    • capacity_reservation_resource_group_arn
      Type: STRING
      Provider name: CapacityReservationResourceGroupArn
      Description: The ARN of the targeted Capacity Reservation group.

client_token

Type: STRING
Provider name: ClientToken
Description: The idempotency token you provided when you launched the instance, if applicable.

cpu_options

Type: STRUCT
Provider name: CpuOptions
Description: The CPU options for the instance.

  • amd_sev_snp
    Type: STRING
    Provider name: AmdSevSnp
    Description: Indicates whether the instance is enabled for AMD SEV-SNP. For more information, see AMD SEV-SNP.
  • core_count
    Type: INT32
    Provider name: CoreCount
    Description: The number of CPU cores for the instance.
  • threads_per_core
    Type: INT32
    Provider name: ThreadsPerCore
    Description: The number of threads per CPU core.

current_instance_boot_mode

Type: STRING
Provider name: CurrentInstanceBootMode
Description: The boot mode that is used to boot the instance at launch or start. For more information, see Boot modes in the Amazon EC2 User Guide.

ebs_optimized

Type: BOOLEAN
Provider name: EbsOptimized
Description: Indicates whether the instance is optimized for Amazon EBS I/O. This optimization provides dedicated throughput to Amazon EBS and an optimized configuration stack to provide optimal I/O performance. This optimization isn’t available with all instance types. Additional usage charges apply when using an EBS Optimized instance.

elastic_gpu_associations

Type: UNORDERED_LIST_STRUCT
Provider name: ElasticGpuAssociations
Description: Deprecated. Amazon Elastic Graphics reached end of life on January 8, 2024.

  • elastic_gpu_association_id
    Type: STRING
    Provider name: ElasticGpuAssociationId
    Description: The ID of the association.
  • elastic_gpu_association_state
    Type: STRING
    Provider name: ElasticGpuAssociationState
    Description: The state of the association between the instance and the Elastic Graphics accelerator.
  • elastic_gpu_association_time
    Type: STRING
    Provider name: ElasticGpuAssociationTime
    Description: The time the Elastic Graphics accelerator was associated with the instance.
  • elastic_gpu_id
    Type: STRING
    Provider name: ElasticGpuId
    Description: The ID of the Elastic Graphics accelerator.

elastic_inference_accelerator_associations

Type: UNORDERED_LIST_STRUCT
Provider name: ElasticInferenceAcceleratorAssociations
Description: Deprecated Amazon Elastic Inference is no longer available.

  • elastic_inference_accelerator_arn
    Type: STRING
    Provider name: ElasticInferenceAcceleratorArn
    Description: The Amazon Resource Name (ARN) of the elastic inference accelerator.
  • elastic_inference_accelerator_association_id
    Type: STRING
    Provider name: ElasticInferenceAcceleratorAssociationId
    Description: The ID of the association.
  • elastic_inference_accelerator_association_state
    Type: STRING
    Provider name: ElasticInferenceAcceleratorAssociationState
    Description: The state of the elastic inference accelerator.
  • elastic_inference_accelerator_association_time
    Type: TIMESTAMP
    Provider name: ElasticInferenceAcceleratorAssociationTime
    Description: The time at which the elastic inference accelerator is associated with an instance.

ena_support

Type: BOOLEAN
Provider name: EnaSupport
Description: Specifies whether enhanced networking with ENA is enabled.

enclave_options

Type: STRUCT
Provider name: EnclaveOptions
Description: Indicates whether the instance is enabled for Amazon Web Services Nitro Enclaves.

  • enabled
    Type: BOOLEAN
    Provider name: Enabled
    Description: If this parameter is set to true, the instance is enabled for Amazon Web Services Nitro Enclaves; otherwise, it is not enabled for Amazon Web Services Nitro Enclaves.

hibernation_options

Type: STRUCT
Provider name: HibernationOptions
Description: Indicates whether the instance is enabled for hibernation.

  • configured
    Type: BOOLEAN
    Provider name: Configured
    Description: If true, your instance is enabled for hibernation; otherwise, it is not enabled for hibernation.

hypervisor

Type: STRING
Provider name: Hypervisor
Description: The hypervisor type of the instance. The value xen is used for both Xen and Nitro hypervisors.

iam_instance_profile

Type: STRUCT
Provider name: IamInstanceProfile
Description: The IAM instance profile associated with the instance, if applicable.

  • arn
    Type: STRING
    Provider name: Arn
    Description: The Amazon Resource Name (ARN) of the instance profile.
  • id
    Type: STRING
    Provider name: Id
    Description: The ID of the instance profile.

image_id

Type: STRING
Provider name: ImageId
Description: The ID of the AMI used to launch the instance.

instance_arn

Type: STRING

instance_id

Type: STRING
Provider name: InstanceId
Description: The ID of the instance.

instance_lifecycle

Type: STRING
Provider name: InstanceLifecycle
Description: Indicates whether this is a Spot Instance or a Scheduled Instance.

instance_type

Type: STRING
Provider name: InstanceType
Description: The instance type.

ipv6_address

Type: STRING
Provider name: Ipv6Address
Description: The IPv6 address assigned to the instance.

kernel_id

Type: STRING
Provider name: KernelId
Description: The kernel associated with this instance, if applicable.

key_name

Type: STRING
Provider name: KeyName
Description: The name of the key pair, if this instance was launched with an associated key pair.

launch_template_data

Type: STRUCT
Provider name: LaunchTemplateData
Description: The instance data.

  • block_device_mappings
    Type: UNORDERED_LIST_STRUCT
    Provider name: BlockDeviceMappings
    Description: The block device mappings.
    • device_name
      Type: STRING
      Provider name: DeviceName
      Description: The device name.
    • ebs
      Type: STRUCT
      Provider name: Ebs
      Description: Information about the block device for an EBS volume.
      • delete_on_termination
        Type: BOOLEAN
        Provider name: DeleteOnTermination
        Description: Indicates whether the EBS volume is deleted on instance termination.
      • encrypted
        Type: BOOLEAN
        Provider name: Encrypted
        Description: Indicates whether the EBS volume is encrypted.
      • iops
        Type: INT32
        Provider name: Iops
        Description: The number of I/O operations per second (IOPS) that the volume supports.
      • kms_key_id
        Type: STRING
        Provider name: KmsKeyId
        Description: Identifier (key ID, key alias, key ARN, or alias ARN) of the customer managed KMS key to use for EBS encryption.
      • snapshot_id
        Type: STRING
        Provider name: SnapshotId
        Description: The ID of the snapshot.
      • throughput
        Type: INT32
        Provider name: Throughput
        Description: The throughput that the volume supports, in MiB/s.
      • volume_size
        Type: INT32
        Provider name: VolumeSize
        Description: The size of the volume, in GiB.
      • volume_type
        Type: STRING
        Provider name: VolumeType
        Description: The volume type.
    • no_device
      Type: STRING
      Provider name: NoDevice
      Description: To omit the device from the block device mapping, specify an empty string.
    • virtual_name
      Type: STRING
      Provider name: VirtualName
      Description: The virtual device name (ephemeralN).
  • capacity_reservation_specification
    Type: STRUCT
    Provider name: CapacityReservationSpecification
    Description: Information about the Capacity Reservation targeting option.
    • capacity_reservation_preference
      Type: STRING
      Provider name: CapacityReservationPreference
      Description: Indicates the instance’s Capacity Reservation preferences. Possible preferences include:
      • open - The instance can run in any open Capacity Reservation that has matching attributes (instance type, platform, Availability Zone).
      • none - The instance avoids running in a Capacity Reservation even if one is available. The instance runs in On-Demand capacity.
    • capacity_reservation_target
      Type: STRUCT
      Provider name: CapacityReservationTarget
      Description: Information about the target Capacity Reservation or Capacity Reservation group.
      • capacity_reservation_id
        Type: STRING
        Provider name: CapacityReservationId
        Description: The ID of the targeted Capacity Reservation.
      • capacity_reservation_resource_group_arn
        Type: STRING
        Provider name: CapacityReservationResourceGroupArn
        Description: The ARN of the targeted Capacity Reservation group.
  • cpu_options
    Type: STRUCT
    Provider name: CpuOptions
    Description: The CPU options for the instance. For more information, see Optimize CPU options in the Amazon EC2 User Guide.
    • amd_sev_snp
      Type: STRING
      Provider name: AmdSevSnp
      Description: Indicates whether the instance is enabled for AMD SEV-SNP. For more information, see AMD SEV-SNP.
    • core_count
      Type: INT32
      Provider name: CoreCount
      Description: The number of CPU cores for the instance.
    • threads_per_core
      Type: INT32
      Provider name: ThreadsPerCore
      Description: The number of threads per CPU core.
  • credit_specification
    Type: STRUCT
    Provider name: CreditSpecification
    Description: The credit option for CPU usage of the instance.
    • cpu_credits
      Type: STRING
      Provider name: CpuCredits
      Description: The credit option for CPU usage of a T instance. Valid values: standard | unlimited
  • disable_api_stop
    Type: BOOLEAN
    Provider name: DisableApiStop
    Description: Indicates whether the instance is enabled for stop protection. For more information, see Enable stop protection for your instance in the Amazon EC2 User Guide.
  • disable_api_termination
    Type: BOOLEAN
    Provider name: DisableApiTermination
    Description: If set to true, indicates that the instance cannot be terminated using the Amazon EC2 console, command line tool, or API.
  • ebs_optimized
    Type: BOOLEAN
    Provider name: EbsOptimized
    Description: Indicates whether the instance is optimized for Amazon EBS I/O.
  • elastic_gpu_specifications
    Type: UNORDERED_LIST_STRUCT
    Provider name: ElasticGpuSpecifications
    Description: Deprecated. Amazon Elastic Graphics reached end of life on January 8, 2024. For workloads that require graphics acceleration, we recommend that you use Amazon EC2 G4ad, G4dn, or G5 instances.
    • type
      Type: STRING
      Provider name: Type
      Description: Deprecated. Amazon Elastic Graphics reached end of life on January 8, 2024. For workloads that require graphics acceleration, we recommend that you use Amazon EC2 G4ad, G4dn, or G5 instances.
  • elastic_inference_accelerators
    Type: UNORDERED_LIST_STRUCT
    Provider name: ElasticInferenceAccelerators
    Description: Amazon Elastic Inference is no longer available. An elastic inference accelerator to associate with the instance. Elastic inference accelerators are a resource you can attach to your Amazon EC2 instances to accelerate your Deep Learning (DL) inference workloads. You cannot specify accelerators from different generations in the same request. Starting April 15, 2023, Amazon Web Services will not onboard new customers to Amazon Elastic Inference (EI), and will help current customers migrate their workloads to options that offer better price and performance. After April 15, 2023, new customers will not be able to launch instances with Amazon EI accelerators in Amazon SageMaker, Amazon ECS, or Amazon EC2. However, customers who have used Amazon EI at least once during the past 30-day period are considered current customers and will be able to continue using the service.
    • count
      Type: INT32
      Provider name: Count
      Description: The number of elastic inference accelerators to attach to the instance.
      Default: 1
    • type
      Type: STRING
      Provider name: Type
      Description: The type of elastic inference accelerator. The possible values are eia1.medium, eia1.large, and eia1.xlarge.
  • enclave_options
    Type: STRUCT
    Provider name: EnclaveOptions
    Description: Indicates whether the instance is enabled for Amazon Web Services Nitro Enclaves.
    • enabled
      Type: BOOLEAN
      Provider name: Enabled
      Description: If this parameter is set to true, the instance is enabled for Amazon Web Services Nitro Enclaves; otherwise, it is not enabled for Amazon Web Services Nitro Enclaves.
  • hibernation_options
    Type: STRUCT
    Provider name: HibernationOptions
    Description: Indicates whether an instance is configured for hibernation. For more information, see Hibernate your Amazon EC2 instance in the Amazon EC2 User Guide.
    • configured
      Type: BOOLEAN
      Provider name: Configured
      Description: If this parameter is set to true, the instance is enabled for hibernation; otherwise, it is not enabled for hibernation.
  • iam_instance_profile
    Type: STRUCT
    Provider name: IamInstanceProfile
    Description: The IAM instance profile.
    • arn
      Type: STRING
      Provider name: Arn
      Description: The Amazon Resource Name (ARN) of the instance profile.
    • name
      Type: STRING
      Provider name: Name
      Description: The name of the instance profile.
  • image_id
    Type: STRING
    Provider name: ImageId
    Description: The ID of the AMI or a Systems Manager parameter. The Systems Manager parameter will resolve to the ID of the AMI at instance launch. The value depends on what you specified in the request. The possible values are:
    • If an AMI ID was specified in the request, then this is the AMI ID.
    • If a Systems Manager parameter was specified in the request, and ResolveAlias was configured as true, then this is the AMI ID that the parameter is mapped to in the Parameter Store.
    • If a Systems Manager parameter was specified in the request, and ResolveAlias was configured as false, then this is the parameter value.
    For more information, see Use a Systems Manager parameter instead of an AMI ID in the Amazon EC2 User Guide.
  • instance_initiated_shutdown_behavior
    Type: STRING
    Provider name: InstanceInitiatedShutdownBehavior
    Description: Indicates whether an instance stops or terminates when you initiate shutdown from the instance (using the operating system command for system shutdown).
  • instance_market_options
    Type: STRUCT
    Provider name: InstanceMarketOptions
    Description: The market (purchasing) option for the instances.
    • market_type
      Type: STRING
      Provider name: MarketType
      Description: The market type.
    • spot_options
      Type: STRUCT
      Provider name: SpotOptions
      Description: The options for Spot Instances.
      • block_duration_minutes
        Type: INT32
        Provider name: BlockDurationMinutes
        Description: The required duration for the Spot Instances (also known as Spot blocks), in minutes. This value must be a multiple of 60 (60, 120, 180, 240, 300, or 360).
      • instance_interruption_behavior
        Type: STRING
        Provider name: InstanceInterruptionBehavior
        Description: The behavior when a Spot Instance is interrupted.
      • max_price
        Type: STRING
        Provider name: MaxPrice
        Description: The maximum hourly price you’re willing to pay for the Spot Instances. We do not recommend using this parameter because it can lead to increased interruptions. If you do not specify this parameter, you will pay the current Spot price. If you specify a maximum price, your Spot Instances will be interrupted more frequently than if you do not specify this parameter.
      • spot_instance_type
        Type: STRING
        Provider name: SpotInstanceType
        Description: The Spot Instance request type.
      • valid_until
        Type: TIMESTAMP
        Provider name: ValidUntil
        Description: The end date of the request. For a one-time request, the request remains active until all instances launch, the request is canceled, or this date is reached. If the request is persistent, it remains active until it is canceled or this date and time is reached.
  • instance_requirements
    Type: STRUCT
    Provider name: InstanceRequirements
    Description: The attributes for the instance types. When you specify instance attributes, Amazon EC2 will identify instance types with these attributes. If you specify InstanceRequirements, you can’t specify InstanceTypes.
    • accelerator_count
      Type: STRUCT
      Provider name: AcceleratorCount
      Description: The minimum and maximum number of accelerators (GPUs, FPGAs, or Amazon Web Services Inferentia chips) on an instance. To exclude accelerator-enabled instance types, set Max to 0.
      Default: No minimum or maximum limits
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum number of accelerators. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum number of accelerators. If this parameter is not specified, there is no minimum limit.
    • accelerator_manufacturers
      Type: UNORDERED_LIST_STRING
      Provider name: AcceleratorManufacturers
      Description: Indicates whether instance types must have accelerators by specific manufacturers.
      • For instance types with Amazon Web Services devices, specify amazon-web-services.
      • For instance types with AMD devices, specify amd.
      • For instance types with Habana devices, specify habana.
      • For instance types with NVIDIA devices, specify nvidia.
      • For instance types with Xilinx devices, specify xilinx.
      Default: Any manufacturer
    • accelerator_names
      Type: UNORDERED_LIST_STRING
      Provider name: AcceleratorNames
      Description: The accelerators that must be on the instance type.
      • For instance types with NVIDIA A10G GPUs, specify a10g.
      • For instance types with NVIDIA A100 GPUs, specify a100.
      • For instance types with NVIDIA H100 GPUs, specify h100.
      • For instance types with Amazon Web Services Inferentia chips, specify inferentia.
      • For instance types with NVIDIA GRID K520 GPUs, specify k520.
      • For instance types with NVIDIA K80 GPUs, specify k80.
      • For instance types with NVIDIA M60 GPUs, specify m60.
      • For instance types with AMD Radeon Pro V520 GPUs, specify radeon-pro-v520.
      • For instance types with NVIDIA T4 GPUs, specify t4.
      • For instance types with NVIDIA T4G GPUs, specify t4g.
      • For instance types with Xilinx VU9P FPGAs, specify vu9p.
      • For instance types with NVIDIA V100 GPUs, specify v100.
      Default: Any accelerator
    • accelerator_total_memory_mib
      Type: STRUCT
      Provider name: AcceleratorTotalMemoryMiB
      Description: The minimum and maximum amount of total accelerator memory, in MiB.
      Default: No minimum or maximum limits
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum amount of accelerator memory, in MiB. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum amount of accelerator memory, in MiB. If this parameter is not specified, there is no minimum limit.
    • accelerator_types
      Type: UNORDERED_LIST_STRING
      Provider name: AcceleratorTypes
      Description: The accelerator types that must be on the instance type.
      • For instance types with GPU accelerators, specify gpu.
      • For instance types with FPGA accelerators, specify fpga.
      Default: Any accelerator type
    • allowed_instance_types
      Type: UNORDERED_LIST_STRING
      Provider name: AllowedInstanceTypes
      Description: The instance types to apply your specified attributes against. All other instance types are ignored, even if they match your specified attributes. You can use strings with one or more wild cards, represented by an asterisk (), to allow an instance type, size, or generation. The following are examples: m5.8xlarge, c5., m5a., r*, 3. For example, if you specify c5*,Amazon EC2 will allow the entire C5 instance family, which includes all C5a and C5n instance types. If you specify m5a.*, Amazon EC2 will allow all the M5a instance types, but not the M5n instance types. If you specify AllowedInstanceTypes, you can’t specify ExcludedInstanceTypes.
      Default: All instance types
    • bare_metal
      Type: STRING
      Provider name: BareMetal
      Description: Indicates whether bare metal instance types must be included, excluded, or required.
      • To include bare metal instance types, specify included.
      • To require only bare metal instance types, specify required.
      • To exclude bare metal instance types, specify excluded.
      Default: excluded
    • baseline_ebs_bandwidth_mbps
      Type: STRUCT
      Provider name: BaselineEbsBandwidthMbps
      Description: The minimum and maximum baseline bandwidth to Amazon EBS, in Mbps. For more information, see Amazon EBS–optimized instances in the Amazon EC2 User Guide.
      Default: No minimum or maximum limits
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum baseline bandwidth, in Mbps. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum baseline bandwidth, in Mbps. If this parameter is not specified, there is no minimum limit.
    • baseline_performance_factors
      Type: STRUCT
      Provider name: BaselinePerformanceFactors
      Description: The baseline performance to consider, using an instance family as a baseline reference. The instance family establishes the lowest acceptable level of performance. Amazon EC2 uses this baseline to guide instance type selection, but there is no guarantee that the selected instance types will always exceed the baseline for every application. Currently, this parameter only supports CPU performance as a baseline performance factor. For more information, see Performance protection in the Amazon EC2 User Guide.
      • cpu
        Type: STRUCT
        Provider name: Cpu
        Description: The CPU performance to consider, using an instance family as the baseline reference.
        • references
          Type: UNORDERED_LIST_STRUCT
          Provider name: References
          Description: Specify an instance family to use as the baseline reference for CPU performance. All instance types that match your specified attributes will be compared against the CPU performance of the referenced instance family, regardless of CPU manufacturer or architecture differences. Currently, only one instance family can be specified in the list.
          • instance_family
            Type: STRING
            Provider name: InstanceFamily
            Description: The instance family to use as a baseline reference. Ensure that you specify the correct value for the instance family. The instance family is everything before the period (.) in the instance type name. For example, in the instance type c6i.large, the instance family is c6i, not c6. For more information, see Amazon EC2 instance type naming conventions in Amazon EC2 Instance Types. The following instance families are not supported for performance protection:
            • c1
            • g3 | g3s
            • hpc7g
            • m1 | m2
            • mac1 | mac2 | mac2-m1ultra | mac2-m2 | mac2-m2pro
            • p3dn | p4d | p5
            • t1
            • u-12tb1 | u-18tb1 | u-24tb1 | u-3tb1 | u-6tb1 | u-9tb1 | u7i-12tb | u7in-16tb | u7in-24tb | u7in-32tb
            If you enable performance protection by specifying a supported instance family, the returned instance types will exclude the above unsupported instance families. If you specify an unsupported instance family as a value for baseline performance, the API returns an empty response for and an exception for , , , and .
    • burstable_performance
      Type: STRING
      Provider name: BurstablePerformance
      Description: Indicates whether burstable performance T instance types are included, excluded, or required. For more information, see Burstable performance instances.
      • To include burstable performance instance types, specify included.
      • To require only burstable performance instance types, specify required.
      • To exclude burstable performance instance types, specify excluded.
      Default: excluded
    • cpu_manufacturers
      Type: UNORDERED_LIST_STRING
      Provider name: CpuManufacturers
      Description: The CPU manufacturers to include.
      • For instance types with Intel CPUs, specify intel.
      • For instance types with AMD CPUs, specify amd.
      • For instance types with Amazon Web Services CPUs, specify amazon-web-services.
      • For instance types with Apple CPUs, specify apple.
      Don’t confuse the CPU manufacturer with the CPU architecture. Instances will be launched with a compatible CPU architecture based on the Amazon Machine Image (AMI) that you specify in your launch template.
      Default: Any manufacturer
    • excluded_instance_types
      Type: UNORDERED_LIST_STRING
      Provider name: ExcludedInstanceTypes
      Description: The instance types to exclude. You can use strings with one or more wild cards, represented by an asterisk (), to exclude an instance type, size, or generation. The following are examples: m5.8xlarge, c5., m5a., r*, 3. For example, if you specify c5*,Amazon EC2 will exclude the entire C5 instance family, which includes all C5a and C5n instance types. If you specify m5a.*, Amazon EC2 will exclude all the M5a instance types, but not the M5n instance types. If you specify ExcludedInstanceTypes, you can’t specify AllowedInstanceTypes.
      Default: No excluded instance types
    • instance_generations
      Type: UNORDERED_LIST_STRING
      Provider name: InstanceGenerations
      Description: Indicates whether current or previous generation instance types are included. The current generation instance types are recommended for use. Current generation instance types are typically the latest two to three generations in each instance family. For more information, see Instance types in the Amazon EC2 User Guide. For current generation instance types, specify current. For previous generation instance types, specify previous.
      Default: Current and previous generation instance types
    • local_storage
      Type: STRING
      Provider name: LocalStorage
      Description: Indicates whether instance types with instance store volumes are included, excluded, or required. For more information, Amazon EC2 instance store in the Amazon EC2 User Guide.
      • To include instance types with instance store volumes, specify included.
      • To require only instance types with instance store volumes, specify required.
      • To exclude instance types with instance store volumes, specify excluded.
      Default: included
    • local_storage_types
      Type: UNORDERED_LIST_STRING
      Provider name: LocalStorageTypes
      Description: The type of local storage that is required.
      • For instance types with hard disk drive (HDD) storage, specify hdd.
      • For instance types with solid state drive (SSD) storage, specify ssd.
      Default: hdd and ssd
    • max_spot_price_as_percentage_of_optimal_on_demand_price
      Type: INT32
      Provider name: MaxSpotPriceAsPercentageOfOptimalOnDemandPrice
      Description: [Price protection] The price protection threshold for Spot Instances, as a percentage of an identified On-Demand price. The identified On-Demand price is the price of the lowest priced current generation C, M, or R instance type with your specified attributes. If no current generation C, M, or R instance type matches your attributes, then the identified price is from the lowest priced current generation instance types, and failing that, from the lowest priced previous generation instance types that match your attributes. When Amazon EC2 selects instance types with your attributes, it will exclude instance types whose price exceeds your specified threshold. The parameter accepts an integer, which Amazon EC2 interprets as a percentage. If you set TargetCapacityUnitType to vcpu or memory-mib, the price protection threshold is based on the per vCPU or per memory price instead of the per instance price. Only one of SpotMaxPricePercentageOverLowestPrice or MaxSpotPriceAsPercentageOfOptimalOnDemandPrice can be specified. If you don’t specify either, Amazon EC2 will automatically apply optimal price protection to consistently select from a wide range of instance types. To indicate no price protection threshold for Spot Instances, meaning you want to consider all instance types that match your attributes, include one of these parameters and specify a high value, such as 999999.
    • memory_gib_per_v_cpu
      Type: STRUCT
      Provider name: MemoryGiBPerVCpu
      Description: The minimum and maximum amount of memory per vCPU, in GiB.
      Default: No minimum or maximum limits
      • max
        Type: DOUBLE
        Provider name: Max
        Description: The maximum amount of memory per vCPU, in GiB. If this parameter is not specified, there is no maximum limit.
      • min
        Type: DOUBLE
        Provider name: Min
        Description: The minimum amount of memory per vCPU, in GiB. If this parameter is not specified, there is no minimum limit.
    • memory_mib
      Type: STRUCT
      Provider name: MemoryMiB
      Description: The minimum and maximum amount of memory, in MiB.
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum amount of memory, in MiB. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum amount of memory, in MiB. If this parameter is not specified, there is no minimum limit.
    • network_bandwidth_gbps
      Type: STRUCT
      Provider name: NetworkBandwidthGbps
      Description: The minimum and maximum amount of network bandwidth, in gigabits per second (Gbps).
      Default: No minimum or maximum limits
      • max
        Type: DOUBLE
        Provider name: Max
        Description: The maximum amount of network bandwidth, in Gbps. If this parameter is not specified, there is no maximum limit.
      • min
        Type: DOUBLE
        Provider name: Min
        Description: The minimum amount of network bandwidth, in Gbps. If this parameter is not specified, there is no minimum limit.
    • network_interface_count
      Type: STRUCT
      Provider name: NetworkInterfaceCount
      Description: The minimum and maximum number of network interfaces.
      Default: No minimum or maximum limits
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum number of network interfaces. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum number of network interfaces. If this parameter is not specified, there is no minimum limit.
    • on_demand_max_price_percentage_over_lowest_price
      Type: INT32
      Provider name: OnDemandMaxPricePercentageOverLowestPrice
      Description: [Price protection] The price protection threshold for On-Demand Instances, as a percentage higher than an identified On-Demand price. The identified On-Demand price is the price of the lowest priced current generation C, M, or R instance type with your specified attributes. When Amazon EC2 selects instance types with your attributes, it will exclude instance types whose price exceeds your specified threshold. The parameter accepts an integer, which Amazon EC2 interprets as a percentage. To turn off price protection, specify a high value, such as 999999. This parameter is not supported for GetSpotPlacementScores and GetInstanceTypesFromInstanceRequirements. If you set TargetCapacityUnitType to vcpu or memory-mib, the price protection threshold is applied based on the per-vCPU or per-memory price instead of the per-instance price.
      Default: 20
    • require_hibernate_support
      Type: BOOLEAN
      Provider name: RequireHibernateSupport
      Description: Indicates whether instance types must support hibernation for On-Demand Instances. This parameter is not supported for GetSpotPlacementScores.
      Default: false
    • spot_max_price_percentage_over_lowest_price
      Type: INT32
      Provider name: SpotMaxPricePercentageOverLowestPrice
      Description: [Price protection] The price protection threshold for Spot Instances, as a percentage higher than an identified Spot price. The identified Spot price is the Spot price of the lowest priced current generation C, M, or R instance type with your specified attributes. If no current generation C, M, or R instance type matches your attributes, then the identified Spot price is from the lowest priced current generation instance types, and failing that, from the lowest priced previous generation instance types that match your attributes. When Amazon EC2 selects instance types with your attributes, it will exclude instance types whose Spot price exceeds your specified threshold. The parameter accepts an integer, which Amazon EC2 interprets as a percentage. If you set TargetCapacityUnitType to vcpu or memory-mib, the price protection threshold is applied based on the per-vCPU or per-memory price instead of the per-instance price. This parameter is not supported for GetSpotPlacementScores and GetInstanceTypesFromInstanceRequirements. Only one of SpotMaxPricePercentageOverLowestPrice or MaxSpotPriceAsPercentageOfOptimalOnDemandPrice can be specified. If you don’t specify either, Amazon EC2 will automatically apply optimal price protection to consistently select from a wide range of instance types. To indicate no price protection threshold for Spot Instances, meaning you want to consider all instance types that match your attributes, include one of these parameters and specify a high value, such as 999999.
      Default: 100
    • total_local_storage_gb
      Type: STRUCT
      Provider name: TotalLocalStorageGB
      Description: The minimum and maximum amount of total local storage, in GB.
      Default: No minimum or maximum limits
      • max
        Type: DOUBLE
        Provider name: Max
        Description: The maximum amount of total local storage, in GB. If this parameter is not specified, there is no maximum limit.
      • min
        Type: DOUBLE
        Provider name: Min
        Description: The minimum amount of total local storage, in GB. If this parameter is not specified, there is no minimum limit.
    • v_cpu_count
      Type: STRUCT
      Provider name: VCpuCount
      Description: The minimum and maximum number of vCPUs.
      • max
        Type: INT32
        Provider name: Max
        Description: The maximum number of vCPUs. If this parameter is not specified, there is no maximum limit.
      • min
        Type: INT32
        Provider name: Min
        Description: The minimum number of vCPUs. If the value is 0, there is no minimum limit.
  • instance_type
    Type: STRING
    Provider name: InstanceType
    Description: The instance type.
  • kernel_id
    Type: STRING
    Provider name: KernelId
    Description: The ID of the kernel, if applicable.
  • key_name
    Type: STRING
    Provider name: KeyName
    Description: The name of the key pair.
  • license_specifications
    Type: UNORDERED_LIST_STRUCT
    Provider name: LicenseSpecifications
    Description: The license configurations.
    • license_configuration_arn
      Type: STRING
      Provider name: LicenseConfigurationArn
      Description: The Amazon Resource Name (ARN) of the license configuration.
  • maintenance_options
    Type: STRUCT
    Provider name: MaintenanceOptions
    Description: The maintenance options for your instance.
    • auto_recovery
      Type: STRING
      Provider name: AutoRecovery
      Description: Disables the automatic recovery behavior of your instance or sets it to default.
  • metadata_options
    Type: STRUCT
    Provider name: MetadataOptions
    Description: The metadata options for the instance. For more information, see Instance metadata and user data in the Amazon EC2 User Guide.
    • http_endpoint
      Type: STRING
      Provider name: HttpEndpoint
      Description: Enables or disables the HTTP metadata endpoint on your instances. If the parameter is not specified, the default state is enabled. If you specify a value of disabled, you will not be able to access your instance metadata.
    • http_protocol_ipv6
      Type: STRING
      Provider name: HttpProtocolIpv6
      Description: Enables or disables the IPv6 endpoint for the instance metadata service.
      Default: disabled
    • http_put_response_hop_limit
      Type: INT32
      Provider name: HttpPutResponseHopLimit
      Description: The desired HTTP PUT response hop limit for instance metadata requests. The larger the number, the further instance metadata requests can travel.
      Default: 1

      Possible values: Integers from 1 to 64

    • http_tokens
      Type: STRING
      Provider name: HttpTokens
      Description: Indicates whether IMDSv2 is required.
      • optional - IMDSv2 is optional. You can choose whether to send a session token in your instance metadata retrieval requests. If you retrieve IAM role credentials without a session token, you receive the IMDSv1 role credentials. If you retrieve IAM role credentials using a valid session token, you receive the IMDSv2 role credentials.
      • required - IMDSv2 is required. You must send a session token in your instance metadata retrieval requests. With this option, retrieving the IAM role credentials always returns IMDSv2 credentials; IMDSv1 credentials are not available.
    • instance_metadata_tags
      Type: STRING
      Provider name: InstanceMetadataTags
      Description: Set to enabled to allow access to instance tags from the instance metadata. Set to disabled to turn off access to instance tags from the instance metadata. For more information, see Work with instance tags using the instance metadata.
      Default: disabled
    • state
      Type: STRING
      Provider name: State
      Description: The state of the metadata option changes. pending - The metadata options are being updated and the instance is not ready to process metadata traffic with the new selection. applied - The metadata options have been successfully applied on the instance.
  • monitoring
    Type: STRUCT
    Provider name: Monitoring
    Description: The monitoring for the instance.
    • enabled
      Type: BOOLEAN
      Provider name: Enabled
      Description: Indicates whether detailed monitoring is enabled. Otherwise, basic monitoring is enabled.
  • network_interfaces
    Type: UNORDERED_LIST_STRUCT
    Provider name: NetworkInterfaces
    Description: The network interfaces.
    • associate_carrier_ip_address
      Type: BOOLEAN
      Provider name: AssociateCarrierIpAddress
      Description: Indicates whether to associate a Carrier IP address with eth0 for a new network interface. Use this option when you launch an instance in a Wavelength Zone and want to associate a Carrier IP address with the network interface. For more information about Carrier IP addresses, see Carrier IP addresses in the Wavelength Developer Guide.
    • associate_public_ip_address
      Type: BOOLEAN
      Provider name: AssociatePublicIpAddress
      Description: Indicates whether to associate a public IPv4 address with eth0 for a new network interface. Amazon Web Services charges for all public IPv4 addresses, including public IPv4 addresses associated with running instances and Elastic IP addresses. For more information, see the Public IPv4 Address tab on the Amazon VPC pricing page.
    • connection_tracking_specification
      Type: STRUCT
      Provider name: ConnectionTrackingSpecification
      Description: A security group connection tracking specification that enables you to set the timeout for connection tracking on an Elastic network interface. For more information, see Idle connection tracking timeout in the Amazon EC2 User Guide.
      • tcp_established_timeout
        Type: INT32
        Provider name: TcpEstablishedTimeout
        Description: Timeout (in seconds) for idle TCP connections in an established state. Min: 60 seconds. Max: 432000 seconds (5 days). Default: 432000 seconds. Recommended: Less than 432000 seconds.
      • udp_stream_timeout
        Type: INT32
        Provider name: UdpStreamTimeout
        Description: Timeout (in seconds) for idle UDP flows classified as streams which have seen more than one request-response transaction. Min: 60 seconds. Max: 180 seconds (3 minutes). Default: 180 seconds.
      • udp_timeout
        Type: INT32
        Provider name: UdpTimeout
        Description: Timeout (in seconds) for idle UDP flows that have seen traffic only in a single direction or a single request-response transaction. Min: 30 seconds. Max: 60 seconds. Default: 30 seconds.
    • delete_on_termination
      Type: BOOLEAN
      Provider name: DeleteOnTermination
      Description: Indicates whether the network interface is deleted when the instance is terminated.
    • description
      Type: STRING
      Provider name: Description
      Description: A description for the network interface.
    • device_index
      Type: INT32
      Provider name: DeviceIndex
      Description: The device index for the network interface attachment.
    • ena_srd_specification
      Type: STRUCT
      Provider name: EnaSrdSpecification
      Description: Contains the ENA Express settings for instances launched from your launch template.
      • ena_srd_enabled
        Type: BOOLEAN
        Provider name: EnaSrdEnabled
        Description: Indicates whether ENA Express is enabled for the network interface.
      • ena_srd_udp_specification
        Type: STRUCT
        Provider name: EnaSrdUdpSpecification
        Description: Configures ENA Express for UDP network traffic.
        • ena_srd_udp_enabled
          Type: BOOLEAN
          Provider name: EnaSrdUdpEnabled
          Description: Indicates whether UDP traffic to and from the instance uses ENA Express. To specify this setting, you must first enable ENA Express.
    • groups
      Type: UNORDERED_LIST_STRING
      Provider name: Groups
      Description: The IDs of one or more security groups.
    • interface_type
      Type: STRING
      Provider name: InterfaceType
      Description: The type of network interface.
    • ipv4_prefix_count
      Type: INT32
      Provider name: Ipv4PrefixCount
      Description: The number of IPv4 prefixes that Amazon Web Services automatically assigned to the network interface.
    • ipv4_prefixes
      Type: UNORDERED_LIST_STRUCT
      Provider name: Ipv4Prefixes
      Description: One or more IPv4 prefixes assigned to the network interface.
      • ipv4_prefix
        Type: STRING
        Provider name: Ipv4Prefix
        Description: The IPv4 delegated prefixes assigned to the network interface.
    • ipv6_address_count
      Type: INT32
      Provider name: Ipv6AddressCount
      Description: The number of IPv6 addresses for the network interface.
    • ipv6_addresses
      Type: UNORDERED_LIST_STRUCT
      Provider name: Ipv6Addresses
      Description: The IPv6 addresses for the network interface.
      • ipv6_address
        Type: STRING
        Provider name: Ipv6Address
        Description: The IPv6 address.
      • is_primary_ipv6
        Type: BOOLEAN
        Provider name: IsPrimaryIpv6
        Description: Determines if an IPv6 address associated with a network interface is the primary IPv6 address. When you enable an IPv6 GUA address to be a primary IPv6, the first IPv6 GUA will be made the primary IPv6 address until the instance is terminated or the network interface is detached. For more information, see RunInstances.
    • ipv6_prefix_count
      Type: INT32
      Provider name: Ipv6PrefixCount
      Description: The number of IPv6 prefixes that Amazon Web Services automatically assigned to the network interface.
    • ipv6_prefixes
      Type: UNORDERED_LIST_STRUCT
      Provider name: Ipv6Prefixes
      Description: One or more IPv6 prefixes assigned to the network interface.
      • ipv6_prefix
        Type: STRING
        Provider name: Ipv6Prefix
        Description: The IPv6 delegated prefixes assigned to the network interface.
    • network_card_index
      Type: INT32
      Provider name: NetworkCardIndex
      Description: The index of the network card.
    • network_interface_id
      Type: STRING
      Provider name: NetworkInterfaceId
      Description: The ID of the network interface.
    • primary_ipv6
      Type: BOOLEAN
      Provider name: PrimaryIpv6
      Description: The primary IPv6 address of the network interface. When you enable an IPv6 GUA address to be a primary IPv6, the first IPv6 GUA will be made the primary IPv6 address until the instance is terminated or the network interface is detached. For more information about primary IPv6 addresses, see RunInstances.
    • private_ip_address
      Type: STRING
      Provider name: PrivateIpAddress
      Description: The primary private IPv4 address of the network interface.
    • private_ip_addresses
      Type: UNORDERED_LIST_STRUCT
      Provider name: PrivateIpAddresses
      Description: One or more private IPv4 addresses.
      • primary
        Type: BOOLEAN
        Provider name: Primary
        Description: Indicates whether the private IPv4 address is the primary private IPv4 address. Only one IPv4 address can be designated as primary.
      • private_ip_address
        Type: STRING
        Provider name: PrivateIpAddress
        Description: The private IPv4 address.
    • secondary_private_ip_address_count
      Type: INT32
      Provider name: SecondaryPrivateIpAddressCount
      Description: The number of secondary private IPv4 addresses for the network interface.
    • subnet_id
      Type: STRING
      Provider name: SubnetId
      Description: The ID of the subnet for the network interface.
  • network_performance_options
    Type: STRUCT
    Provider name: NetworkPerformanceOptions
    Description: Contains the launch template settings for network performance options for your instance.
    • bandwidth_weighting
      Type: STRING
      Provider name: BandwidthWeighting
      Description: When you configure network bandwidth weighting, you can boost baseline bandwidth for either networking or EBS by up to 25%. The total available baseline bandwidth for your instance remains the same. The default option uses the standard bandwidth configuration for your instance type.
  • operator
    Type: STRUCT
    Provider name: Operator
    Description: The entity that manages the launch template.
    • managed
      Type: BOOLEAN
      Provider name: Managed
      Description: If true, the resource is managed by an service provider.
    • principal
      Type: STRING
      Provider name: Principal
      Description: If managed is true, then the principal is returned. The principal is the service provider that manages the resource.
  • placement
    Type: STRUCT
    Provider name: Placement
    Description: The placement of the instance.
    • affinity
      Type: STRING
      Provider name: Affinity
      Description: The affinity setting for the instance on the Dedicated Host.
    • availability_zone
      Type: STRING
      Provider name: AvailabilityZone
      Description: The Availability Zone of the instance.
    • group_id
      Type: STRING
      Provider name: GroupId
      Description: The Group ID of the placement group. You must specify the Placement Group Group ID to launch an instance in a shared placement group.
    • group_name
      Type: STRING
      Provider name: GroupName
      Description: The name of the placement group for the instance.
    • host_id
      Type: STRING
      Provider name: HostId
      Description: The ID of the Dedicated Host for the instance.
    • host_resource_group_arn
      Type: STRING
      Provider name: HostResourceGroupArn
      Description: The ARN of the host resource group in which to launch the instances.
    • partition_number
      Type: INT32
      Provider name: PartitionNumber
      Description: The number of the partition the instance should launch in. Valid only if the placement group strategy is set to partition.
    • spread_domain
      Type: STRING
      Provider name: SpreadDomain
      Description: Reserved for future use.
    • tenancy
      Type: STRING
      Provider name: Tenancy
      Description: The tenancy of the instance. An instance with a tenancy of dedicated runs on single-tenant hardware.
  • private_dns_name_options
    Type: STRUCT
    Provider name: PrivateDnsNameOptions
    Description: The options for the instance hostname.
    • enable_resource_name_dns_a_record
      Type: BOOLEAN
      Provider name: EnableResourceNameDnsARecord
      Description: Indicates whether to respond to DNS queries for instance hostnames with DNS A records.
    • enable_resource_name_dns_aaaa_record
      Type: BOOLEAN
      Provider name: EnableResourceNameDnsAAAARecord
      Description: Indicates whether to respond to DNS queries for instance hostnames with DNS AAAA records.
    • hostname_type
      Type: STRING
      Provider name: HostnameType
      Description: The type of hostname to assign to an instance.
  • ram_disk_id
    Type: STRING
    Provider name: RamDiskId
    Description: The ID of the RAM disk, if applicable.
  • security_group_ids
    Type: UNORDERED_LIST_STRING
    Provider name: SecurityGroupIds
    Description: The security group IDs.
  • security_groups
    Type: UNORDERED_LIST_STRING
    Provider name: SecurityGroups
    Description: The security group names.
  • tag_specifications
    Type: UNORDERED_LIST_STRUCT
    Provider name: TagSpecifications
    Description: The tags that are applied to the resources that are created during instance launch.
    • resource_type
      Type: STRING
      Provider name: ResourceType
      Description: The type of resource to tag.
  • user_data
    Type: STRING
    Provider name: UserData
    Description: The user data for the instance.

launch_time

Type: TIMESTAMP
Provider name: LaunchTime
Description: The time that the instance was last launched. To determine the time that instance was first launched, see the attachment time for the primary network interface.

licenses

Type: UNORDERED_LIST_STRUCT
Provider name: Licenses
Description: The license configurations for the instance.

  • license_configuration_arn
    Type: STRING
    Provider name: LicenseConfigurationArn
    Description: The Amazon Resource Name (ARN) of the license configuration.

maintenance_options

Type: STRUCT
Provider name: MaintenanceOptions
Description: Provides information on the recovery and maintenance options of your instance.

  • auto_recovery
    Type: STRING
    Provider name: AutoRecovery
    Description: Provides information on the current automatic recovery behavior of your instance.

metadata_options

Type: STRUCT
Provider name: MetadataOptions
Description: The metadata options for the instance.

  • http_endpoint
    Type: STRING
    Provider name: HttpEndpoint
    Description: Indicates whether the HTTP metadata endpoint on your instances is enabled or disabled. If the value is disabled, you cannot access your instance metadata.
  • http_protocol_ipv6
    Type: STRING
    Provider name: HttpProtocolIpv6
    Description: Indicates whether the IPv6 endpoint for the instance metadata service is enabled or disabled.
    Default: disabled
  • http_put_response_hop_limit
    Type: INT32
    Provider name: HttpPutResponseHopLimit
    Description: The maximum number of hops that the metadata token can travel. Possible values: Integers from 1 to 64
  • http_tokens
    Type: STRING
    Provider name: HttpTokens
    Description: Indicates whether IMDSv2 is required.
    • optional - IMDSv2 is optional, which means that you can use either IMDSv2 or IMDSv1.
    • required - IMDSv2 is required, which means that IMDSv1 is disabled, and you must use IMDSv2.
  • instance_metadata_tags
    Type: STRING
    Provider name: InstanceMetadataTags
    Description: Indicates whether access to instance tags from the instance metadata is enabled or disabled. For more information, see Work with instance tags using the instance metadata.
  • state
    Type: STRING
    Provider name: State
    Description: The state of the metadata option changes. pending - The metadata options are being updated and the instance is not ready to process metadata traffic with the new selection. applied - The metadata options have been successfully applied on the instance.

monitoring

Type: STRUCT
Provider name: Monitoring
Description: The monitoring for the instance.

  • state
    Type: STRING
    Provider name: State
    Description: Indicates whether detailed monitoring is enabled. Otherwise, basic monitoring is enabled.

network_interfaces

Type: UNORDERED_LIST_STRUCT
Provider name: NetworkInterfaces
Description: The network interfaces for the instance.

  • association
    Type: STRUCT
    Provider name: Association
    Description: The association information for an Elastic IPv4 associated with the network interface.
    • carrier_ip
      Type: STRING
      Provider name: CarrierIp
      Description: The carrier IP address associated with the network interface.
    • customer_owned_ip
      Type: STRING
      Provider name: CustomerOwnedIp
      Description: The customer-owned IP address associated with the network interface.
    • ip_owner_id
      Type: STRING
      Provider name: IpOwnerId
      Description: The ID of the owner of the Elastic IP address.
    • public_dns_name
      Type: STRING
      Provider name: PublicDnsName
      Description: The public DNS name.
    • public_ip
      Type: STRING
      Provider name: PublicIp
      Description: The public IP address or Elastic IP address bound to the network interface.
  • attachment
    Type: STRUCT
    Provider name: Attachment
    Description: The network interface attachment.
    • attach_time
      Type: TIMESTAMP
      Provider name: AttachTime
      Description: The time stamp when the attachment initiated.
    • attachment_id
      Type: STRING
      Provider name: AttachmentId
      Description: The ID of the network interface attachment.
    • delete_on_termination
      Type: BOOLEAN
      Provider name: DeleteOnTermination
      Description: Indicates whether the network interface is deleted when the instance is terminated.
    • device_index
      Type: INT32
      Provider name: DeviceIndex
      Description: The index of the device on the instance for the network interface attachment.
    • ena_srd_specification
      Type: STRUCT
      Provider name: EnaSrdSpecification
      Description: Contains the ENA Express settings for the network interface that’s attached to the instance.
      • ena_srd_enabled
        Type: BOOLEAN
        Provider name: EnaSrdEnabled
        Description: Indicates whether ENA Express is enabled for the network interface.
      • ena_srd_udp_specification
        Type: STRUCT
        Provider name: EnaSrdUdpSpecification
        Description: Configures ENA Express for UDP network traffic.
        • ena_srd_udp_enabled
          Type: BOOLEAN
          Provider name: EnaSrdUdpEnabled
          Description: Indicates whether UDP traffic to and from the instance uses ENA Express. To specify this setting, you must first enable ENA Express.
    • network_card_index
      Type: INT32
      Provider name: NetworkCardIndex
      Description: The index of the network card.
    • status
      Type: STRING
      Provider name: Status
      Description: The attachment state.
  • connection_tracking_configuration
    Type: STRUCT
    Provider name: ConnectionTrackingConfiguration
    Description: A security group connection tracking configuration that enables you to set the timeout for connection tracking on an Elastic network interface. For more information, see Connection tracking timeouts in the Amazon EC2 User Guide.
    • tcp_established_timeout
      Type: INT32
      Provider name: TcpEstablishedTimeout
      Description: Timeout (in seconds) for idle TCP connections in an established state. Min: 60 seconds. Max: 432000 seconds (5 days). Default: 432000 seconds. Recommended: Less than 432000 seconds.
    • udp_stream_timeout
      Type: INT32
      Provider name: UdpStreamTimeout
      Description: Timeout (in seconds) for idle UDP flows classified as streams which have seen more than one request-response transaction. Min: 60 seconds. Max: 180 seconds (3 minutes). Default: 180 seconds.
    • udp_timeout
      Type: INT32
      Provider name: UdpTimeout
      Description: Timeout (in seconds) for idle UDP flows that have seen traffic only in a single direction or a single request-response transaction. Min: 30 seconds. Max: 60 seconds. Default: 30 seconds.
  • description
    Type: STRING
    Provider name: Description
    Description: The description.
  • groups
    Type: UNORDERED_LIST_STRUCT
    Provider name: Groups
    Description: The security groups.
    • group_id
      Type: STRING
      Provider name: GroupId
      Description: The ID of the security group.
    • group_name
      Type: STRING
      Provider name: GroupName
      Description: The name of the security group.
  • interface_type
    Type: STRING
    Provider name: InterfaceType
    Description: The type of network interface. Valid values: interface | efa | efa-only | trunk
  • ipv4_prefixes
    Type: UNORDERED_LIST_STRUCT
    Provider name: Ipv4Prefixes
    Description: The IPv4 delegated prefixes that are assigned to the network interface.
    • ipv4_prefix
      Type: STRING
      Provider name: Ipv4Prefix
      Description: One or more IPv4 prefixes assigned to the network interface.
  • ipv6_addresses
    Type: UNORDERED_LIST_STRUCT
    Provider name: Ipv6Addresses
    Description: The IPv6 addresses associated with the network interface.
    • ipv6_address
      Type: STRING
      Provider name: Ipv6Address
      Description: The IPv6 address.
    • is_primary_ipv6
      Type: BOOLEAN
      Provider name: IsPrimaryIpv6
      Description: Determines if an IPv6 address associated with a network interface is the primary IPv6 address. When you enable an IPv6 GUA address to be a primary IPv6, the first IPv6 GUA will be made the primary IPv6 address until the instance is terminated or the network interface is detached. For more information, see RunInstances.
  • ipv6_prefixes
    Type: UNORDERED_LIST_STRUCT
    Provider name: Ipv6Prefixes
    Description: The IPv6 delegated prefixes that are assigned to the network interface.
    • ipv6_prefix
      Type: STRING
      Provider name: Ipv6Prefix
      Description: One or more IPv6 prefixes assigned to the network interface.
  • mac_address
    Type: STRING
    Provider name: MacAddress
    Description: The MAC address.
  • network_interface_id
    Type: STRING
    Provider name: NetworkInterfaceId
    Description: The ID of the network interface.
  • operator
    Type: STRUCT
    Provider name: Operator
    Description: The service provider that manages the network interface.
    • managed
      Type: BOOLEAN
      Provider name: Managed
      Description: If true, the resource is managed by an service provider.
    • principal
      Type: STRING
      Provider name: Principal
      Description: If managed is true, then the principal is returned. The principal is the service provider that manages the resource.
  • owner_id
    Type: STRING
    Provider name: OwnerId
    Description: The ID of the Amazon Web Services account that created the network interface.
  • private_dns_name
    Type: STRING
    Provider name: PrivateDnsName
    Description: The private DNS name.
  • private_ip_address
    Type: STRING
    Provider name: PrivateIpAddress
    Description: The IPv4 address of the network interface within the subnet.
  • private_ip_addresses
    Type: UNORDERED_LIST_STRUCT
    Provider name: PrivateIpAddresses
    Description: The private IPv4 addresses associated with the network interface.
    • association
      Type: STRUCT
      Provider name: Association
      Description: The association information for an Elastic IP address for the network interface.
      • carrier_ip
        Type: STRING
        Provider name: CarrierIp
        Description: The carrier IP address associated with the network interface.
      • customer_owned_ip
        Type: STRING
        Provider name: CustomerOwnedIp
        Description: The customer-owned IP address associated with the network interface.
      • ip_owner_id
        Type: STRING
        Provider name: IpOwnerId
        Description: The ID of the owner of the Elastic IP address.
      • public_dns_name
        Type: STRING
        Provider name: PublicDnsName
        Description: The public DNS name.
      • public_ip
        Type: STRING
        Provider name: PublicIp
        Description: The public IP address or Elastic IP address bound to the network interface.
    • primary
      Type: BOOLEAN
      Provider name: Primary
      Description: Indicates whether this IPv4 address is the primary private IP address of the network interface.
    • private_dns_name
      Type: STRING
      Provider name: PrivateDnsName
      Description: The private IPv4 DNS name.
    • private_ip_address
      Type: STRING
      Provider name: PrivateIpAddress
      Description: The private IPv4 address of the network interface.
  • source_dest_check
    Type: BOOLEAN
    Provider name: SourceDestCheck
    Description: Indicates whether source/destination checking is enabled.
  • status
    Type: STRING
    Provider name: Status
    Description: The status of the network interface.
  • subnet_id
    Type: STRING
    Provider name: SubnetId
    Description: The ID of the subnet.
  • vpc_id
    Type: STRING
    Provider name: VpcId
    Description: The ID of the VPC.

network_performance_options

Type: STRUCT
Provider name: NetworkPerformanceOptions
Description: Contains settings for the network performance options for your instance.

  • bandwidth_weighting
    Type: STRING
    Provider name: BandwidthWeighting
    Description: When you configure network bandwidth weighting, you can boost your baseline bandwidth for either networking or EBS by up to 25%. The total available baseline bandwidth for your instance remains the same. The default option uses the standard bandwidth configuration for your instance type.

operator

Type: STRUCT
Provider name: Operator
Description: The service provider that manages the instance.

  • managed
    Type: BOOLEAN
    Provider name: Managed
    Description: If true, the resource is managed by an service provider.
  • principal
    Type: STRING
    Provider name: Principal
    Description: If managed is true, then the principal is returned. The principal is the service provider that manages the resource.

outpost_arn

Type: STRING
Provider name: OutpostArn
Description: The Amazon Resource Name (ARN) of the Outpost.

placement

Type: STRUCT
Provider name: Placement
Description: The location where the instance launched, if applicable.

  • affinity
    Type: STRING
    Provider name: Affinity
    Description: The affinity setting for the instance on the Dedicated Host. This parameter is not supported for CreateFleet or ImportInstance.
  • availability_zone
    Type: STRING
    Provider name: AvailabilityZone
    Description: The Availability Zone of the instance. If not specified, an Availability Zone will be automatically chosen for you based on the load balancing criteria for the Region. This parameter is not supported for CreateFleet.
  • group_id
    Type: STRING
    Provider name: GroupId
    Description: The ID of the placement group that the instance is in. If you specify GroupId, you can’t specify GroupName.
  • group_name
    Type: STRING
    Provider name: GroupName
    Description: The name of the placement group that the instance is in. If you specify GroupName, you can’t specify GroupId.
  • host_id
    Type: STRING
    Provider name: HostId
    Description: The ID of the Dedicated Host on which the instance resides. This parameter is not supported for CreateFleet or ImportInstance.
  • host_resource_group_arn
    Type: STRING
    Provider name: HostResourceGroupArn
    Description: The ARN of the host resource group in which to launch the instances. If you specify this parameter, either omit the Tenancy parameter or set it to host. This parameter is not supported for CreateFleet.
  • partition_number
    Type: INT32
    Provider name: PartitionNumber
    Description: The number of the partition that the instance is in. Valid only if the placement group strategy is set to partition. This parameter is not supported for CreateFleet.
  • spread_domain
    Type: STRING
    Provider name: SpreadDomain
    Description: Reserved for future use.
  • tenancy
    Type: STRING
    Provider name: Tenancy
    Description: The tenancy of the instance. An instance with a tenancy of dedicated runs on single-tenant hardware. This parameter is not supported for CreateFleet. The host tenancy is not supported for ImportInstance or for T3 instances that are configured for the unlimited CPU credit option.

platform

Type: STRING
Provider name: Platform
Description: The platform. This value is windows for Windows instances; otherwise, it is empty.

platform_details

Type: STRING
Provider name: PlatformDetails
Description: The platform details value for the instance. For more information, see AMI billing information fields in the Amazon EC2 User Guide.

private_dns_name

Type: STRING
Provider name: PrivateDnsName
Description: [IPv4 only] The private DNS hostname name assigned to the instance. This DNS hostname can only be used inside the Amazon EC2 network. This name is not available until the instance enters the running state. The Amazon-provided DNS server resolves Amazon-provided private DNS hostnames if you’ve enabled DNS resolution and DNS hostnames in your VPC. If you are not using the Amazon-provided DNS server in your VPC, your custom domain name servers must resolve the hostname as appropriate.

private_dns_name_options

Type: STRUCT
Provider name: PrivateDnsNameOptions
Description: The options for the instance hostname.

  • enable_resource_name_dns_a_record
    Type: BOOLEAN
    Provider name: EnableResourceNameDnsARecord
    Description: Indicates whether to respond to DNS queries for instance hostnames with DNS A records.
  • enable_resource_name_dns_aaaa_record
    Type: BOOLEAN
    Provider name: EnableResourceNameDnsAAAARecord
    Description: Indicates whether to respond to DNS queries for instance hostnames with DNS AAAA records.
  • hostname_type
    Type: STRING
    Provider name: HostnameType
    Description: The type of hostname to assign to an instance.

private_ip_address

Type: STRING
Provider name: PrivateIpAddress
Description: The private IPv4 address assigned to the instance.

product_codes

Type: UNORDERED_LIST_STRUCT
Provider name: ProductCodes
Description: The product codes attached to this instance, if applicable.

  • product_code_id
    Type: STRING
    Provider name: ProductCodeId
    Description: The product code.
  • product_code_type
    Type: STRING
    Provider name: ProductCodeType
    Description: The type of product code.

public_dns_name

Type: STRING
Provider name: PublicDnsName
Description: [IPv4 only] The public DNS name assigned to the instance. This name is not available until the instance enters the running state. This name is only available if you’ve enabled DNS hostnames for your VPC.

public_ip_address

Type: STRING
Provider name: PublicIpAddress
Description: The public IPv4 address, or the Carrier IP address assigned to the instance, if applicable. A Carrier IP address only applies to an instance launched in a subnet associated with a Wavelength Zone.

ramdisk_id

Type: STRING
Provider name: RamdiskId
Description: The RAM disk associated with this instance, if applicable.

root_device_name

Type: STRING
Provider name: RootDeviceName
Description: The device name of the root device volume (for example, /dev/sda1).

root_device_type

Type: STRING
Provider name: RootDeviceType
Description: The root device type used by the AMI. The AMI can use an EBS volume or an instance store volume.

security_groups

Type: UNORDERED_LIST_STRUCT
Provider name: SecurityGroups
Description: The security groups for the instance.

  • group_id
    Type: STRING
    Provider name: GroupId
    Description: The ID of the security group.
  • group_name
    Type: STRING
    Provider name: GroupName
    Description: The name of the security group.

source_dest_check

Type: BOOLEAN
Provider name: SourceDestCheck
Description: Indicates whether source/destination checking is enabled.

spot_instance_request_id

Type: STRING
Provider name: SpotInstanceRequestId
Description: If the request is a Spot Instance request, the ID of the request.

sriov_net_support

Type: STRING
Provider name: SriovNetSupport
Description: Specifies whether enhanced networking with the Intel 82599 Virtual Function interface is enabled.

state

Type: STRUCT
Provider name: State
Description: The current state of the instance.

  • code
    Type: INT32
    Provider name: Code
    Description: The state of the instance as a 16-bit unsigned integer. The high byte is all of the bits between 2^8 and (2^16)-1, which equals decimal values between 256 and 65,535. These numerical values are used for internal purposes and should be ignored. The low byte is all of the bits between 2^0 and (2^8)-1, which equals decimal values between 0 and 255. The valid values for instance-state-code will all be in the range of the low byte and they are:
    • 0 : pending
    • 16 : running
    • 32 : shutting-down
    • 48 : terminated
    • 64 : stopping
    • 80 : stopped
    You can ignore the high byte value by zeroing out all of the bits above 2^8 or 256 in decimal.
  • name
    Type: STRING
    Provider name: Name
    Description: The current state of the instance.

state_reason

Type: STRUCT
Provider name: StateReason
Description: The reason for the most recent state transition.

  • code
    Type: STRING
    Provider name: Code
    Description: The reason code for the state change.
  • message
    Type: STRING
    Provider name: Message
    Description: The message for the state change.
    • Server.InsufficientInstanceCapacity: There was insufficient capacity available to satisfy the launch request.
    • Server.InternalError: An internal error caused the instance to terminate during launch.
    • Server.ScheduledStop: The instance was stopped due to a scheduled retirement.
    • Server.SpotInstanceShutdown: The instance was stopped because the number of Spot requests with a maximum price equal to or higher than the Spot price exceeded available capacity or because of an increase in the Spot price.
    • Server.SpotInstanceTermination: The instance was terminated because the number of Spot requests with a maximum price equal to or higher than the Spot price exceeded available capacity or because of an increase in the Spot price.
    • Client.InstanceInitiatedShutdown: The instance was shut down from the operating system of the instance.
    • Client.InstanceTerminated: The instance was terminated or rebooted during AMI creation.
    • Client.InternalError: A client error caused the instance to terminate during launch.
    • Client.InvalidSnapshot.NotFound: The specified snapshot was not found.
    • Client.UserInitiatedHibernate: Hibernation was initiated on the instance.
    • Client.UserInitiatedShutdown: The instance was shut down using the Amazon EC2 API.
    • Client.VolumeLimitExceeded: The limit on the number of EBS volumes or total storage was exceeded. Decrease usage or request an increase in your account limits.

state_transition_reason

Type: STRING
Provider name: StateTransitionReason
Description: The reason for the most recent state transition. This might be an empty string.

subnet_id

Type: STRING
Provider name: SubnetId
Description: The ID of the subnet in which the instance is running.

tags

Type: UNORDERED_LIST_STRING

tpm_support

Type: STRING
Provider name: TpmSupport
Description: If the instance is configured for NitroTPM support, the value is v2.0. For more information, see NitroTPM in the Amazon EC2 User Guide.

usage_operation

Type: STRING
Provider name: UsageOperation
Description: The usage operation value for the instance. For more information, see AMI billing information fields in the Amazon EC2 User Guide.

usage_operation_update_time

Type: TIMESTAMP
Provider name: UsageOperationUpdateTime
Description: The time that the usage operation was last updated.

virtualization_type

Type: STRING
Provider name: VirtualizationType
Description: The virtualization type of the instance.

vpc_id

Type: STRING
Provider name: VpcId
Description: The ID of the VPC in which the instance is running.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers