このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

azure_load_balancer_probe

etag

Type: STRING
Provider name: etag
Description: A unique read-only string that changes whenever the resource is updated.

id

Type: STRING
Provider name: id
Description: Resource ID.

interval_in_seconds

Type: INT32
Provider name: properties.intervalInSeconds
Description: The interval, in seconds, for how frequently to probe the endpoint for health status. Typically, the interval is slightly less than half the allocated timeout period (in seconds) which allows two full probes before taking the instance out of rotation. The default value is 15, the minimum value is 5.

load_balancing_rules

Type: UNORDERED_LIST_STRUCT
Provider name: properties.loadBalancingRules
Description: The load balancer rules that use this probe.

  • id
    Type: STRING
    Provider name: id
    Description: Resource ID.

name

Type: STRING
Provider name: name
Description: The name of the resource that is unique within the set of probes used by the load balancer. This name can be used to access the resource.

number_of_probes

Type: INT32
Provider name: properties.numberOfProbes
Description: The number of probes where if no response, will result in stopping further traffic from being delivered to the endpoint. This values allows endpoints to be taken out of rotation faster or slower than the typical times used in Azure.

port

Type: INT32
Provider name: properties.port
Description: The port for communicating the probe. Possible values range from 1 to 65535, inclusive.

protocol

Type: STRING
Provider name: properties.protocol
Description: The protocol of the end point. If ‘Tcp’ is specified, a received ACK is required for the probe to be successful. If ‘Http’ or ‘Https’ is specified, a 200 OK response from the specifies URI is required for the probe to be successful.

provisioning_state

Type: STRING
Provider name: properties.provisioningState
Description: The provisioning state of the probe resource.

request_path

Type: STRING
Provider name: properties.requestPath
Description: The URI used for requesting health status from the VM. Path is required if a protocol is set to http. Otherwise, it is not allowed. There is no default value.

resource_group

Type: STRING

subscription_id

Type: STRING

subscription_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: Type of the resource.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers