このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

gcp_artifactregistry_docker_image

ancestors

Type: UNORDERED_LIST_STRING

build_time

Type: TIMESTAMP
Provider name: buildTime
Description: The time this image was built. This field is returned as the ‘metadata.buildTime’ field in the Version resource. The build time is returned to the client as an RFC 3339 string, which can be easily used with the JavaScript Date constructor.

image_size_bytes

Type: INT64
Provider name: imageSizeBytes
Description: Calculated size of the image. This field is returned as the ‘metadata.imageSizeBytes’ field in the Version resource.

labels

Type: UNORDERED_LIST_STRING

media_type

Type: STRING
Provider name: mediaType
Description: Media type of this image, e.g. “application/vnd.docker.distribution.manifest.v2+json”. This field is returned as the ‘metadata.mediaType’ field in the Version resource.

name

Type: STRING
Provider name: name
Description: Required. registry_location, project_id, repository_name and image id forms a unique image name:projects//locations//repository//dockerImages/. For example, “projects/test-project/locations/us-west4/repositories/test-repo/dockerImages/ nginx@sha256:e9954c1fc875017be1c3e36eca16be2d9e9bccc4bf072163515467d6a823c7cf”, where “us-west4” is the registry_location, “test-project” is the project_id, “test-repo” is the repository_name and “nginx@sha256:e9954c1fc875017be1c3e36eca16be2d9e9bccc4bf072163515467d6a823c7cf” is the image’s digest.

organization_id

Type: STRING

parent

Type: STRING

project_id

Type: STRING

project_number

Type: STRING

resource_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

update_time

Type: TIMESTAMP
Provider name: updateTime
Description: Output only. The time when the docker image was last updated.

upload_time

Type: TIMESTAMP
Provider name: uploadTime
Description: Time the image was uploaded.

uri

Type: STRING
Provider name: uri
Description: Required. URL to access the image. Example: us-west4-docker.pkg.dev/test-project/test-repo/nginx@sha256:e9954c1fc875017be1c3e36eca16be2d9e9bccc4bf072163515467d6a823c7cf

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers