このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

gcp_compute_address

address

Type: STRING
Provider name: address
Description: The static IP address represented by this resource.

address_type

Type: STRING
Provider name: addressType
Description: The type of address to reserve, either INTERNAL or EXTERNAL. If unspecified, defaults to EXTERNAL.
Possible values:

  • EXTERNAL - A publicly visible external IP address.
  • INTERNAL - A private network IP address, for use with an Instance or Internal Load Balancer forwarding rule.
  • UNSPECIFIED_TYPE

ancestors

Type: UNORDERED_LIST_STRING

creation_timestamp

Type: TIMESTAMP
Provider name: creationTimestamp
Description: [Output Only] Creation timestamp in RFC3339 text format.

description

Type: STRING
Provider name: description
Description: An optional description of this resource. Provide this field when you create the resource.

gcp_status

Type: STRING
Provider name: status
Description: [Output Only] The status of the address, which can be one of RESERVING, RESERVED, or IN_USE. An address that is RESERVING is currently in the process of being reserved. A RESERVED address is currently reserved and available to use. An IN_USE address is currently being used by another resource and is not available.
Possible values:

  • IN_USE - Address is being used by another resource and is not available.
  • RESERVED - Address is reserved and available to use.
  • RESERVING - Address is being reserved.

id

Type: STRING
Provider name: id
Description: [Output Only] The unique identifier for the resource. This identifier is defined by the server.

ip_version

Type: STRING
Provider name: ipVersion
Description: The IP version that will be used by this address. Valid options are IPV4 or IPV6.
Possible values:

  • IPV4
  • IPV6
  • UNSPECIFIED_VERSION

ipv6_endpoint_type

Type: STRING
Provider name: ipv6EndpointType
Description: The endpoint type of this address, which should be VM or NETLB. This is used for deciding which type of endpoint this address can be used after the external IPv6 address reservation.
Possible values:

  • NETLB - Reserved IPv6 address can be used on network load balancer.
  • VM - Reserved IPv6 address can be used on VM.

kind

Type: STRING
Provider name: kind
Description: [Output Only] Type of the resource. Always compute#address for addresses.

labels

Type: UNORDERED_LIST_STRING

name

Type: STRING
Provider name: name
Description: Name of the resource. Provided by the client when the resource is created. The name must be 1-63 characters long, and comply with RFC1035. Specifically, the name must be 1-63 characters long and match the regular expression [a-z]([-a-z0-9]*[a-z0-9])?. The first character must be a lowercase letter, and all following characters (except for the last character) must be a dash, lowercase letter, or digit. The last character must be a lowercase letter or digit.

network

Type: STRING
Provider name: network
Description: The URL of the network in which to reserve the address. This field can only be used with INTERNAL type with the VPC_PEERING purpose.

network_tier

Type: STRING
Provider name: networkTier
Description: This signifies the networking tier used for configuring this address and can only take the following values: PREMIUM or STANDARD. Internal IP addresses are always Premium Tier; global external IP addresses are always Premium Tier; regional external IP addresses can be either Standard or Premium Tier. If this field is not specified, it is assumed to be PREMIUM.
Possible values:

  • FIXED_STANDARD - Public internet quality with fixed bandwidth.
  • PREMIUM - High quality, Google-grade network tier, support for all networking products.
  • STANDARD - Public internet quality, only limited support for other networking products.
  • STANDARD_OVERRIDES_FIXED_STANDARD - (Output only) Temporary tier for FIXED_STANDARD when fixed standard tier is expired or not configured.

organization_id

Type: STRING

parent

Type: STRING

prefix_length

Type: INT32
Provider name: prefixLength
Description: The prefix length if the resource represents an IP range.

project_id

Type: STRING

project_number

Type: STRING

purpose

Type: STRING
Provider name: purpose
Description: The purpose of this resource, which can be one of the following values: - GCE_ENDPOINT for addresses that are used by VM instances, alias IP ranges, load balancers, and similar resources. - DNS_RESOLVER for a DNS resolver address in a subnetwork for a Cloud DNS inbound forwarder IP addresses (regional internal IP address in a subnet of a VPC network) - VPC_PEERING for global internal IP addresses used for private services access allocated ranges. - NAT_AUTO for the regional external IP addresses used by Cloud NAT when allocating addresses using automatic NAT IP address allocation. - IPSEC_INTERCONNECT for addresses created from a private IP range that are reserved for a VLAN attachment in an HA VPN over Cloud Interconnect configuration. These addresses are regional resources. - SHARED_LOADBALANCER_VIP for an internal IP address that is assigned to multiple internal forwarding rules. - PRIVATE_SERVICE_CONNECT for a private network address that is used to configure Private Service Connect. Only global internal addresses can use this purpose.
Possible values:

  • DNS_RESOLVER - DNS resolver address in the subnetwork.
  • GCE_ENDPOINT - VM internal/alias IP, Internal LB service IP, etc.
  • IPSEC_INTERCONNECT - A regional internal IP address range reserved for the VLAN attachment that is used in HA VPN over Cloud Interconnect. This regional internal IP address range must not overlap with any IP address range of subnet/route in the VPC network and its peering networks. After the VLAN attachment is created with the reserved IP address range, when creating a new VPN gateway, its interface IP address is allocated from the associated VLAN attachment’s IP address range.
  • NAT_AUTO - External IP automatically reserved for Cloud NAT.
  • PRIVATE_SERVICE_CONNECT - A private network IP address that can be used to configure Private Service Connect. This purpose can be specified only for GLOBAL addresses of Type INTERNAL
  • SERVERLESS - A regional internal IP address range reserved for Serverless.
  • SHARED_LOADBALANCER_VIP - A private network IP address that can be shared by multiple Internal Load Balancer forwarding rules.
  • VPC_PEERING - IP range for peer networks.

region

Type: STRING
Provider name: region
Description: [Output Only] The URL of the region where a regional address resides. For regional addresses, you must specify the region as a path parameter in the HTTP request URL. This field is not applicable to global addresses.

resource_name

Type: STRING

Type: STRING
Provider name: selfLink
Description: [Output Only] Server-defined URL for the resource.

subnetwork

Type: STRING
Provider name: subnetwork
Description: The URL of the subnetwork in which to reserve the address. If an IP address is specified, it must be within the subnetwork’s IP range. This field can only be used with INTERNAL type with a GCE_ENDPOINT or DNS_RESOLVER purpose.

tags

Type: UNORDERED_LIST_STRING

users

Type: UNORDERED_LIST_STRING
Provider name: users
Description: [Output Only] The URLs of the resources that are using this address.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers