このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Overview

AWS Parallel Computing Service (AWS PCS) is a managed service that makes it easier for you to run and scale your high-performance computing (HPC) workloads and build scientific and engineering models on AWS.

Enable this integration to see all your PCS metrics in Datadog.

Setup

Installation

If you haven’t already, set up the Amazon Web Services integration first.

Configuration

  1. In the AWS integration page, ensure that AWS PCS is enabled under the Metric Collection tab.
  2. Install the Datadog - AWS PCS integration.

Data Collected

Metrics

aws.pcs.actual_capacity
(count)
Count of running instances (idlecapacity + utilizedcapacity).
Shown as instance
aws.pcs.capacity_utilization
(gauge)
Percentage of instances that are being utilized (utilizedcapacity / actualcapacity).
Shown as percent
aws.pcs.desired_capacity
(count)
Count of desired instances.
Shown as instance
aws.pcs.idle_capacity
(count)
Count of instances that are running but not allocated to jobs.
Shown as instance
aws.pcs.utilized_capacity
(count)
Count of instances that are running and allocated to jobs.
Shown as instance

Service Checks

AWS PCS does not include any service checks.

Events

AWS PCS does not include any events.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers