Supported OS Linux Windows Mac OS

概要

このチェックは、Datadog Agent を通じて Datadog Operator を監視します。

セットアップ

インストール

Datadog Operator のドキュメントを参照してください。

収集データ

メトリクス

datadog.operator.admission_controller.feature.enabled
(gauge)
1 if the Admission Controller feature is enabled
datadog.operator.agent.deployment.success
(gauge)
1 if the desired number of Agent replicas equals the number of available Agent pods. 0 otherwise.
datadog.operator.cluster_checks.feature.enabled
(gauge)
1 if the Cluster checks feature is enabled
datadog.operator.clusteragent.deployment.success
(gauge)
1 if the desired number of Cluster Agent replicas equals the number of available Cluster Agent pods. 0 otherwise.
datadog.operator.clusterchecksrunner.deployment.success
(gauge)
1 if the desired number of Cluster Check Runner replicas equals the number of available Cluster Check Runner pods. 0 otherwise.
datadog.operator.controller_runtime_active_workers
(gauge)
Number of currently used workers per controller
Shown as worker
datadog.operator.controller_runtime_max_concurrent_reconciles
(gauge)
Maximum number of concurrent reconciles per controller
Shown as operation
datadog.operator.controller_runtime_reconcile_errors_total
(count)
Total number of reconciliation errors per controller
Shown as error
datadog.operator.controller_runtime_reconcile_time_seconds.count
(count)
Count of time per reconciliation per controller
Shown as second
datadog.operator.controller_runtime_reconcile_time_seconds.sum
(count)
Sum of time per reconciliation per controller
Shown as second
datadog.operator.controller_runtime_reconcile_total
(count)
Total number of reconciliations per controller
Shown as operation
datadog.operator.default.feature.enabled
(gauge)
datadog.operator.dogstatsd.feature.enabled
(gauge)
1 if the DogStatsD feature is enabled
datadog.operator.eds_controller_leader
(gauge)
datadog.operator.event_collection.feature.enabled
(gauge)
1 if the Event Collection feature is enabled
datadog.operator.go_gc_duration_seconds.count
(count)
Count of the GC invocation durations
Shown as second
datadog.operator.go_gc_duration_seconds.quantile
(gauge)
Quantiles of the GC invocation durations
Shown as second
datadog.operator.go_gc_duration_seconds.sum
(count)
Sum of the GC invocation durations
Shown as second
datadog.operator.go_goroutines
(gauge)
Number of goroutines that currently exist
Shown as thread
datadog.operator.go_info
(gauge)
Go version
datadog.operator.go_memstats_alloc_bytes
(gauge)
Number of bytes allocated and still in use
Shown as byte
datadog.operator.go_memstats_alloc_bytes_total
(count)
Total number of bytes allocated even if freed
Shown as byte
datadog.operator.go_memstats_buck_hash_sys_bytes
(gauge)
Number of bytes used by the profiling bucket hash table
Shown as byte
datadog.operator.go_memstats_frees_total
(count)
Total number of frees
datadog.operator.go_memstats_gc_cpu_fraction
(gauge)
The fraction of this program's available CPU time used by the GC since the program started
Shown as fraction
datadog.operator.go_memstats_gc_sys_bytes
(gauge)
Number of bytes used for garbage collection system metadata
Shown as byte
datadog.operator.go_memstats_heap_alloc_bytes
(gauge)
Number of heap bytes allocated and still in use
Shown as byte
datadog.operator.go_memstats_heap_idle_bytes
(gauge)
Number of heap bytes waiting to be used
Shown as byte
datadog.operator.go_memstats_heap_inuse_bytes
(gauge)
Number of heap bytes that are in use
Shown as byte
datadog.operator.go_memstats_heap_objects
(gauge)
Number of allocated objects
Shown as object
datadog.operator.go_memstats_heap_released_bytes
(gauge)
Number of heap bytes released to OS
Shown as byte
datadog.operator.go_memstats_heap_sys_bytes
(gauge)
Number of heap bytes obtained from system
Shown as byte
datadog.operator.go_memstats_last_gc_time_seconds
(gauge)
Number of seconds since 1970 of last garbage collection
datadog.operator.go_memstats_lookups_total
(count)
Total number of pointer lookups
datadog.operator.go_memstats_mallocs_total
(count)
TTotal number of mallocs
datadog.operator.go_memstats_mcache_inuse_bytes
(gauge)
Number of bytes in use by mcache structures
Shown as byte
datadog.operator.go_memstats_mcache_sys_bytes
(gauge)
Number of bytes used for mcache structures obtained from system
Shown as byte
datadog.operator.go_memstats_mspan_inuse_bytes
(gauge)
Number of bytes in use by mspan structures
Shown as byte
datadog.operator.go_memstats_mspan_sys_bytes
(gauge)
Number of bytes used for mspan structures obtained from system
datadog.operator.go_memstats_next_gc_bytes
(gauge)
Number of heap bytes when next garbage collection will take place
Shown as byte
datadog.operator.go_memstats_other_sys_bytes
(gauge)
Number of bytes used for other system allocations
Shown as byte
datadog.operator.go_memstats_stack_inuse_bytes
(gauge)
Number of bytes in use by the stack allocator
Shown as byte
datadog.operator.go_memstats_stack_sys_bytes
(gauge)
Number of bytes obtained from system for stack allocator
Shown as byte
datadog.operator.go_memstats_sys_bytes
(gauge)
Number of bytes obtained from system
Shown as byte
datadog.operator.go_threads
(gauge)
Number of OS threads created
Shown as thread
datadog.operator.ksm.feature.enabled
(gauge)
1 if the Kubernetes State Metrics Core feature is enabled
datadog.operator.live_container.feature.enabled
(gauge)
1 if the Live Containers feature is enabled
datadog.operator.log_collection.feature.enabled
(gauge)
1 if the Log Collection feature is enabled
datadog.operator.orchestrator_explorer.feature.enabled
(gauge)
1 if the Kubernetes Orchestrator Explorer feature is enabled
datadog.operator.process_cpu_seconds_total
(count)
Total user and system CPU time spent in seconds
Shown as second
datadog.operator.process_max_fds
(gauge)
Maximum number of open file descriptors
Shown as file
datadog.operator.process_open_fds
(gauge)
Number of open file descriptors
Shown as file
datadog.operator.process_resident_memory_bytes
(gauge)
Resident memory size in bytes
Shown as byte
datadog.operator.process_start_time_seconds
(gauge)
Start time of the process since unix epoch in seconds
datadog.operator.process_virtual_memory_bytes
(gauge)
Virtual memory size in bytes
Shown as byte
datadog.operator.process_virtual_memory_max_bytes
(gauge)
Maximum amount of virtual memory available in bytes
Shown as byte
datadog.operator.reconcile.success
(gauge)
1 if the last recorded reconcile error is null, 0 otherwise. The reconcile_err tag describes the last recorded error.
datadog.operator.remote_config.feature.enabled
(gauge)
1 if the Remote Configuration feature is enabled
datadog.operator.rest_client_requests_total
(count)
Number of HTTP requests, partitioned by status code, method, and host
Shown as request
datadog.operator.workqueue_adds_total
(count)
Total number of adds handled by workqueue
datadog.operator.workqueue_depth
(gauge)
Current depth of workqueue
datadog.operator.workqueue_longest_running_processor_seconds
(gauge)
How many seconds has the longest running processor for workqueue been running.
Shown as second
datadog.operator.workqueue_queue_duration_seconds.count
(count)
Count of how long in seconds an item stays in workqueue before being requested
Shown as second
datadog.operator.workqueue_queue_duration_seconds.sum
(count)
Sum of how long in seconds an item stays in workqueue before being requested
Shown as second
datadog.operator.workqueue_retries_total
(count)
Total number of retries handled by workqueue
datadog.operator.workqueue_unfinished_work_seconds
(gauge)
How many seconds of work has been done that is in progress and hasn't been observed by work_duration. Large values indicate stuck threads. One can deduce the number of stuck threads by observing the rate at which this increases.
Shown as second
datadog.operator.workqueue_work_duration_seconds.count
(count)
Count of how long in seconds processing an item from workqueue takes
Shown as second
datadog.operator.workqueue_work_duration_seconds.sum
(count)
Sum of how long in seconds processing an item from workqueue takes
Shown as second

イベント

Datadog Operator インテグレーションには、イベントは含まれません。

サービスチェック

トラブルシューティング

ご不明な点は、Datadog のサポートチームまでお問合せください。

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers