Supported OS Linux Windows Mac OS

インテグレーションバージョン1.0.0
このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Overview

Delinea Privilege Manager is an endpoint least privilege and application control solution for Windows and macOS, capable of supporting enterprises and fast-growing organizations at scale. Local Security and Application Control are the two major components of Delinea Privilege Manager.

This integration supports the following types of logs:

  • Application Action Events : Application Action Events contain generic information about the application that ran, the policy that was triggered, the date and time stamp, the computer, and the user.
  • Application Justification Events : Application Justification Events are generated when an application requiring a justification workflow is run by a user.
  • Bad Rated Application Action Events : Bad Rated Application Action Events are generated when an application with a poor security rating is being installed or is executed.
  • Password Disclosure Events : Password Disclosure Events contain any type of password disclosure activity.
  • Newly Discovered File Events : Newly Discovered File Events contain information about newly discovered files on the system.
  • Change History Events : Change History Events contain information about any changes made in Delinea Privilege Manager.

View detailed insights into these logs using the out-of-the-box dashboards. The integration also includes ready-to-use Cloud SIEM detection rules for enhanced monitoring and security.

Setup

Installation

To install the Delinea Privilege Manager integration, run the following Agent installation command followed by the steps below. For more information, see the Integration Management documentation.

Note: This step is not required for Agent version >= 7.63.0.

Linux command

sudo -u dd-agent -- datadog-agent integration install datadog-delinea-privilege-manager==1.0.0

Configuration

Log collection

  1. By default, log collection is disabled in the Datadog Agent. To enable it, modify the datadog.yaml file::

      logs_enabled: true
    
  2. Add the following configuration block to your delinea_privilege_manager.d/conf.yaml file to start collecting your logs.

    See the sample delinea_privilege_manager.d/conf.yaml for available configuration options. The appropriate protocol (either TCP or UDP) should be chosen based on the Delinea Privilege Manager syslog forwarding configuration.

    • TCP: If TCP protocol is used for syslog forwarding, set the type to tcp.
    • UDP: If UDP protocol is used for syslog forwarding, set the type to udp.
      logs:
      - type: <tcp/udp>
        port: <PORT>
        source: delinea-privilege-manager
        service: delinea-privilege-manager
    

    Notes:

    • PORT: The port should be the same as the one provided in the Configure syslog message forwarding from Delinea Privilege Manager section.
    • It is recommended to keep the service and source values unchanged, as these parameters are integral to the pipeline’s operation.
  3. Restart the Agent.

Configure syslog message forwarding from Delinea Privilege Manager

  • Creating Syslog server configuration
    1. Navigate to Admin > Configuration and select the Foreign Systems tab.

    2. Click on Syslog to open the syslog configurations page, then click on the Create button.

    3. Provide a configuration name and the syslog server address (either TCP or UDP)

      • For TCP, the configuration should be formatted like this: tcp://[host]:port
      • For UDP, the configuration should be formatted like this: udp://[host]:port

      host: IP address where your datadog-agent is running.

      port: Port number to send syslog messages.

    4. Click on the Create button. Confirm the details added and return to the Admin Menu.

  • Setting Up Syslog Server Tasks:
    1. After adding a new Syslog connection, navigate to Admin > Tasks to send logs to your Syslog Server.

    2. Expand the Server Tasks > Foreign Systems folders, select SysLog, then click Create.

    3. From the Template drop-down, select the Send Application Action Events to Syslog template.

    4. Add a Name for this task (set to Application Action Events) and Event Name (set to Application Action Events), and specify the Event Severity (0-Lowest, 10-Highest), or keep it as is.

    5. From the SysLog System drop-down, select your SysLog server foreign system (configured above).

    6. Provide a value for Security Ratings Provider if required, or leave it as is.

    7. Click Create.

      Note: Do not alter the Data source, and ensure the Replace spaces toggle is disabled, as any changes to these parameters will directly impact the functionality of the Delinea Privilege Manager integration.

    8. Once created, scroll down to the Schedule section and click on the New Schedule button. Provide the following details:

      1. Schedule Details:
        • Provide Schedule Name.
      2. Schedule:
        1. For Schedule Type, select Shared Schedule from the drop down.
        2. For Shared Schedule, select Quarter-Hour from the drop down.
    9. Click on the Save Changes button available on the upper-right corner of the page.

This process configures the Syslog forwarding task for Application Action Events. For other types of events mentioned in the table below, create new tasks for each event with respective template and event name, and follow all the above steps.

Note: In step 4, make sure to set the Name for the task and the Event Name according to the selected template, as specified in the table below. The Event Name is essential to the functionality of the Delinea Privilege Manager Pipeline and must be provided exactly as specified.

TemplateEvent NameName
Send Application Action Events to SyslogApplication Action EventsApplication Action Events
Send Application Justification Events to SyslogApplication Justification EventsApplication Justification Events
Send Change History Events to SyslogNot ApplicableChange History Events
Send Newly Discovered File Events to SyslogNewly Discovered File EventsNewly Discovered File Events
Send Password Disclosure Events to SyslogPassword Disclosure EventsPassword Disclosure Events
Send Bad Rated Application Action Events to SyslogBad Rated Application Action EventsBad Rated Application Action Events

Validation

Run the Agent’s status command and look for Delinea Privilege Manager under the Checks section.

Data Collected

Log

FormatEvent Types
CEFApplication Action Events, Bad Rated Application Action Events, Application Justification Events, Password Disclosure Events, Newly Discovered File Events, Change History Events

Metrics

The Delinea Privilege Manager integration does not include any metrics.

Events

The Delinea Privilege Manager integration does not include any events.

Service Checks

The Delinea Privilege Manager integration does not include any service checks.

Troubleshooting

Permission denied while port binding:

If you see a Permission denied error while port binding in the Agent logs:

  1. Binding to a port number under 1024 requires elevated permissions. Grant access to the port using the setcap command:

    sudo setcap CAP_NET_BIND_SERVICE=+ep /opt/datadog-agent/bin/agent/agent
    
  2. Verify the setup is correct by running the getcap command:

    sudo getcap /opt/datadog-agent/bin/agent/agent
    

    With the expected output:

    /opt/datadog-agent/bin/agent/agent = cap_net_bind_service+ep
    

    Note: You must run the setcap command every time you upgrade the Agent.

  3. Restart the Agent.

Data is not being collected:

Ensure traffic is bypassed from the configured port if the firewall is enabled.

Port already in use:

If you see the Port <PORT_NUMBER> Already in Use error, see the following instructions. The following example is for port 514:

  • On systems using Syslog, if the Agent listens for events on port 514, the following error can appear in the Agent logs: Can't start UDP forwarder on port 514: listen udp :514: bind: address already in use. This error occurs because, by default, Syslog listens on port 514. To resolve this error, take one of the following steps:
    • Disable Syslog.
    • Configure the Agent to listen on a different, available port.

For further assistance, contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers