このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Overview

Google Cloud Anthos is a development platform for infrastructure and applications across on-premises, edge, and in multiple public clouds with a Google Cloud-backed control plane.

Use the Datadog Google Cloud Platform integration to collect metrics from Google Cloud Anthos.

Setup

Metric collection

Installation

If you haven’t already, set up the Google Cloud Platform integration first. There are no other installation steps.

Log collection

Google Cloud Anthos logs can be collected with Google Cloud Logging and sent to a Dataflow job through a Cloud Pub/Sub topic. If you haven’t already, set up logging with the Datadog Dataflow template.

Data Collected

Metrics

gcp.anthos.apiserver_admission_controller_admission_duration_seconds
(count)
Admission controller latency histogram in seconds, identified by name and broken out for each operation and API resource and type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_controller_admission_latencies_milliseconds
(count)
(Deprecated) Admission controller latency histogram in milliseconds, identified by name and broken out for each operation and API resource and type (validate or admit). Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.apiserver_admission_controller_admission_latencies_seconds
(count)
Admission controller latency histogram, identified by name and broken out for each operation and API resource and type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_gke_webhook_manifest_error
(gauge)
Indicates if there were errors encountered while loading manifest based webhooks. Sampled every 60 seconds.
gcp.anthos.apiserver_admission_gke_webhook_metadata
(gauge)
Metadata for admission webhooks. Sampled every 60 seconds.
gcp.anthos.apiserver_admission_step_admission_duration_seconds
(count)
Admission sub-step latency histogram in seconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_duration_seconds_summary
(gauge)
Admission sub-step latency summary in seconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_duration_seconds_summary_count
(count)
Admission sub-step latency summary in seconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_duration_seconds_summary_sum
(count)
Admission sub-step latency summary in seconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_latencies_milliseconds
(count)
(Deprecated) Admission sub-step latency histogram in milliseconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.apiserver_admission_step_admission_latencies_milliseconds_summary
(gauge)
(Deprecated) Admission sub-step latency summary in milliseconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.apiserver_admission_step_admission_latencies_milliseconds_summary_count
(count)
(Deprecated) Admission sub-step latency summary in milliseconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.apiserver_admission_step_admission_latencies_milliseconds_summary_sum
(count)
(Deprecated) Admission sub-step latency summary in milliseconds, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.apiserver_admission_step_admission_latencies_seconds
(count)
Admission sub-step latency histogram, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_latencies_seconds_summary
(gauge)
Admission sub-step latency summary, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_latencies_seconds_summary_count
(count)
Admission sub-step latency summary, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_step_admission_latencies_seconds_summary_sum
(count)
Admission sub-step latency summary, broken out for each operation and API resource and step type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_webhook_admission_duration_seconds
(count)
Admission webhook latency histogram in seconds, identified by name and broken out for each operation and API resource and type (validate or admit). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_admission_webhook_rejection_count
(count)
Admission webhook rejection count, identified by name and broken out for each admission type and operation. Additional labels specify an error type (callingwebhookerror or apiserverinternalerror if an error occurred; no_error otherwise) and optionally a non-zero rejection code if the webhook rejects the request with an HTTP status code. Codes greater than 600 are truncated to 600.
gcp.anthos.apiserver_aggregated_request_total
(count)
Delta count of apiserver requests broken out for each verb, scope, and HTTP response code. Sampled every 60 seconds. After sampling, data is not visible for up to 180 seconds.
gcp.anthos.apiserver_audit_error_total
(count)
Counter of audit events that failed to be audited properly. Plugin identifies the plugin affected by the error. Sampled every 60 seconds.
Shown as error
gcp.anthos.apiserver_audit_event_total
(count)
Counter of audit events generated and sent to the audit backend. Sampled every 60 seconds.
Shown as event
gcp.anthos.apiserver_audit_level_total
(count)
Counter of policy levels for audit events (1 per request). Sampled every 60 seconds.
gcp.anthos.apiserver_audit_requests_rejected_total
(count)
Counter of apiserver requests rejected due to an error in audit logging backend. Sampled every 60 seconds.
gcp.anthos.apiserver_crd_webhook_conversion_duration_seconds
(count)
CRD webhook conversion duration in seconds. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_current_inflight_requests
(gauge)
Maximal number of currently used inflight request limit of this apiserver per request kind in last second. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_current_inqueue_requests
(gauge)
Maximal number of queued requests in this apiserver per request kind in last second. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_egress_dialer_dial_duration_seconds
(count)
Dial latency histogram in seconds, labeled by the protocol (http-connect or grpc), transport (tcp or uds). Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_egress_dialer_dial_failure_count
(count)
Dial failure count, labeled by the protocol (http-connect or grpc), transport (tcp or uds), and stage (connect or proxy). The stage indicates at which stage the dial failed. Sampled every 60 seconds.
gcp.anthos.apiserver_envelope_encryption_dek_cache_fill_percent
(gauge)
Percent of the cache slots currently occupied by cached DEKs. Sampled every 60 seconds.
gcp.anthos.apiserver_flowcontrol_current_executing_requests
(gauge)
Number of requests currently executing in the API Priority and Fairness system. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_current_inqueue_requests
(gauge)
Number of requests currently pending in queues of the API Priority and Fairness system. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_dispatched_requests_total
(count)
Number of requests released by API Priority and Fairness system for service. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_priority_level_request_count_samples
(count)
Periodic observations of the number of requests. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_priority_level_request_count_watermarks
(count)
Watermarks of the number of requests. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_read_vs_write_request_count_samples
(count)
Periodic observations of the number of requests. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_read_vs_write_request_count_watermarks
(count)
Watermarks of the number of requests. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_flowcontrol_request_concurrency_limit
(gauge)
Shared concurrency limit in the API Priority and Fairness system. Sampled every 60 seconds.
gcp.anthos.apiserver_flowcontrol_request_execution_seconds
(count)
Duration of request execution in the API Priority and Fairness system. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_flowcontrol_request_queue_length_after_enqueue
(count)
Length of queue in the API Priority and Fairness system, as seen by each request after it is enqueued. Sampled every 60 seconds.
gcp.anthos.apiserver_flowcontrol_request_wait_duration_seconds
(count)
Length of time a request spent waiting in its queue. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_init_events_total
(count)
Counter of init events processed in watchcache broken by resource type. Sampled every 60 seconds.
gcp.anthos.apiserver_kube_aggregator_x509_missing_san_total
(count)
Counts the number of requests to servers missing SAN extension in their serving certificate OR the number of connection failures due to the lack of x509 certificate SAN extension missing (either/or, based on the runtime environment). Sampled every 60 seconds.
gcp.anthos.apiserver_longrunning_gauge
(gauge)
Gauge of all active long-running apiserver requests broken out by verb, group, version, resource, scope and component. Not all requests are tracked this way. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_registered_watchers
(gauge)
Number of currently registered watchers for a given resources. Sampled every 60 seconds.
gcp.anthos.apiserver_request_aborts_total
(count)
Number of requests which apiserver aborted possibly due to a timeout, for each group, version, verb, resource, subresource and scope. Sampled every 60 seconds.
gcp.anthos.apiserver_request_count
(count)
(Deprecated) Counter of apiserver requests broken out for each verb, group, version, resource, scope, component, client, and HTTP response contentType and code. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_request_duration_seconds
(count)
[STABLE] Response latency distribution in seconds for each verb, dry run value, group, version, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_request_filter_duration_seconds
(count)
Request filter latency distribution in seconds, for each filter type. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_request_latencies
(count)
(Deprecated) Response latency distribution in microseconds for each verb, group, version, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.apiserver_request_latencies_summary
(gauge)
(Deprecated) Response latency summary in microseconds for each verb, group, version, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.apiserver_request_latencies_summary_count
(count)
(Deprecated) Response latency summary in microseconds for each verb, group, version, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.apiserver_request_latencies_summary_sum
(count)
(Deprecated) Response latency summary in microseconds for each verb, group, version, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.apiserver_request_terminations_total
(count)
Number of requests which apiserver terminated in self-defense. Sampled every 60 seconds.
gcp.anthos.apiserver_request_total
(count)
[STABLE] Counter of apiserver requests broken out for each verb, dry run value, group, version, resource, scope, component, and HTTP response code. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_requested_deprecated_apis
(gauge)
Gauge of deprecated APIs that have been requested, broken out by API group, version, resource, subresource, and removed_release. Sampled every 60 seconds.
gcp.anthos.apiserver_response_sizes
(count)
Response size distribution in bytes for each group, version, verb, resource, subresource, scope and component. Sampled every 60 seconds.
Shown as byte
gcp.anthos.apiserver_selfrequest_total
(count)
Counter of apiserver self-requests broken out for each verb, API resource and subresource. Sampled every 60 seconds.
Shown as request
gcp.anthos.apiserver_storage_data_key_generation_duration_seconds
(count)
Latencies in seconds of data encryption key(DEK) generation operations. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_storage_data_key_generation_failures_total
(count)
Total number of failed data encryption key(DEK) generation operations. Sampled every 60 seconds.
Shown as operation
gcp.anthos.apiserver_storage_data_key_generation_latencies_microseconds
(count)
(Deprecated) Latencies in microseconds of data encryption key(DEK) generation operations. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.apiserver_storage_envelope_transformation_cache_misses_total
(count)
Total number of cache misses while accessing key decryption key(KEK). Sampled every 60 seconds.
gcp.anthos.apiserver_storage_objects
(gauge)
[STABLE] Number of stored objects at the time of last check split by kind. Sampled every 60 seconds.
Shown as object
gcp.anthos.apiserver_storage_transformation_duration_seconds
(count)
Latencies in seconds of value transformation operations. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_storage_transformation_operations_total
(count)
Total number of transformations. Sampled every 60 seconds.
Shown as second
gcp.anthos.apiserver_terminated_watchers_total
(count)
Counter of watchers closed due to unresponsiveness broken by resource type. Sampled every 60 seconds.
gcp.anthos.apiserver_tls_handshake_errors_total
(count)
Number of requests dropped with 'TLS handshake error from' error. Sampled every 60 seconds.
Shown as error
gcp.anthos.apiserver_watch_events_sizes
(count)
Watch event size distribution in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.apiserver_watch_events_total
(count)
Number of events sent in watch clients. Sampled every 60 seconds.
gcp.anthos.apiserver_webhooks_x509_missing_san_total
(count)
Counts the number of requests to servers missing SAN extension in their serving certificate OR the number of connection failures due to the lack of x509 certificate SAN extension missing (either/or, based on the runtime environment). Sampled every 60 seconds.
Shown as request
gcp.anthos.container.cpu.limit_cores
(gauge)
CPU cores limit of the container. Sampled every 60 seconds.
Shown as core
gcp.anthos.container.cpu.request_cores
(gauge)
Number of CPU cores requested by the container. Sampled every 60 seconds.
Shown as core
gcp.anthos.container.ephemeral_storage.limit_bytes
(gauge)
Local ephemeral storage limit in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.container.ephemeral_storage.request_bytes
(gauge)
Local ephemeral storage request in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.container.ephemeral_storage.used_bytes
(gauge)
Local ephemeral storage usage in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.container.memory.limit_bytes
(gauge)
Memory limit of the container in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.container.memory.request_bytes
(gauge)
Memory request of the container in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.container.memory.used_bytes
(gauge)
Memory usage in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.coredns_cache_hits_total
(count)
The count of cache hits. Sampled every 60 seconds.
Shown as hit
gcp.anthos.coredns_cache_misses_total
(count)
The count of cache misses. Sampled every 60 seconds.
Shown as miss
gcp.anthos.coredns_dns_do_requests_total
(count)
Counter of DNS requests with DO bit set per zone. Sampled every 60 seconds.
Shown as request
gcp.anthos.coredns_dns_request_duration_seconds
(count)
Histogram of the time (in seconds) each request took. Sampled every 60 seconds.
Shown as second
gcp.anthos.coredns_dns_request_size_bytes
(count)
Size of the EDNS0 UDP buffer in bytes (64K for TCP). Sampled every 60 seconds.
Shown as byte
gcp.anthos.coredns_dns_requests_total
(count)
Counter of DNS requests made per zone, protocol and family. Sampled every 60 seconds.
Shown as request
gcp.anthos.coredns_dns_response_size_bytes
(count)
Size of the returned response in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.coredns_dns_responses_total
(count)
Counter of response status codes. Sampled every 60 seconds.
Shown as response
gcp.anthos.go_goroutines
(gauge)
Number of goroutines that currently exist. Sampled every 60 seconds.
gcp.anthos.go_threads
(gauge)
Number of OS threads created. Sampled every 60 seconds.
Shown as thread
gcp.anthos.kube_apiserver_pod_logs_pods_logs_backend_tls_failure_total
(count)
Total number of requests for pods/logs that failed due to kubelet server TLS verification. Sampled every 60 seconds.
gcp.anthos.kube_apiserver_pod_logs_pods_logs_insecure_backend_total
(count)
Total number of requests for pods/logs sliced by usage type: enforcetls, skiptlsallowed, skiptls_denied. Sampled every 60 seconds.
Shown as request
gcp.anthos.kube_auto_repair_reason_total
(count)
Counter of repairs trigger per condition. Sampled every 60 seconds.
gcp.anthos.kube_auto_repair_trigger_latencies_seconds
(count)
Histogram of latencies for repair trigger on machines breaching threshold failure counts. Sampled every 60 seconds.
gcp.anthos.kube_certificatesigningrequest_cert_length
(gauge)
Length of the issued cert. Sampled every 60 seconds.
gcp.anthos.kube_certificatesigningrequest_condition
(gauge)
The number of each certificatesigningrequest condition. Sampled every 60 seconds.
gcp.anthos.kube_certificatesigningrequest_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_certificatesigningrequest_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_configmap_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_configmap_info
(gauge)
Information about configmap. Sampled every 60 seconds.
gcp.anthos.kube_configmap_metadata_resource_version
(gauge)
Resource version representing a specific version of the configmap. Sampled every 60 seconds.
gcp.anthos.kube_daemonset_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_daemonset_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_daemonset_metadata_generation
(gauge)
Sequence number representing a specific generation of the desired state. Sampled every 60 seconds.
gcp.anthos.kube_daemonset_status_current_number_scheduled
(gauge)
The number of nodes running at least one daemon pod and are supposed to. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_status_desired_number_scheduled
(gauge)
The number of nodes that should be running the daemon pod. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_status_number_available
(gauge)
The number of nodes that should be running the daemon pod and have one or more of the daemon pod running and available. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_status_number_misscheduled
(gauge)
The number of nodes running a daemon pod but are not supposed to. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_status_number_ready
(gauge)
The number of nodes that should be running the daemon pod and have one or more of the daemon pod running and ready. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_status_number_unavailable
(gauge)
The number of nodes that should be running the daemon pod and have none of the daemon pod running and available. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_daemonset_updated_number_scheduled
(gauge)
The total number of nodes that are running updated daemon pod. Sampled every 60 seconds.
Shown as node
gcp.anthos.kube_deployment_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_deployment_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_deployment_metadata_generation
(gauge)
Sequence number representing a specific generation of the desired state. Sampled every 60 seconds.
gcp.anthos.kube_deployment_spec_paused
(gauge)
Whether the deployment is paused and will not be processed by the deployment controller. Sampled every 60 seconds.
gcp.anthos.kube_deployment_spec_replicas
(gauge)
Number of desired pods for a deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_spec_strategy_rollingupdate_max_surge
(gauge)
Maximum number of replicas that can be scheduled above the desired number of replicas during a rolling update of a deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_spec_strategy_rollingupdate_max_unavailable
(gauge)
Maximum number of unavailable replicas during a rolling update of a deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_condition
(gauge)
The current status conditions of a deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_observed_generation
(gauge)
The generation observed by the deployment controller. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_replicas
(gauge)
The number of replicas per deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_replicas_available
(gauge)
The number of available replicas per deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_replicas_unavailable
(gauge)
The number of unavailable replicas per deployment. Sampled every 60 seconds.
gcp.anthos.kube_deployment_status_replicas_updated
(gauge)
The number of updated replicas per deployment. Sampled every 60 seconds.
gcp.anthos.kube_endpoint_address_available
(gauge)
Number of addresses available in endpoint. Sampled every 60 seconds.
gcp.anthos.kube_endpoint_address_not_ready
(gauge)
Number of addresses not ready in endpoint. Sampled every 60 seconds.
gcp.anthos.kube_endpoint_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_endpoint_info
(gauge)
Information about endpoint. Sampled every 60 seconds.
gcp.anthos.kube_endpoint_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_hpa_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_hpa_metadata_generation
(gauge)
The generation observed by the HorizontalPodAutoscaler controller. Sampled every 60 seconds.
gcp.anthos.kube_hpa_spec_max_replicas
(gauge)
Upper limit for the number of pods that can be set by the autoscaler; cannot be smaller than MinReplicas. Sampled every 60 seconds.
gcp.anthos.kube_hpa_spec_min_replicas
(gauge)
Lower limit for the number of pods that can be set by the autoscaler, default 1. Sampled every 60 seconds.
gcp.anthos.kube_hpa_spec_target_metric
(gauge)
The metric specifications used by this autoscaler when calculating the desired replica count. Sampled every 60 seconds.
gcp.anthos.kube_hpa_status_condition
(gauge)
The condition of this autoscaler. Sampled every 60 seconds.
gcp.anthos.kube_hpa_status_current_replicas
(gauge)
Current number of replicas of pods managed by this autoscaler. Sampled every 60 seconds.
gcp.anthos.kube_hpa_status_desired_replicas
(gauge)
Desired number of replicas of pods managed by this autoscaler. Sampled every 60 seconds.
gcp.anthos.kube_job_complete
(gauge)
The job has completed its execution. Sampled every 60 seconds.
gcp.anthos.kube_job_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_job_info
(gauge)
Information about job. Sampled every 60 seconds.
gcp.anthos.kube_job_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_job_owner
(gauge)
Information about the Job's owner. Sampled every 60 seconds.
gcp.anthos.kube_job_spec_completions
(gauge)
The desired number of successfully finished pods the job should be run with. Sampled every 60 seconds.
gcp.anthos.kube_job_spec_parallelism
(gauge)
The maximum desired number of pods the job should run at any given time. Sampled every 60 seconds.
gcp.anthos.kube_job_status_active
(gauge)
The number of actively running pods. Sampled every 60 seconds.
gcp.anthos.kube_job_status_completion_time
(gauge)
CompletionTime represents time when the job was completed. Sampled every 60 seconds.
gcp.anthos.kube_job_status_failed
(gauge)
The number of pods which reached Phase Failed. Sampled every 60 seconds.
gcp.anthos.kube_job_status_start_time
(gauge)
StartTime represents time when the job was acknowledged by the Job Manager. Sampled every 60 seconds.
gcp.anthos.kube_job_status_succeeded
(gauge)
The number of pods which reached Phase Succeeded. Sampled every 60 seconds.
gcp.anthos.kube_limitrange
(gauge)
Information about limit range. Sampled every 60 seconds.
gcp.anthos.kube_limitrange_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_machine_annotations
(gauge)
Machine annotations information. Sampled every 60 seconds.
gcp.anthos.kube_machine_spec_provider_info
(gauge)
Machine ProviderSpec information. Sampled every 60 seconds.
gcp.anthos.kube_machine_status_noderef
(gauge)
Node information in the Machine. Sampled every 60 seconds.
gcp.anthos.kube_machinedeployment_spec_replicas
(gauge)
Number of replicas in MachineDeployment Spec. Sampled every 60 seconds.
gcp.anthos.kube_machinedeployment_spec_template_annotations
(gauge)
MachineDeployment Spec Template annotations information. Sampled every 60 seconds.
gcp.anthos.kube_mutatingwebhookconfiguration_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_mutatingwebhookconfiguration_info
(gauge)
Information about the MutatingWebhookConfiguration. Sampled every 60 seconds.
gcp.anthos.kube_mutatingwebhookconfiguration_metadata_resource_version
(gauge)
Resource version representing a specific version of the MutatingWebhookConfiguration. Sampled every 60 seconds.
gcp.anthos.kube_namespace_annotations
(gauge)
Kubernetes annotations converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_namespace_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_namespace_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_namespace_status_phase
(gauge)
kubernetes namespace status phase. Sampled every 60 seconds.
gcp.anthos.kube_networkpolicy_created
(gauge)
Unix creation timestamp of network policy. Sampled every 60 seconds.
gcp.anthos.kube_networkpolicy_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_networkpolicy_spec_egress_rules
(gauge)
Number of egress rules on the networkpolicy. Sampled every 60 seconds.
gcp.anthos.kube_networkpolicy_spec_ingress_rules
(gauge)
Number of ingress rules on the networkpolicy. Sampled every 60 seconds.
gcp.anthos.kube_node_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_node_info
(gauge)
Information about a cluster node. Sampled every 60 seconds.
gcp.anthos.kube_node_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_node_role
(gauge)
The role of a cluster node. Sampled every 60 seconds.
gcp.anthos.kube_node_spec_taint
(gauge)
The taint of a cluster node. Sampled every 60 seconds.
gcp.anthos.kube_node_spec_unschedulable
(gauge)
Whether a node can schedule new pods. Sampled every 60 seconds.
gcp.anthos.kube_node_status_allocatable
(gauge)
The allocatable for different resources of a node that are available for scheduling. Sampled every 60 seconds.
gcp.anthos.kube_node_status_allocatable_cpu_cores
(gauge)
The CPU resources of a node that are available for scheduling. Sampled every 60 seconds.
Shown as core
gcp.anthos.kube_node_status_allocatable_memory_bytes
(gauge)
The memory resources of a node that are available for scheduling. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_node_status_allocatable_pods
(gauge)
The pod resources of a node that are available for scheduling. Sampled every 60 seconds.
gcp.anthos.kube_node_status_capacity
(gauge)
The capacity for different resources of a node. Sampled every 60 seconds.
gcp.anthos.kube_node_status_capacity_cpu_cores
(gauge)
The total CPU resources of the node. Sampled every 60 seconds.
Shown as core
gcp.anthos.kube_node_status_capacity_memory_bytes
(gauge)
The total memory resources of the node. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_node_status_capacity_pods
(gauge)
The total pod resources of the node. Sampled every 60 seconds.
gcp.anthos.kube_node_status_condition
(gauge)
The condition of a cluster node. Sampled every 60 seconds.
gcp.anthos.kube_onpremadmincluster_spec_info
(gauge)
OnPremAdminCluster Spec information. Sampled every 60 seconds.
gcp.anthos.kube_onpremusercluster_spec_info
(gauge)
OnPremUserCluster Spec information. Sampled every 60 seconds.
gcp.anthos.kube_onpremusercluster_status_condition_lasttransitiontime
(gauge)
Unix timestamp when onpremusercluster transitioned into the condition. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolume_capacity_bytes
(gauge)
Persistentvolume capacity in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_persistentvolume_info
(gauge)
Information about persistentvolume. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolume_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolume_status_phase
(gauge)
The phase indicates if a volume is available, bound to a claim, or released by a claim. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolumeclaim_access_mode
(gauge)
The access mode(s) specified by the persistent volume claim. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolumeclaim_info
(gauge)
Information about persistent volume claim. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolumeclaim_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_persistentvolumeclaim_resource_requests_storage_bytes
(gauge)
The capacity of storage requested by the persistent volume claim. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_persistentvolumeclaim_status_phase
(gauge)
The phase the persistent volume claim is currently in. Sampled every 60 seconds.
gcp.anthos.kube_pod_completion_time
(gauge)
Completion time in unix timestamp for a pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_info
(gauge)
Information about a container in a pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_resource_limits
(gauge)
The number of requested limit resource by a container. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_resource_limits_cpu_cores
(gauge)
The limit on cpu cores to be used by a container. Sampled every 60 seconds.
Shown as core
gcp.anthos.kube_pod_container_resource_limits_memory_bytes
(gauge)
The limit on memory to be used by a container in bytes. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_pod_container_resource_requests
(gauge)
The number of requested request resource by a container. Sampled every 60 seconds.
Shown as request
gcp.anthos.kube_pod_container_resource_requests_cpu_cores
(gauge)
The number of requested cpu cores by a container. Sampled every 60 seconds.
Shown as core
gcp.anthos.kube_pod_container_resource_requests_memory_bytes
(gauge)
The number of requested memory bytes by a container. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kube_pod_container_status_last_terminated_reason
(gauge)
Describes the last reason the container was in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_ready
(gauge)
Describes whether the containers readiness check succeeded. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_restarts_total
(count)
The number of container restarts per container. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_running
(gauge)
Describes whether the container is currently in running state. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_terminated
(gauge)
Describes whether the container is currently in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_terminated_reason
(gauge)
Describes the reason the container is currently in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_waiting
(gauge)
Describes whether the container is currently in waiting state. Sampled every 60 seconds.
gcp.anthos.kube_pod_container_status_waiting_reason
(gauge)
Describes the reason the container is currently in waiting state. Sampled every 60 seconds.
gcp.anthos.kube_pod_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_pod_info
(gauge)
Information about pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_info
(gauge)
Information about an init container in a pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_last_terminated_reason
(gauge)
Describes the last reason the init container was in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_ready
(gauge)
Describes whether the init containers readiness check succeeded. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_restarts_total
(count)
The number of restarts for the init container. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_running
(gauge)
Describes whether the init container is currently in running state. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_terminated
(gauge)
Describes whether the init container is currently in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_terminated_reason
(gauge)
Describes the reason the init container is currently in terminated state. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_waiting
(gauge)
Describes whether the init container is currently in waiting state. Sampled every 60 seconds.
gcp.anthos.kube_pod_init_container_status_waiting_reason
(gauge)
Describes the reason the init container is currently in waiting state. Sampled every 60 seconds.
gcp.anthos.kube_pod_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_pod_owner
(gauge)
Information about the Pod's owner. Sampled every 60 seconds.
gcp.anthos.kube_pod_restart_policy
(gauge)
Describes the restart policy in use by this pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_spec_volumes_persistentvolumeclaims_info
(gauge)
Information about persistentvolumeclaim volumes in a pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_spec_volumes_persistentvolumeclaims_readonly
(gauge)
Describes whether a persistentvolumeclaim is mounted read only. Sampled every 60 seconds.
gcp.anthos.kube_pod_start_time
(gauge)
Start time in unix timestamp for a pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_status_phase
(gauge)
The pods current phase. Sampled every 60 seconds.
gcp.anthos.kube_pod_status_ready
(gauge)
Describes whether the pod is ready to serve requests. Sampled every 60 seconds.
gcp.anthos.kube_pod_status_scheduled
(gauge)
Describes the status of the scheduling process for the pod. Sampled every 60 seconds.
gcp.anthos.kube_pod_status_scheduled_time
(gauge)
Unix timestamp when pod moved into scheduled status. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_status_current_healthy
(gauge)
Current number of healthy pods. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_status_desired_healthy
(gauge)
Minimum desired number of healthy pods. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_status_expected_pods
(gauge)
Total number of pods counted by this disruption budget. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_status_observed_generation
(gauge)
Most recent generation observed when updating this PDB status. Sampled every 60 seconds.
gcp.anthos.kube_poddisruptionbudget_status_pod_disruptions_allowed
(gauge)
Number of pod disruptions that are currently allowed. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_metadata_generation
(gauge)
Sequence number representing a specific generation of the desired state. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_owner
(gauge)
Information about the ReplicaSet's owner. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_spec_replicas
(gauge)
Number of desired pods for a ReplicaSet. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_status_fully_labeled_replicas
(gauge)
The number of fully labeled replicas per ReplicaSet. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_status_observed_generation
(gauge)
The generation observed by the ReplicaSet controller. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_status_ready_replicas
(gauge)
The number of ready replicas per ReplicaSet. Sampled every 60 seconds.
gcp.anthos.kube_replicaset_status_replicas
(gauge)
The number of replicas per ReplicaSet. Sampled every 60 seconds.
gcp.anthos.kube_resourcequota
(gauge)
Information about resource quota. Sampled every 60 seconds.
gcp.anthos.kube_resourcequota_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_secret_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_secret_info
(gauge)
Information about secret. Sampled every 60 seconds.
gcp.anthos.kube_secret_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_secret_metadata_resource_version
(gauge)
Resource version representing a specific version of secret. Sampled every 60 seconds.
gcp.anthos.kube_secret_type
(gauge)
Type about secret. Sampled every 60 seconds.
gcp.anthos.kube_service_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_service_info
(gauge)
Information about service. Sampled every 60 seconds.
gcp.anthos.kube_service_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_service_spec_type
(gauge)
Type about service. Sampled every 60 seconds.
gcp.anthos.kube_service_status_load_balancer_ingress
(gauge)
Service load balancer ingress status. Sampled every 60 seconds.
gcp.anthos.kube_stackdriver_spec_info
(gauge)
Stackdriver Spec information. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_metadata_generation
(gauge)
Sequence number representing a specific generation of the desired state for the StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_replicas
(gauge)
Number of desired pods for a StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_current_revision
(gauge)
Indicates the version of the StatefulSet used to generate Pods in the sequence [0,currentReplicas). Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_observed_generation
(gauge)
The generation observed by the StatefulSet controller. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_replicas
(gauge)
The number of replicas per StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_replicas_current
(gauge)
The number of current replicas per StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_replicas_ready
(gauge)
The number of ready replicas per StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_replicas_updated
(gauge)
The number of updated replicas per StatefulSet. Sampled every 60 seconds.
gcp.anthos.kube_statefulset_status_update_revision
(gauge)
Indicates the version of the StatefulSet used to generate Pods in the sequence [replicas-updatedReplicas,replicas). Sampled every 60 seconds.
gcp.anthos.kube_storageclass_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_storageclass_info
(gauge)
Information about storageclass. Sampled every 60 seconds.
gcp.anthos.kube_storageclass_labels
(gauge)
Kubernetes labels converted to Prometheus labels. Sampled every 60 seconds.
gcp.anthos.kube_validatingwebhookconfiguration_created
(gauge)
Unix creation timestamp. Sampled every 60 seconds.
gcp.anthos.kube_validatingwebhookconfiguration_info
(gauge)
Information about the ValidatingWebhookConfiguration. Sampled every 60 seconds.
gcp.anthos.kube_validatingwebhookconfiguration_metadata_resource_version
(gauge)
Resource version representing a specific version of the ValidatingWebhookConfiguration. Sampled every 60 seconds.
gcp.anthos.kubedns_dnsmasq_errors
(count)
Number of errors that have occurred getting metrics. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubedns_dnsmasq_evictions
(count)
Counter of DNS cache evictions (from start of process). Sampled every 60 seconds.
gcp.anthos.kubedns_dnsmasq_hits
(count)
Number of DNS cache hits (from start of process). Sampled every 60 seconds.
Shown as hit
gcp.anthos.kubedns_dnsmasq_insertions
(count)
Counter of DNS cache insertions (from start of process). Sampled every 60 seconds.
gcp.anthos.kubedns_dnsmasq_max_size
(count)
Maximum size of the DNS cache. Sampled every 60 seconds.
gcp.anthos.kubedns_dnsmasq_misses
(count)
Number of DNS cache misses (from start of process). Sampled every 60 seconds.
Shown as miss
gcp.anthos.kubedns_probe_dnsmasq_errors
(count)
Count of errors in name resolution of dnsmasq. Sampled every 60 seconds.
gcp.anthos.kubedns_probe_dnsmasq_latency_ms
(count)
Latency of the DNS probe request dnsmasq. Sampled every 60 seconds.
gcp.anthos.kubedns_probe_kubedns_errors
(count)
Count of errors in name resolution of kubedns. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubedns_probe_kubedns_latency_ms
(count)
Latency of the DNS probe request kubedns. Sampled every 60 seconds.
Shown as millisecond
gcp.anthos.kubelet_certificate_manager_client_expiration_renew_errors
(count)
Counter of certificate renewal errors. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_certificate_manager_client_expiration_seconds
(gauge)
Gauge of the lifetime of a certificate. The value is the date the certificate will expire in seconds since January 1, 1970 UTC. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_certificate_manager_client_ttl_seconds
(gauge)
Gauge of the TTL (time-to-live) of the Kubelet's client certificate. The value is in seconds until certificate expiry (negative if already expired). If client certificate is invalid or unused, the value will be +INF. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_certificate_manager_server_expiration_seconds
(gauge)
Gauge of the lifetime of a certificate. The value is the date the certificate will expire in seconds since January 1, 1970 UTC. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_certificate_manager_server_rotation_seconds
(count)
Histogram of the number of seconds the previous certificate lived before being rotated. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_certificate_manager_server_ttl_seconds
(gauge)
Gauge of the shortest TTL (time-to-live) of the Kubelet's serving certificate. The value is in seconds until certificate expiry (negative if already expired). If serving certificate is invalid or unused, the value will be +INF. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_cgroup_manager_duration_seconds
(count)
Duration in seconds for cgroup manager operations. Broken down by method. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_cgroup_manager_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds for cgroup manager operations. Broken down by method. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_cgroup_manager_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds for cgroup manager operations. Broken down by method. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_cgroup_manager_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds for cgroup manager operations. Broken down by method. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_container_log_filesystem_used_bytes
(gauge)
Bytes used by the container's logs on the filesystem. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kubelet_containers_per_pod_count
(count)
The number of containers per pod. Sampled every 60 seconds.
Shown as container
gcp.anthos.kubelet_containers_per_pod_count_count
(count)
The number of containers per pod. Sampled every 60 seconds.
Shown as container
gcp.anthos.kubelet_containers_per_pod_count_sum
(count)
The number of containers per pod. Sampled every 60 seconds.
Shown as container
gcp.anthos.kubelet_docker_operations
(count)
(Deprecated) Cumulative number of Docker operations by operation type. Sampled every 60 seconds.
gcp.anthos.kubelet_docker_operations_duration_seconds
(count)
Latency in seconds of Docker operations. Broken down by operation type. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_docker_operations_errors
(count)
(Deprecated) Cumulative number of Docker operation errors by operation type. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_docker_operations_errors_total
(count)
Cumulative number of Docker operation errors by operation type. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_docker_operations_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds of Docker operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_docker_operations_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds of Docker operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_docker_operations_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds of Docker operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_docker_operations_timeout
(count)
(Deprecated) Cumulative number of Docker operation timeout by operation type. Sampled every 60 seconds.
gcp.anthos.kubelet_docker_operations_timeout_total
(count)
Cumulative number of Docker operation timeout by operation type. Sampled every 60 seconds.
gcp.anthos.kubelet_docker_operations_total
(count)
Cumulative number of Docker operations by operation type. Sampled every 60 seconds.
gcp.anthos.kubelet_http_inflight_requests
(gauge)
Number of the inflight http requests. Sampled every 60 seconds.
Shown as request
gcp.anthos.kubelet_http_requests_duration_seconds
(count)
Duration in seconds to serve http requests. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_http_requests_total
(count)
Number of the http requests received since the server started. Sampled every 60 seconds.
Shown as request
gcp.anthos.kubelet_network_plugin_operations_duration_seconds
(count)
Latency in seconds of network plugin operations. Broken down by operation type. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_network_plugin_operations_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds of network plugin operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_network_plugin_operations_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds of network plugin operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_network_plugin_operations_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds of network plugin operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_node_config_error
(gauge)
This metric is true (1) if the node is experiencing a configuration-related error, false (0) otherwise. Sampled every 60 seconds.
gcp.anthos.kubelet_node_name
(gauge)
The node's name. The count is always 1. Sampled every 60 seconds.
gcp.anthos.kubelet_pleg_discard_events
(count)
The number of discard events in PLEG. Sampled every 60 seconds.
Shown as event
gcp.anthos.kubelet_pleg_last_seen_seconds
(gauge)
Timestamp in seconds when PLEG was last seen active. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pleg_relist_duration_seconds
(count)
Duration in seconds for relisting pods in PLEG. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pleg_relist_interval_microseconds
(gauge)
(Deprecated) Interval in microseconds between relisting in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pleg_relist_interval_microseconds_count
(count)
(Deprecated) Interval in microseconds between relisting in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pleg_relist_interval_microseconds_sum
(count)
(Deprecated) Interval in microseconds between relisting in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pleg_relist_interval_seconds
(count)
Interval in seconds between relisting in PLEG. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pleg_relist_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds for relisting pods in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pleg_relist_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds for relisting pods in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pleg_relist_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds for relisting pods in PLEG. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_start_duration_seconds
(count)
Duration in seconds for a single pod to go from pending to running. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pod_start_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds for a single pod to go from pending to running. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_start_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds for a single pod to go from pending to running. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_start_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds for a single pod to go from pending to running. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_duration_seconds
(count)
Duration in seconds to sync a single pod. Broken down by operation type: create, update, or sync. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pod_worker_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds to sync a single pod. Broken down by operation type: create, update, or sync. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds to sync a single pod. Broken down by operation type: create, update, or sync. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds to sync a single pod. Broken down by operation type: create, update, or sync. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_start_duration_seconds
(count)
Duration in seconds from seeing a pod to starting a worker. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_pod_worker_start_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds from seeing a pod to starting a worker. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_start_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds from seeing a pod to starting a worker. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_pod_worker_start_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds from seeing a pod to starting a worker. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_run_podsandbox_duration_seconds
(count)
Duration in seconds of the run_podsandbox operations. Broken down by RuntimeClass.Handler. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_running_container_count
(gauge)
Number of containers currently running. Sampled every 60 seconds.
Shown as container
gcp.anthos.kubelet_running_containers
(gauge)
Number of containers currently running. Sampled every 60 seconds.
Shown as container
gcp.anthos.kubelet_running_pod_count
(gauge)
Number of pods currently running. Sampled every 60 seconds.
gcp.anthos.kubelet_running_pods
(gauge)
Number of pods currently running. Sampled every 60 seconds.
gcp.anthos.kubelet_runtime_operations
(count)
(Deprecated) Cumulative number of runtime operations by operation type. Sampled every 60 seconds.
Shown as operation
gcp.anthos.kubelet_runtime_operations_duration_seconds
(count)
Duration in seconds of runtime operations. Broken down by operation type. Sampled every 60 seconds.
Shown as second
gcp.anthos.kubelet_runtime_operations_errors
(count)
(Deprecated) Cumulative number of runtime operation errors by operation type. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_runtime_operations_errors_total
(count)
Cumulative number of runtime operation errors by operation type. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_runtime_operations_latency_microseconds
(gauge)
(Deprecated) Latency in microseconds of runtime operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_runtime_operations_latency_microseconds_count
(count)
(Deprecated) Latency in microseconds of runtime operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_runtime_operations_latency_microseconds_sum
(count)
(Deprecated) Latency in microseconds of runtime operations. Broken down by operation type. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.kubelet_runtime_operations_total
(count)
Cumulative number of runtime operations by operation type. Sampled every 60 seconds.
Shown as operation
gcp.anthos.kubelet_server_expiration_renew_errors
(count)
Counter of certificate renewal errors. Sampled every 60 seconds.
Shown as error
gcp.anthos.kubelet_volume_stats_available_bytes
(gauge)
Number of available bytes in the volume. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kubelet_volume_stats_capacity_bytes
(gauge)
Capacity in bytes of the volume. Sampled every 60 seconds.
Shown as byte
gcp.anthos.kubelet_volume_stats_inodes
(gauge)
Maximum number of inodes in the volume. Sampled every 60 seconds.
gcp.anthos.kubelet_volume_stats_inodes_free
(gauge)
Number of free inodes in the volume. Sampled every 60 seconds.
gcp.anthos.kubelet_volume_stats_inodes_used
(gauge)
Number of used inodes in the volume. Sampled every 60 seconds.
gcp.anthos.kubelet_volume_stats_used_bytes
(gauge)
Number of used bytes in the volume. Sampled every 60 seconds.
Shown as byte
gcp.anthos.replicaset_adds
(count)
(Deprecated) Total number of adds handled by workqueue: replicaset. Sampled every 60 seconds.
gcp.anthos.replicaset_controller_rate_limiter_use
(gauge)
A metric measuring the saturation of the rate limiter for replicaset_controller. Sampled every 60 seconds.
gcp.anthos.replicaset_depth
(gauge)
(Deprecated) Current depth of workqueue: replicaset. Sampled every 60 seconds.
gcp.anthos.replicaset_longest_running_processor_microseconds
(gauge)
(Deprecated) How many microseconds has the longest running processor for replicaset been running. Sampled every 60 seconds.
Shown as microsecond
gcp.anthos.replicaset_queue_latency
(gauge)
(Deprecated) How long an item stays in workqueuereplicaset before being requested. Sampled every 60 seconds.
gcp.anthos.replicaset_queue_latency_count
(count)
(Deprecated) How long an item stays in workqueuereplicaset before being requested. Sampled every 60 seconds.
gcp.anthos.replicaset_queue_latency_sum
(count)
(Deprecated) How long an item stays in workqueuereplicaset before being requested. Sampled every 60 seconds.
gcp.anthos.replicaset_retries
(count)
(Deprecated) Total number of retries handled by workqueue: replicaset. Sampled every 60 seconds.
gcp.anthos.replicaset_unfinished_work_seconds
(gauge)
(Deprecated) How many seconds of work replicaset has done that is in progress and hasn't been observed by work_duration. Large values indicate stuck threads. One can deduce the number of stuck threads by observing the rate at which this increases. Sampled every 60 seconds.
gcp.anthos.replicaset_work_duration
(gauge)
(Deprecated) How long processing an item from workqueuereplicaset takes. Sampled every 60 seconds.
gcp.anthos.replicaset_work_duration_count
(count)
(Deprecated) How long processing an item from workqueuereplicaset takes. Sampled every 60 seconds.
gcp.anthos.replicaset_work_duration_sum
(count)
(Deprecated) How long processing an item from workqueuereplicaset takes. Sampled every 60 seconds.

Events

The Google Cloud Anthos integration does not include any events.

Service Checks

The Google Cloud Anthos integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

Further Reading

お役に立つドキュメント、リンクや記事:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers