このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Overview

Oracle Cloud Infrastructure (OCI) FastConnect is a dedicated, private connection between OCI and your environment.

This integration allows you to monitor and alert on the health, capacity, and performance of your FastConnect connection by collecting metrics and tags from the [oci_fastconnect][1] namespace

Setup

Installation

Once you set up the [Oracle Cloud Infrastructure][2] integration, ensure that any namespaces mentioned above are included in your [Connector Hub][3].

Data Collected

Metrics

oci.fastconnect.bits_received
(count)
Number of bits received on the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as bit
oci.fastconnect.bits_sent
(count)
Number of bits sent from the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as bit
oci.fastconnect.bytes_received
(count)
Number of bytes received on the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as byte
oci.fastconnect.bytes_sent
(count)
Number of bytes sent from the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as byte
oci.fastconnect.connection_state
(gauge)
The values are up (1) or down (0). For a virtual circuit, the operational state of the virtual circuit's interface. For a cross-connect group, this reflects the overall operational state of the cross-connects that make up the cross-connect group (LAG). If at least one of the cross-connects is up, this value is up (1). If all the cross-connects in the group are down, this value is down (0).
oci.fastconnect.ipv_4bgp_session_state
(gauge)
The values are up (1) or down (0). The status of the IPv4 BGP session for a virtual circuit.
oci.fastconnect.ipv_6bgp_session_state
(gauge)
The values are up (1) or down (0). The status of the IPv6 BGP session for a virtual circuit.
oci.fastconnect.packets_discarded
(count)
Number of packets discarded at the Oracle end of the connection.
Shown as packet
oci.fastconnect.packets_error
(count)
Number of packets dropped at the Oracle end of the connection. Dropped packets indicate a misconfiguration in some part of the overall system. Check if there's been a change to the configuration of your VCN, the virtual circuit, or your CPE. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as packet
oci.fastconnect.packets_received
(count)
Number of packets received on the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as packet
oci.fastconnect.packets_sent
(count)
Number of packets sent from the FastConnect interface at the Oracle end of the connection. For a cross-connect group (LAG), the value is the sum across all cross-connects in the group.
Shown as packet

Service Checks

OCI FastConnect does not include any service checks.

Events

OCI FastConnect does not include any events.

Troubleshooting

Need help? Contact [Datadog support][5]. [1]: https://docs.oracle.com/en-us/iaas/Content/Network/Reference/fastconnectmetrics.htm [2]: https://docs.datadoghq.com/integrations/oracle_cloud_infrastructure/ [3]: https://cloud.oracle.com/connector-hub/service-connectors [4]: https://github.com/DataDog/integrations-internal-core/blob/main/oci_fastconnect/metadata.csv [5]: https://docs.datadoghq.com/help/

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers