このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Use Observability Pipelines’ Elasticsearch destination to send logs to Elasticsearch.

Setup

Set up the Elasticsearch destination and its environment variables when you set up a pipeline. The information below is configured in the pipelines UI.

Set up the destination

The following fields are optional:

  1. Enter the name for the Elasticsearch index. See template syntax if you want to route logs to different indexes based on specific fields in your logs.
  2. Enter the Elasticsearch version.

Set the environment variables

  • Elasticsearch authentication username:
    • Stored in the environment variable: DD_OP_DESTINATION_ELASTICSEARCH_USERNAME.
  • Elasticsearch authentication password:
    • Stored in the environment variable: DD_OP_DESTINATION_ELASTICSEARCH_PASSWORD.
  • Elasticsearch endpoint URL:
    • Stored in the environment variable: DD_OP_DESTINATION_ELASTICSEARCH_ENDPOINT_URL.

How the destination works

Event batching

A batch of events is flushed when one of these parameters is met. See event batching for more information.

Max EventsMax BytesTimeout (seconds)
None10,000,0001
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers