EFS file systems should be in backup plans

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

This control verifies whether Amazon EFS file systems are incorporated into AWS Backup plans.

Ensuring EFS file systems are part of backup plans helps safeguard data against loss and accidental deletion. If a third party backup system is in operation, findings from this control can be muted.

Remediation

To learn how to enable create a backup plan, see the Create a backup plan section of the AWS Backup Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers