Server parameter 'log_retention_days' should be greater than 3 days for PostgreSQL Database Server

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Enabling log_retention_days helps PostgreSQL Database to set the number of days a log file is retained, which in turn generates query and error logs. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for log_retention_days.
  5. Enter a value in range 4-7 (inclusive) and save.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers