Jumpcloud admin triggered impossible travel scenario

Set up the jumpcloud integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect an Impossible Travel event with a JumpCloud administrator.

Strategy

The Impossible Travel detection type’s algorithm compares the GeoIP data of the last log and the current log to determine if the user (@usr.name) traveled more than 500km at over 1,000km/h.

Triage and response

  1. Determine if {{@usr.name}} should be connecting from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} and {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}} in a short period of time.
  2. If the user should not be connecting from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} or {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}}, then consider isolating the account and resetting the credentials.
  3. Use the Cloud SIEM - User Investigation dashboard to audit any user actions that may have occurred after the illegitimate login.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers