Ensure network interfaces are assigned to appropriate zone

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Firewall zones define the trust level of network connections or interfaces. Note: Changing firewall settings while connected over network can result in being locked out of the system.

Rationale

A network interface not assigned to the appropriate zone can allow unexpected or undesired network traffic to be accepted on the interface.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers