Ensure ufw Firewall Rules Exist for All Open Ports

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Any ports that have been opened on non-loopback addresses need firewall rules to govern traffic.

Rationale

Without a firewall rule configured for open ports default firewall policy will drop all packets to these ports.

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers