이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Setup

Follow the Microsoft Entra single sign-on (SSO) integration with Datadog tutorial to configure Entra ID as a SAML identity provider (IdP). Note: An Entra ID subscription is required. If you don’t have a subscription, sign up for a free account.

Datadog

  1. Go to the Datadog SAML page.

  2. Choose and upload the SAML XML Metadata file downloaded from Microsoft.

  3. You should see the messages SAML is ready and Valid IdP metadata installed:

    SAML_Configuration___Datadog11
  4. Click Enable to start using Entra ID single sign-on with SAML:

    SAML_Configuration___Datadog12

Advanced URL

If you are using SSO with a Datadog button or link, a sign-on URL is required:

  1. Retrieve your Single Sign-on URL from the Datadog SAML page:

    SAML_Configuration___Datadog13
  2. In Microsoft Entra ID, navigate to the SSO Configuration section of your application, check Show advanced URL settings, and add your single sign-on URL.

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers