CI Visibility Pipelines

Search or aggregate your CI Visibility pipeline events and send them to your Datadog site over HTTP. See the CI Pipeline Visibility in Datadog page for more information.

POST https://api.ap1.datadoghq.com/api/v2/ci/pipelinehttps://api.datadoghq.eu/api/v2/ci/pipelinehttps://api.ddog-gov.com/api/v2/ci/pipelinehttps://api.datadoghq.com/api/v2/ci/pipelinehttps://api.us3.datadoghq.com/api/v2/ci/pipelinehttps://api.us5.datadoghq.com/api/v2/ci/pipeline

개요

Send your pipeline event to your Datadog platform over HTTP. For details about how pipeline executions are modeled and what execution types we support, see Pipeline Data Model And Execution Types.

Pipeline events can be submitted with a timestamp that is up to 18 hours in the past.

요청

Body Data (required)

Expand All

항목

유형

설명

data

object

Data of the pipeline event to create.

attributes

object

Attributes of the pipeline event to create.

env

string

The Datadog environment.

provider_name

string

The name of the CI provider. By default, this is "custom".

resource [required]

 <oneOf>

Details of the CI pipeline event.

Option 1

 <oneOf>

Details of the top level pipeline, build, or workflow of your CI.

Option 1

object

Details of a finished pipeline.

end [required]

date-time

Time when the pipeline run finished. It cannot be older than 18 hours in the past from the current time. The time format must be RFC3339.

error

object

Contains information of the CI error.

domain

enum

Error category used to differentiate between issues related to the developer or provider environments. Allowed enum values: provider,user,unknown

message

string

Error message.

stack

string

The stack trace of the reported errors.

type

string

Short description of the error type.

git

object

If pipelines are triggered due to actions to a Git repository, then all payloads must contain this. Note that either tag or branch has to be provided, but not both.

author_email [required]

string

The commit author email.

author_name

string

The commit author name.

author_time

string

The commit author timestamp in RFC3339 format.

branch

string

The branch name (if a tag use the tag parameter).

commit_time

string

The commit timestamp in RFC3339 format.

committer_email

string

The committer email.

committer_name

string

The committer name.

default_branch

string

The Git repository's default branch.

message

string

The commit message.

repository_url [required]

string

The URL of the repository.

sha [required]

string

The git commit SHA.

tag

string

The tag name (if a branch use the branch parameter).

is_manual

boolean

Whether or not the pipeline was triggered manually by the user.

is_resumed

boolean

Whether or not the pipeline was resumed after being blocked.

level [required]

enum

Used to distinguish between pipelines, stages, jobs, and steps. Allowed enum values: pipeline

default: pipeline

metrics

[string]

A list of user-defined metrics. The metrics must follow the key:value pattern and the value must be numeric.

name [required]

string

Name of the pipeline. All pipeline runs for the builds should have the same name.

node

object

Contains information of the host running the pipeline, stage, job, or step.

hostname

string

FQDN of the host.

labels

[string]

A list of labels used to select or identify the node.

name

string

Name for the host.

workspace

string

The path where the code is checked out.

parameters

object

A map of key-value parameters or environment variables that were defined for the pipeline.

<any-key>

string

parent_pipeline

object

If the pipeline is triggered as child of another pipeline, this should contain the details of the parent pipeline.

id [required]

string

UUID of a pipeline.

url

string

The URL to look at the pipeline in the CI provider UI.

partial_retry [required]

boolean

Whether or not the pipeline was a partial retry of a previous attempt. A partial retry is one which only runs a subset of the original jobs.

pipeline_id

string

Any ID used in the provider to identify the pipeline run even if it is not unique across retries. If the pipeline_id is unique, then both unique_id and pipeline_id can be set to the same value.

previous_attempt

object

If the pipeline is a retry, this should contain the details of the previous attempt.

id [required]

string

UUID of a pipeline.

url

string

The URL to look at the pipeline in the CI provider UI.

queue_time

int64

The queue time in milliseconds, if applicable.

start [required]

date-time

Time when the pipeline run started (it should not include any queue time). The time format must be RFC3339.

status [required]

enum

The final status of the pipeline. Allowed enum values: success,error,canceled,skipped,blocked

tags

[string]

A list of user-defined tags. The tags must follow the key:value pattern.

unique_id [required]

string

UUID of the pipeline run. The ID has to be unique across retries and pipelines, including partial retries.

url [required]

string

The URL to look at the pipeline in the CI provider UI.

Option 2

object

Details of a running pipeline.

error

object

Contains information of the CI error.

domain

enum

Error category used to differentiate between issues related to the developer or provider environments. Allowed enum values: provider,user,unknown

message

string

Error message.

stack

string

The stack trace of the reported errors.

type

string

Short description of the error type.

git

object

If pipelines are triggered due to actions to a Git repository, then all payloads must contain this. Note that either tag or branch has to be provided, but not both.

author_email [required]

string

The commit author email.

author_name

string

The commit author name.

author_time

string

The commit author timestamp in RFC3339 format.

branch

string

The branch name (if a tag use the tag parameter).

commit_time

string

The commit timestamp in RFC3339 format.

committer_email

string

The committer email.

committer_name

string

The committer name.

default_branch

string

The Git repository's default branch.

message

string

The commit message.

repository_url [required]

string

The URL of the repository.

sha [required]

string

The git commit SHA.

tag

string

The tag name (if a branch use the branch parameter).

is_manual

boolean

Whether or not the pipeline was triggered manually by the user.

is_resumed

boolean

Whether or not the pipeline was resumed after being blocked.

level [required]

enum

Used to distinguish between pipelines, stages, jobs, and steps. Allowed enum values: pipeline

default: pipeline

metrics

[string]

A list of user-defined metrics. The metrics must follow the key:value pattern and the value must be numeric.

name [required]

string

Name of the pipeline. All pipeline runs for the builds should have the same name.

node

object

Contains information of the host running the pipeline, stage, job, or step.

hostname

string

FQDN of the host.

labels

[string]

A list of labels used to select or identify the node.

name

string

Name for the host.

workspace

string

The path where the code is checked out.

parameters

object

A map of key-value parameters or environment variables that were defined for the pipeline.

<any-key>

string

parent_pipeline

object

If the pipeline is triggered as child of another pipeline, this should contain the details of the parent pipeline.

id [required]

string

UUID of a pipeline.

url

string

The URL to look at the pipeline in the CI provider UI.

partial_retry [required]

boolean

Whether or not the pipeline was a partial retry of a previous attempt. A partial retry is one which only runs a subset of the original jobs.

pipeline_id

string

Any ID used in the provider to identify the pipeline run even if it is not unique across retries. If the pipeline_id is unique, then both unique_id and pipeline_id can be set to the same value.

previous_attempt

object

If the pipeline is a retry, this should contain the details of the previous attempt.

id [required]

string

UUID of a pipeline.

url

string

The URL to look at the pipeline in the CI provider UI.

queue_time

int64

The queue time in milliseconds, if applicable.

start [required]

date-time

Time when the pipeline run started (it should not include any queue time). The time format must be RFC3339.

status [required]

enum

The in progress status of the pipeline. Allowed enum values: running

tags

[string]

A list of user-defined tags. The tags must follow the key:value pattern.

unique_id [required]

string

UUID of the pipeline run. The ID has to be the same as the finished pipeline.

url [required]

string

The URL to look at the pipeline in the CI provider UI.

Option 2

object

Details of a CI stage.

dependencies

[string]

A list of stage IDs that this stage depends on.

end [required]

date-time

Time when the stage run finished. The time format must be RFC3339.

error

object

Contains information of the CI error.

domain

enum

Error category used to differentiate between issues related to the developer or provider environments. Allowed enum values: provider,user,unknown

message

string

Error message.

stack

string

The stack trace of the reported errors.

type

string

Short description of the error type.

git

object

If pipelines are triggered due to actions to a Git repository, then all payloads must contain this. Note that either tag or branch has to be provided, but not both.

author_email [required]

string

The commit author email.

author_name

string

The commit author name.

author_time

string

The commit author timestamp in RFC3339 format.

branch

string

The branch name (if a tag use the tag parameter).

commit_time

string

The commit timestamp in RFC3339 format.

committer_email

string

The committer email.

committer_name

string

The committer name.

default_branch

string

The Git repository's default branch.

message

string

The commit message.

repository_url [required]

string

The URL of the repository.

sha [required]

string

The git commit SHA.

tag

string

The tag name (if a branch use the branch parameter).

id [required]

string

UUID for the stage. It has to be unique at least in the pipeline scope.

level [required]

enum

Used to distinguish between pipelines, stages, jobs and steps. Allowed enum values: stage

default: stage

metrics

[string]

A list of user-defined metrics. The metrics must follow the key:value pattern and the value must be numeric.

name [required]

string

The name for the stage.

node

object

Contains information of the host running the pipeline, stage, job, or step.

hostname

string

FQDN of the host.

labels

[string]

A list of labels used to select or identify the node.

name

string

Name for the host.

workspace

string

The path where the code is checked out.

parameters

object

A map of key-value parameters or environment variables that were defined for the pipeline.

<any-key>

string

pipeline_name [required]

string

The parent pipeline name.

pipeline_unique_id [required]

string

The parent pipeline UUID.

queue_time

int64

The queue time in milliseconds, if applicable.

start [required]

date-time

Time when the stage run started (it should not include any queue time). The time format must be RFC3339.

status [required]

enum

The final status of the stage. Allowed enum values: success,error,canceled,skipped

tags

[string]

A list of user-defined tags. The tags must follow the key:value pattern.

Option 3

object

Details of a CI job.

dependencies

[string]

A list of job IDs that this job depends on.

end [required]

date-time

Time when the job run finished. The time format must be RFC3339.

error

object

Contains information of the CI error.

domain

enum

Error category used to differentiate between issues related to the developer or provider environments. Allowed enum values: provider,user,unknown

message

string

Error message.

stack

string

The stack trace of the reported errors.

type

string

Short description of the error type.

git

object

If pipelines are triggered due to actions to a Git repository, then all payloads must contain this. Note that either tag or branch has to be provided, but not both.

author_email [required]

string

The commit author email.

author_name

string

The commit author name.

author_time

string

The commit author timestamp in RFC3339 format.

branch

string

The branch name (if a tag use the tag parameter).

commit_time

string

The commit timestamp in RFC3339 format.

committer_email

string

The committer email.

committer_name

string

The committer name.

default_branch

string

The Git repository's default branch.

message

string

The commit message.

repository_url [required]

string

The URL of the repository.

sha [required]

string

The git commit SHA.

tag

string

The tag name (if a branch use the branch parameter).

id [required]

string

The UUID for the job. It has to be unique within each pipeline execution.

level [required]

enum

Used to distinguish between pipelines, stages, jobs, and steps. Allowed enum values: job

default: job

metrics

[string]

A list of user-defined metrics. The metrics must follow the key:value pattern and the value must be numeric.

name [required]

string

The name for the job.

node

object

Contains information of the host running the pipeline, stage, job, or step.

hostname

string

FQDN of the host.

labels

[string]

A list of labels used to select or identify the node.

name

string

Name for the host.

workspace

string

The path where the code is checked out.

parameters

object

A map of key-value parameters or environment variables that were defined for the pipeline.

<any-key>

string

pipeline_name [required]

string

The parent pipeline name.

pipeline_unique_id [required]

string

The parent pipeline UUID.

queue_time

int64

The queue time in milliseconds, if applicable.

stage_id

string

The parent stage UUID (if applicable).

stage_name

string

The parent stage name (if applicable).

start [required]

date-time

Time when the job run instance started (it should not include any queue time). The time format must be RFC3339.

status [required]

enum

The final status of the job. Allowed enum values: success,error,canceled,skipped

tags

[string]

A list of user-defined tags. The tags must follow the key:value pattern.

url [required]

string

The URL to look at the job in the CI provider UI.

Option 4

object

Details of a CI step.

end [required]

date-time

Time when the step run finished. The time format must be RFC3339.

error

object

Contains information of the CI error.

domain

enum

Error category used to differentiate between issues related to the developer or provider environments. Allowed enum values: provider,user,unknown

message

string

Error message.

stack

string

The stack trace of the reported errors.

type

string

Short description of the error type.

git

object

If pipelines are triggered due to actions to a Git repository, then all payloads must contain this. Note that either tag or branch has to be provided, but not both.

author_email [required]

string

The commit author email.

author_name

string

The commit author name.

author_time

string

The commit author timestamp in RFC3339 format.

branch

string

The branch name (if a tag use the tag parameter).

commit_time

string

The commit timestamp in RFC3339 format.

committer_email

string

The committer email.

committer_name

string

The committer name.

default_branch

string

The Git repository's default branch.

message

string

The commit message.

repository_url [required]

string

The URL of the repository.

sha [required]

string

The git commit SHA.

tag

string

The tag name (if a branch use the branch parameter).

id [required]

string

UUID for the step. It has to be unique within each pipeline execution.

job_id

string

The parent job UUID (if applicable).

job_name

string

The parent job name (if applicable).

level [required]

enum

Used to distinguish between pipelines, stages, jobs and steps. Allowed enum values: step

default: step

metrics

[string]

A list of user-defined metrics. The metrics must follow the key:value pattern and the value must be numeric.

name [required]

string

The name for the step.

node

object

Contains information of the host running the pipeline, stage, job, or step.

hostname

string

FQDN of the host.

labels

[string]

A list of labels used to select or identify the node.

name

string

Name for the host.

workspace

string

The path where the code is checked out.

parameters

object

A map of key-value parameters or environment variables that were defined for the pipeline.

<any-key>

string

pipeline_name [required]

string

The parent pipeline name.

pipeline_unique_id [required]

string

The parent pipeline UUID.

stage_id

string

The parent stage UUID (if applicable).

stage_name

string

The parent stage name (if applicable).

start [required]

date-time

Time when the step run started. The time format must be RFC3339.

status [required]

enum

The final status of the step. Allowed enum values: success,error

tags

[string]

A list of user-defined tags. The tags must follow the key:value pattern.

url

string

The URL to look at the step in the CI provider UI.

service

string

If the CI provider is SaaS, use this to differentiate between instances.

type

enum

Type of the event. Allowed enum values: cipipeline_resource_request

default: cipipeline_resource_request

{
  "data": {
    "attributes": {
      "resource": {
        "level": "pipeline",
        "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        "name": "Deploy to AWS",
        "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        "start": "2021-11-11T11:09:11+00:00",
        "end": "2021-11-11T11:10:41+00:00",
        "status": "success",
        "partial_retry": false,
        "git": {
          "repository_url": "https://github.com/DataDog/datadog-agent",
          "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2",
          "author_email": "john.doe@email.com"
        }
      }
    },
    "type": "cipipeline_resource_request"
  }
}
{
  "data": {
    "attributes": {
      "provider_name": "example-provider",
      "resource": {
        "level": "pipeline",
        "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        "name": "Deploy to AWS",
        "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        "start": "2021-11-11T11:09:11+00:00",
        "end": "2021-11-11T11:10:41+00:00",
        "status": "success",
        "partial_retry": false,
        "git": {
          "repository_url": "https://github.com/DataDog/datadog-agent",
          "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2",
          "author_email": "john.doe@email.com"
        }
      }
    },
    "type": "cipipeline_resource_request"
  }
}
{
  "data": {
    "attributes": {
      "resource": {
        "level": "pipeline",
        "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        "name": "Deploy to AWS",
        "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        "start": "2021-11-11T11:09:11+00:00",
        "status": "running",
        "partial_retry": false,
        "git": {
          "repository_url": "https://github.com/DataDog/datadog-agent",
          "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2",
          "author_email": "john.doe@email.com"
        }
      }
    },
    "type": "cipipeline_resource_request"
  }
}

응답

Request accepted for processing

Expand All

항목

유형

설명

No response body

{}

Bad Request

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Unauthorized

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Request Timeout

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Payload Too Large

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too Many Requests

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Internal Server Error

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Service Unavailable

Errors occurred.

Expand All

항목

유형

설명

errors

[object]

Structured errors.

detail

string

Error message.

status

string

Error code.

title

string

Error title.

{
  "errors": [
    {
      "detail": "Malformed payload",
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

코드 사례

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipeline" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -d @- << EOF { "data": { "attributes": { "resource": { "level": "pipeline", "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a", "name": "Deploy to AWS", "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1", "start": "2021-11-11T11:09:11+00:00", "end": "2021-11-11T11:10:41+00:00", "status": "success", "partial_retry": false, "git": { "repository_url": "https://github.com/DataDog/datadog-agent", "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2", "author_email": "john.doe@email.com" } } }, "type": "cipipeline_resource_request" } } EOF
                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipeline" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -d @- << EOF { "data": { "attributes": { "provider_name": "example-provider", "resource": { "level": "pipeline", "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a", "name": "Deploy to AWS", "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1", "start": "2021-11-11T11:09:11+00:00", "end": "2021-11-11T11:10:41+00:00", "status": "success", "partial_retry": false, "git": { "repository_url": "https://github.com/DataDog/datadog-agent", "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2", "author_email": "john.doe@email.com" } } }, "type": "cipipeline_resource_request" } } EOF
                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipeline" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -d @- << EOF { "data": { "attributes": { "resource": { "level": "pipeline", "unique_id": "3eacb6f3-ff04-4e10-8a9c-46e6d054024a", "name": "Deploy to AWS", "url": "https://my-ci-provider.example/pipelines/my-pipeline/run/1", "start": "2021-11-11T11:09:11+00:00", "status": "running", "partial_retry": false, "git": { "repository_url": "https://github.com/DataDog/datadog-agent", "sha": "7f263865994b76066c4612fd1965215e7dcb4cd2", "author_email": "john.doe@email.com" } } }, "type": "cipipeline_resource_request" } } EOF
// Send pipeline event returns "Request accepted for processing" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppCreatePipelineEventRequest{
		Data: &datadogV2.CIAppCreatePipelineEventRequestData{
			Attributes: &datadogV2.CIAppCreatePipelineEventRequestAttributes{
				Resource: datadogV2.CIAppCreatePipelineEventRequestAttributesResource{
					CIAppPipelineEventPipeline: &datadogV2.CIAppPipelineEventPipeline{
						CIAppPipelineEventFinishedPipeline: &datadogV2.CIAppPipelineEventFinishedPipeline{
							Level:        datadogV2.CIAPPPIPELINEEVENTPIPELINELEVEL_PIPELINE,
							UniqueId:     "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
							Name:         "Deploy to AWS",
							Url:          "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
							Start:        time.Now().Add(time.Second * -120),
							End:          time.Now().Add(time.Second * -30),
							Status:       datadogV2.CIAPPPIPELINEEVENTPIPELINESTATUS_SUCCESS,
							PartialRetry: false,
							Git: *datadogV2.NewNullableCIAppGitInfo(&datadogV2.CIAppGitInfo{
								RepositoryUrl: "https://github.com/DataDog/datadog-agent",
								Sha:           "7f263865994b76066c4612fd1965215e7dcb4cd2",
								AuthorEmail:   "john.doe@email.com",
							}),
						}}},
			},
			Type: datadogV2.CIAPPCREATEPIPELINEEVENTREQUESTDATATYPE_CIPIPELINE_RESOURCE_REQUEST.Ptr(),
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.CreateCIAppPipelineEvent(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`:\n%s\n", responseContent)
}
// Send pipeline event with custom provider returns "Request accepted for processing" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppCreatePipelineEventRequest{
		Data: &datadogV2.CIAppCreatePipelineEventRequestData{
			Attributes: &datadogV2.CIAppCreatePipelineEventRequestAttributes{
				ProviderName: datadog.PtrString("example-provider"),
				Resource: datadogV2.CIAppCreatePipelineEventRequestAttributesResource{
					CIAppPipelineEventPipeline: &datadogV2.CIAppPipelineEventPipeline{
						CIAppPipelineEventFinishedPipeline: &datadogV2.CIAppPipelineEventFinishedPipeline{
							Level:        datadogV2.CIAPPPIPELINEEVENTPIPELINELEVEL_PIPELINE,
							UniqueId:     "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
							Name:         "Deploy to AWS",
							Url:          "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
							Start:        time.Now().Add(time.Second * -120),
							End:          time.Now().Add(time.Second * -30),
							Status:       datadogV2.CIAPPPIPELINEEVENTPIPELINESTATUS_SUCCESS,
							PartialRetry: false,
							Git: *datadogV2.NewNullableCIAppGitInfo(&datadogV2.CIAppGitInfo{
								RepositoryUrl: "https://github.com/DataDog/datadog-agent",
								Sha:           "7f263865994b76066c4612fd1965215e7dcb4cd2",
								AuthorEmail:   "john.doe@email.com",
							}),
						}}},
			},
			Type: datadogV2.CIAPPCREATEPIPELINEEVENTREQUESTDATATYPE_CIPIPELINE_RESOURCE_REQUEST.Ptr(),
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.CreateCIAppPipelineEvent(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`:\n%s\n", responseContent)
}
// Send running pipeline event returns "Request accepted for processing" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppCreatePipelineEventRequest{
		Data: &datadogV2.CIAppCreatePipelineEventRequestData{
			Attributes: &datadogV2.CIAppCreatePipelineEventRequestAttributes{
				Resource: datadogV2.CIAppCreatePipelineEventRequestAttributesResource{
					CIAppPipelineEventPipeline: &datadogV2.CIAppPipelineEventPipeline{
						CIAppPipelineEventInProgressPipeline: &datadogV2.CIAppPipelineEventInProgressPipeline{
							Level:        datadogV2.CIAPPPIPELINEEVENTPIPELINELEVEL_PIPELINE,
							UniqueId:     "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
							Name:         "Deploy to AWS",
							Url:          "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
							Start:        time.Now().Add(time.Second * -120),
							Status:       datadogV2.CIAPPPIPELINEEVENTPIPELINEINPROGRESSSTATUS_RUNNING,
							PartialRetry: false,
							Git: *datadogV2.NewNullableCIAppGitInfo(&datadogV2.CIAppGitInfo{
								RepositoryUrl: "https://github.com/DataDog/datadog-agent",
								Sha:           "7f263865994b76066c4612fd1965215e7dcb4cd2",
								AuthorEmail:   "john.doe@email.com",
							}),
						}}},
			},
			Type: datadogV2.CIAPPCREATEPIPELINEEVENTREQUESTDATATYPE_CIPIPELINE_RESOURCE_REQUEST.Ptr(),
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.CreateCIAppPipelineEvent(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.CreateCIAppPipelineEvent`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" go run "main.go"
// Send pipeline event returns "Request accepted for processing" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequest;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributes;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributesResource;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestData;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestDataType;
import com.datadog.api.client.v2.model.CIAppGitInfo;
import com.datadog.api.client.v2.model.CIAppPipelineEventFinishedPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineLevel;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineStatus;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppCreatePipelineEventRequest body =
        new CIAppCreatePipelineEventRequest()
            .data(
                new CIAppCreatePipelineEventRequestData()
                    .attributes(
                        new CIAppCreatePipelineEventRequestAttributes()
                            .resource(
                                new CIAppCreatePipelineEventRequestAttributesResource(
                                    new CIAppPipelineEventPipeline(
                                        new CIAppPipelineEventFinishedPipeline()
                                            .level(CIAppPipelineEventPipelineLevel.PIPELINE)
                                            .uniqueId("3eacb6f3-ff04-4e10-8a9c-46e6d054024a")
                                            .name("Deploy to AWS")
                                            .url(
                                                "https://my-ci-provider.example/pipelines/my-pipeline/run/1")
                                            .start(OffsetDateTime.now().plusSeconds(-120))
                                            .end(OffsetDateTime.now().plusSeconds(-30))
                                            .status(CIAppPipelineEventPipelineStatus.SUCCESS)
                                            .partialRetry(false)
                                            .git(
                                                new CIAppGitInfo()
                                                    .repositoryUrl(
                                                        "https://github.com/DataDog/datadog-agent")
                                                    .sha("7f263865994b76066c4612fd1965215e7dcb4cd2")
                                                    .authorEmail("john.doe@email.com"))))))
                    .type(CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST));

    try {
      apiInstance.createCIAppPipelineEvent(body);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling CiVisibilityPipelinesApi#createCIAppPipelineEvent");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}
// Send pipeline event with custom provider returns "Request accepted for processing" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequest;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributes;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributesResource;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestData;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestDataType;
import com.datadog.api.client.v2.model.CIAppGitInfo;
import com.datadog.api.client.v2.model.CIAppPipelineEventFinishedPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineLevel;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineStatus;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppCreatePipelineEventRequest body =
        new CIAppCreatePipelineEventRequest()
            .data(
                new CIAppCreatePipelineEventRequestData()
                    .attributes(
                        new CIAppCreatePipelineEventRequestAttributes()
                            .providerName("example-provider")
                            .resource(
                                new CIAppCreatePipelineEventRequestAttributesResource(
                                    new CIAppPipelineEventPipeline(
                                        new CIAppPipelineEventFinishedPipeline()
                                            .level(CIAppPipelineEventPipelineLevel.PIPELINE)
                                            .uniqueId("3eacb6f3-ff04-4e10-8a9c-46e6d054024a")
                                            .name("Deploy to AWS")
                                            .url(
                                                "https://my-ci-provider.example/pipelines/my-pipeline/run/1")
                                            .start(OffsetDateTime.now().plusSeconds(-120))
                                            .end(OffsetDateTime.now().plusSeconds(-30))
                                            .status(CIAppPipelineEventPipelineStatus.SUCCESS)
                                            .partialRetry(false)
                                            .git(
                                                new CIAppGitInfo()
                                                    .repositoryUrl(
                                                        "https://github.com/DataDog/datadog-agent")
                                                    .sha("7f263865994b76066c4612fd1965215e7dcb4cd2")
                                                    .authorEmail("john.doe@email.com"))))))
                    .type(CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST));

    try {
      apiInstance.createCIAppPipelineEvent(body);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling CiVisibilityPipelinesApi#createCIAppPipelineEvent");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}
// Send running pipeline event returns "Request accepted for processing" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequest;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributes;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestAttributesResource;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestData;
import com.datadog.api.client.v2.model.CIAppCreatePipelineEventRequestDataType;
import com.datadog.api.client.v2.model.CIAppGitInfo;
import com.datadog.api.client.v2.model.CIAppPipelineEventInProgressPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipeline;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineInProgressStatus;
import com.datadog.api.client.v2.model.CIAppPipelineEventPipelineLevel;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppCreatePipelineEventRequest body =
        new CIAppCreatePipelineEventRequest()
            .data(
                new CIAppCreatePipelineEventRequestData()
                    .attributes(
                        new CIAppCreatePipelineEventRequestAttributes()
                            .resource(
                                new CIAppCreatePipelineEventRequestAttributesResource(
                                    new CIAppPipelineEventPipeline(
                                        new CIAppPipelineEventInProgressPipeline()
                                            .level(CIAppPipelineEventPipelineLevel.PIPELINE)
                                            .uniqueId("3eacb6f3-ff04-4e10-8a9c-46e6d054024a")
                                            .name("Deploy to AWS")
                                            .url(
                                                "https://my-ci-provider.example/pipelines/my-pipeline/run/1")
                                            .start(OffsetDateTime.now().plusSeconds(-120))
                                            .status(
                                                CIAppPipelineEventPipelineInProgressStatus.RUNNING)
                                            .partialRetry(false)
                                            .git(
                                                new CIAppGitInfo()
                                                    .repositoryUrl(
                                                        "https://github.com/DataDog/datadog-agent")
                                                    .sha("7f263865994b76066c4612fd1965215e7dcb4cd2")
                                                    .authorEmail("john.doe@email.com"))))))
                    .type(CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST));

    try {
      apiInstance.createCIAppPipelineEvent(body);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling CiVisibilityPipelinesApi#createCIAppPipelineEvent");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" java "Example.java"
"""
Send pipeline event returns "Request accepted for processing" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request import CIAppCreatePipelineEventRequest
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_attributes import (
    CIAppCreatePipelineEventRequestAttributes,
)
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data import CIAppCreatePipelineEventRequestData
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data_type import (
    CIAppCreatePipelineEventRequestDataType,
)
from datadog_api_client.v2.model.ci_app_git_info import CIAppGitInfo
from datadog_api_client.v2.model.ci_app_pipeline_event_finished_pipeline import CIAppPipelineEventFinishedPipeline
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_level import CIAppPipelineEventPipelineLevel
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_status import CIAppPipelineEventPipelineStatus

body = CIAppCreatePipelineEventRequest(
    data=CIAppCreatePipelineEventRequestData(
        attributes=CIAppCreatePipelineEventRequestAttributes(
            resource=CIAppPipelineEventFinishedPipeline(
                level=CIAppPipelineEventPipelineLevel.PIPELINE,
                unique_id="3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
                name="Deploy to AWS",
                url="https://my-ci-provider.example/pipelines/my-pipeline/run/1",
                start=(datetime.now() + relativedelta(seconds=-120)),
                end=(datetime.now() + relativedelta(seconds=-30)),
                status=CIAppPipelineEventPipelineStatus.SUCCESS,
                partial_retry=False,
                git=CIAppGitInfo(
                    repository_url="https://github.com/DataDog/datadog-agent",
                    sha="7f263865994b76066c4612fd1965215e7dcb4cd2",
                    author_email="john.doe@email.com",
                ),
            ),
        ),
        type=CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST,
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.create_ci_app_pipeline_event(body=body)

    print(response)
"""
Send pipeline event with custom provider returns "Request accepted for processing" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request import CIAppCreatePipelineEventRequest
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_attributes import (
    CIAppCreatePipelineEventRequestAttributes,
)
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data import CIAppCreatePipelineEventRequestData
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data_type import (
    CIAppCreatePipelineEventRequestDataType,
)
from datadog_api_client.v2.model.ci_app_git_info import CIAppGitInfo
from datadog_api_client.v2.model.ci_app_pipeline_event_finished_pipeline import CIAppPipelineEventFinishedPipeline
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_level import CIAppPipelineEventPipelineLevel
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_status import CIAppPipelineEventPipelineStatus

body = CIAppCreatePipelineEventRequest(
    data=CIAppCreatePipelineEventRequestData(
        attributes=CIAppCreatePipelineEventRequestAttributes(
            provider_name="example-provider",
            resource=CIAppPipelineEventFinishedPipeline(
                level=CIAppPipelineEventPipelineLevel.PIPELINE,
                unique_id="3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
                name="Deploy to AWS",
                url="https://my-ci-provider.example/pipelines/my-pipeline/run/1",
                start=(datetime.now() + relativedelta(seconds=-120)),
                end=(datetime.now() + relativedelta(seconds=-30)),
                status=CIAppPipelineEventPipelineStatus.SUCCESS,
                partial_retry=False,
                git=CIAppGitInfo(
                    repository_url="https://github.com/DataDog/datadog-agent",
                    sha="7f263865994b76066c4612fd1965215e7dcb4cd2",
                    author_email="john.doe@email.com",
                ),
            ),
        ),
        type=CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST,
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.create_ci_app_pipeline_event(body=body)

    print(response)
"""
Send running pipeline event returns "Request accepted for processing" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request import CIAppCreatePipelineEventRequest
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_attributes import (
    CIAppCreatePipelineEventRequestAttributes,
)
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data import CIAppCreatePipelineEventRequestData
from datadog_api_client.v2.model.ci_app_create_pipeline_event_request_data_type import (
    CIAppCreatePipelineEventRequestDataType,
)
from datadog_api_client.v2.model.ci_app_git_info import CIAppGitInfo
from datadog_api_client.v2.model.ci_app_pipeline_event_in_progress_pipeline import CIAppPipelineEventInProgressPipeline
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_in_progress_status import (
    CIAppPipelineEventPipelineInProgressStatus,
)
from datadog_api_client.v2.model.ci_app_pipeline_event_pipeline_level import CIAppPipelineEventPipelineLevel

body = CIAppCreatePipelineEventRequest(
    data=CIAppCreatePipelineEventRequestData(
        attributes=CIAppCreatePipelineEventRequestAttributes(
            resource=CIAppPipelineEventInProgressPipeline(
                level=CIAppPipelineEventPipelineLevel.PIPELINE,
                unique_id="3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
                name="Deploy to AWS",
                url="https://my-ci-provider.example/pipelines/my-pipeline/run/1",
                start=(datetime.now() + relativedelta(seconds=-120)),
                status=CIAppPipelineEventPipelineInProgressStatus.RUNNING,
                partial_retry=False,
                git=CIAppGitInfo(
                    repository_url="https://github.com/DataDog/datadog-agent",
                    sha="7f263865994b76066c4612fd1965215e7dcb4cd2",
                    author_email="john.doe@email.com",
                ),
            ),
        ),
        type=CIAppCreatePipelineEventRequestDataType.CIPIPELINE_RESOURCE_REQUEST,
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.create_ci_app_pipeline_event(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" python3 "example.py"
# Send pipeline event returns "Request accepted for processing" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppCreatePipelineEventRequest.new({
  data: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestData.new({
    attributes: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestAttributes.new({
      resource: DatadogAPIClient::V2::CIAppPipelineEventFinishedPipeline.new({
        level: DatadogAPIClient::V2::CIAppPipelineEventPipelineLevel::PIPELINE,
        unique_id: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        name: "Deploy to AWS",
        url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        start: (Time.now + -120),
        _end: (Time.now + -30),
        status: DatadogAPIClient::V2::CIAppPipelineEventPipelineStatus::SUCCESS,
        partial_retry: false,
        git: DatadogAPIClient::V2::CIAppGitInfo.new({
          repository_url: "https://github.com/DataDog/datadog-agent",
          sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
          author_email: "john.doe@email.com",
        }),
      }),
    }),
    type: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST,
  }),
})
p api_instance.create_ci_app_pipeline_event(body)
# Send pipeline event with custom provider returns "Request accepted for processing" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppCreatePipelineEventRequest.new({
  data: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestData.new({
    attributes: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestAttributes.new({
      provider_name: "example-provider",
      resource: DatadogAPIClient::V2::CIAppPipelineEventFinishedPipeline.new({
        level: DatadogAPIClient::V2::CIAppPipelineEventPipelineLevel::PIPELINE,
        unique_id: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        name: "Deploy to AWS",
        url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        start: (Time.now + -120),
        _end: (Time.now + -30),
        status: DatadogAPIClient::V2::CIAppPipelineEventPipelineStatus::SUCCESS,
        partial_retry: false,
        git: DatadogAPIClient::V2::CIAppGitInfo.new({
          repository_url: "https://github.com/DataDog/datadog-agent",
          sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
          author_email: "john.doe@email.com",
        }),
      }),
    }),
    type: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST,
  }),
})
p api_instance.create_ci_app_pipeline_event(body)
# Send running pipeline event returns "Request accepted for processing" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppCreatePipelineEventRequest.new({
  data: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestData.new({
    attributes: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestAttributes.new({
      resource: DatadogAPIClient::V2::CIAppPipelineEventInProgressPipeline.new({
        level: DatadogAPIClient::V2::CIAppPipelineEventPipelineLevel::PIPELINE,
        unique_id: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
        name: "Deploy to AWS",
        url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
        start: (Time.now + -120),
        status: DatadogAPIClient::V2::CIAppPipelineEventPipelineInProgressStatus::RUNNING,
        partial_retry: false,
        git: DatadogAPIClient::V2::CIAppGitInfo.new({
          repository_url: "https://github.com/DataDog/datadog-agent",
          sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
          author_email: "john.doe@email.com",
        }),
      }),
    }),
    type: DatadogAPIClient::V2::CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST,
  }),
})
p api_instance.create_ci_app_pipeline_event(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" rb "example.rb"
// Send pipeline event returns "Request accepted for processing" response
use chrono::{DateTime, Utc};
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequest;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributes;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributesResource;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestData;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestDataType;
use datadog_api_client::datadogV2::model::CIAppGitInfo;
use datadog_api_client::datadogV2::model::CIAppPipelineEventFinishedPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineLevel;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineStatus;

#[tokio::main]
async fn main() {
    let body = CIAppCreatePipelineEventRequest::new().data(
        CIAppCreatePipelineEventRequestData::new()
            .attributes(CIAppCreatePipelineEventRequestAttributes::new(
                CIAppCreatePipelineEventRequestAttributesResource::CIAppPipelineEventPipeline(
                    Box::new(
                        CIAppPipelineEventPipeline::CIAppPipelineEventFinishedPipeline(Box::new(
                            CIAppPipelineEventFinishedPipeline::new(
                                DateTime::parse_from_rfc3339("2021-11-11T11:10:41+00:00")
                                    .expect("Failed to parse datetime")
                                    .with_timezone(&Utc),
                                CIAppPipelineEventPipelineLevel::PIPELINE,
                                "Deploy to AWS".to_string(),
                                false,
                                DateTime::parse_from_rfc3339("2021-11-11T11:09:11+00:00")
                                    .expect("Failed to parse datetime")
                                    .with_timezone(&Utc),
                                CIAppPipelineEventPipelineStatus::SUCCESS,
                                "3eacb6f3-ff04-4e10-8a9c-46e6d054024a".to_string(),
                                "https://my-ci-provider.example/pipelines/my-pipeline/run/1"
                                    .to_string(),
                            )
                            .git(Some(CIAppGitInfo::new(
                                "john.doe@email.com".to_string(),
                                "https://github.com/DataDog/datadog-agent".to_string(),
                                "7f263865994b76066c4612fd1965215e7dcb4cd2".to_string(),
                            ))),
                        )),
                    ),
                ),
            ))
            .type_(CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST),
    );
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api.create_ci_app_pipeline_event(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}
// Send pipeline event with custom provider returns "Request accepted for
// processing" response
use chrono::{DateTime, Utc};
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequest;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributes;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributesResource;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestData;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestDataType;
use datadog_api_client::datadogV2::model::CIAppGitInfo;
use datadog_api_client::datadogV2::model::CIAppPipelineEventFinishedPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineLevel;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineStatus;

#[tokio::main]
async fn main() {
    let body =
        CIAppCreatePipelineEventRequest
        ::new().data(
            CIAppCreatePipelineEventRequestData::new()
                .attributes(
                    CIAppCreatePipelineEventRequestAttributes::new(
                        CIAppCreatePipelineEventRequestAttributesResource::CIAppPipelineEventPipeline(
                            Box::new(
                                CIAppPipelineEventPipeline::CIAppPipelineEventFinishedPipeline(
                                    Box::new(
                                        CIAppPipelineEventFinishedPipeline::new(
                                            DateTime::parse_from_rfc3339("2021-11-11T11:10:41+00:00")
                                                .expect("Failed to parse datetime")
                                                .with_timezone(&Utc),
                                            CIAppPipelineEventPipelineLevel::PIPELINE,
                                            "Deploy to AWS".to_string(),
                                            false,
                                            DateTime::parse_from_rfc3339("2021-11-11T11:09:11+00:00")
                                                .expect("Failed to parse datetime")
                                                .with_timezone(&Utc),
                                            CIAppPipelineEventPipelineStatus::SUCCESS,
                                            "3eacb6f3-ff04-4e10-8a9c-46e6d054024a".to_string(),
                                            "https://my-ci-provider.example/pipelines/my-pipeline/run/1".to_string(),
                                        ).git(
                                            Some(
                                                CIAppGitInfo::new(
                                                    "john.doe@email.com".to_string(),
                                                    "https://github.com/DataDog/datadog-agent".to_string(),
                                                    "7f263865994b76066c4612fd1965215e7dcb4cd2".to_string(),
                                                ),
                                            ),
                                        ),
                                    ),
                                ),
                            ),
                        ),
                    ).provider_name("example-provider".to_string()),
                )
                .type_(CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST),
        );
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api.create_ci_app_pipeline_event(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}
// Send running pipeline event returns "Request accepted for processing" response
use chrono::{DateTime, Utc};
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequest;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributes;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestAttributesResource;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestData;
use datadog_api_client::datadogV2::model::CIAppCreatePipelineEventRequestDataType;
use datadog_api_client::datadogV2::model::CIAppGitInfo;
use datadog_api_client::datadogV2::model::CIAppPipelineEventInProgressPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipeline;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineInProgressStatus;
use datadog_api_client::datadogV2::model::CIAppPipelineEventPipelineLevel;

#[tokio::main]
async fn main() {
    let body = CIAppCreatePipelineEventRequest::new().data(
        CIAppCreatePipelineEventRequestData::new()
            .attributes(CIAppCreatePipelineEventRequestAttributes::new(
                CIAppCreatePipelineEventRequestAttributesResource::CIAppPipelineEventPipeline(
                    Box::new(
                        CIAppPipelineEventPipeline::CIAppPipelineEventInProgressPipeline(Box::new(
                            CIAppPipelineEventInProgressPipeline::new(
                                CIAppPipelineEventPipelineLevel::PIPELINE,
                                "Deploy to AWS".to_string(),
                                false,
                                DateTime::parse_from_rfc3339("2021-11-11T11:09:11+00:00")
                                    .expect("Failed to parse datetime")
                                    .with_timezone(&Utc),
                                CIAppPipelineEventPipelineInProgressStatus::RUNNING,
                                "3eacb6f3-ff04-4e10-8a9c-46e6d054024a".to_string(),
                                "https://my-ci-provider.example/pipelines/my-pipeline/run/1"
                                    .to_string(),
                            )
                            .git(Some(CIAppGitInfo::new(
                                "john.doe@email.com".to_string(),
                                "https://github.com/DataDog/datadog-agent".to_string(),
                                "7f263865994b76066c4612fd1965215e7dcb4cd2".to_string(),
                            ))),
                        )),
                    ),
                ),
            ))
            .type_(CIAppCreatePipelineEventRequestDataType::CIPIPELINE_RESOURCE_REQUEST),
    );
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api.create_ci_app_pipeline_event(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" cargo run
/**
 * Send pipeline event returns "Request accepted for processing" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiCreateCIAppPipelineEventRequest = {
  body: {
    data: {
      attributes: {
        resource: {
          level: "pipeline",
          uniqueId: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
          name: "Deploy to AWS",
          url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
          start: new Date(new Date().getTime() + -120 * 1000),
          end: new Date(new Date().getTime() + -30 * 1000),
          status: "success",
          partialRetry: false,
          git: {
            repositoryUrl: "https://github.com/DataDog/datadog-agent",
            sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
            authorEmail: "john.doe@email.com",
          },
        },
      },
      type: "cipipeline_resource_request",
    },
  },
};

apiInstance
  .createCIAppPipelineEvent(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));
/**
 * Send pipeline event with custom provider returns "Request accepted for processing" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiCreateCIAppPipelineEventRequest = {
  body: {
    data: {
      attributes: {
        providerName: "example-provider",
        resource: {
          level: "pipeline",
          uniqueId: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
          name: "Deploy to AWS",
          url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
          start: new Date(new Date().getTime() + -120 * 1000),
          end: new Date(new Date().getTime() + -30 * 1000),
          status: "success",
          partialRetry: false,
          git: {
            repositoryUrl: "https://github.com/DataDog/datadog-agent",
            sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
            authorEmail: "john.doe@email.com",
          },
        },
      },
      type: "cipipeline_resource_request",
    },
  },
};

apiInstance
  .createCIAppPipelineEvent(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));
/**
 * Send running pipeline event returns "Request accepted for processing" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiCreateCIAppPipelineEventRequest = {
  body: {
    data: {
      attributes: {
        resource: {
          level: "pipeline",
          uniqueId: "3eacb6f3-ff04-4e10-8a9c-46e6d054024a",
          name: "Deploy to AWS",
          url: "https://my-ci-provider.example/pipelines/my-pipeline/run/1",
          start: new Date(new Date().getTime() + -120 * 1000),
          status: "running",
          partialRetry: false,
          git: {
            repositoryUrl: "https://github.com/DataDog/datadog-agent",
            sha: "7f263865994b76066c4612fd1965215e7dcb4cd2",
            authorEmail: "john.doe@email.com",
          },
        },
      },
      type: "cipipeline_resource_request",
    },
  },
};

apiInstance
  .createCIAppPipelineEvent(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/ci/pipelines/eventshttps://api.datadoghq.eu/api/v2/ci/pipelines/eventshttps://api.ddog-gov.com/api/v2/ci/pipelines/eventshttps://api.datadoghq.com/api/v2/ci/pipelines/eventshttps://api.us3.datadoghq.com/api/v2/ci/pipelines/eventshttps://api.us5.datadoghq.com/api/v2/ci/pipelines/events

개요

List endpoint returns CI Visibility pipeline events that match a search query. Results are paginated similarly to logs.

Use this endpoint to see your latest pipeline events.

This endpoint requires the ci_visibility_read permission.

OAuth apps require the ci_visibility_read authorization scope to access this endpoint.

인수

쿼리 문자열

이름

유형

설명

filter[query]

string

Search query following log syntax.

filter[from]

string

Minimum timestamp for requested events.

filter[to]

string

Maximum timestamp for requested events.

sort

enum

Order of events in results.
Allowed enum values: timestamp, -timestamp

page[cursor]

string

List following results with a cursor provided in the previous query.

page[limit]

integer

Maximum number of events in the response.

응답

OK

Response object with all pipeline events matching the request and pagination information.

Expand All

항목

유형

설명

data

[object]

Array of events matching the request.

attributes

object

JSON object containing all event attributes and their associated values.

attributes

object

JSON object of attributes from CI Visibility pipeline events.

ci_level

enum

Pipeline execution level. Allowed enum values: pipeline,stage,job,step,custom

tags

[string]

Array of tags associated with your event.

id

string

Unique ID of the event.

type

enum

Type of the event. Allowed enum values: cipipeline

links

object

Links attributes.

next

string

Link for the next set of results. The request can also be made using the POST endpoint.

meta

object

The metadata associated with a request.

elapsed

int64

The time elapsed in milliseconds.

page

object

Paging attributes.

after

string

The cursor to use to get the next results, if any. To make the next request, use the same parameters with the addition of page[cursor].

request_id

string

The identifier of the request.

status

enum

The status of the response. Allowed enum values: done,timeout

warnings

[object]

A list of warnings (non-fatal errors) encountered. Partial results may return if warnings are present in the response.

code

string

A unique code for this type of warning.

detail

string

A detailed explanation of this specific warning.

title

string

A short human-readable summary of the warning.

{
  "data": [
    {
      "attributes": {
        "attributes": {
          "customAttribute": 123,
          "duration": 2345
        },
        "ci_level": "pipeline",
        "tags": [
          "team:A"
        ]
      },
      "id": "AAAAAWgN8Xwgr1vKDQAAAABBV2dOOFh3ZzZobm1mWXJFYTR0OA",
      "type": "cipipeline"
    }
  ],
  "links": {
    "next": "https://app.datadoghq.com/api/v2/ci/tests/events?filter[query]=foo\u0026page[cursor]=eyJzdGFydEF0IjoiQVFBQUFYS2tMS3pPbm40NGV3QUFBQUJCV0V0clRFdDZVbG8zY3pCRmNsbHJiVmxDWlEifQ=="
  },
  "meta": {
    "elapsed": 132,
    "page": {
      "after": "eyJzdGFydEF0IjoiQVFBQUFYS2tMS3pPbm40NGV3QUFBQUJCV0V0clRFdDZVbG8zY3pCRmNsbHJiVmxDWlEifQ=="
    },
    "request_id": "MWlFUjVaWGZTTTZPYzM0VXp1OXU2d3xLSVpEMjZKQ0VKUTI0dEYtM3RSOFVR",
    "status": "done",
    "warnings": [
      {
        "code": "unknown_index",
        "detail": "indexes: foo, bar",
        "title": "One or several indexes are missing or invalid, results hold data from the other indexes"
      }
    ]
  }
}

Bad Request

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipelines/events" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get a list of pipelines events returns "OK" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.list_ci_app_pipeline_events(
        filter_query="@ci.provider.name:circleci",
        filter_from=(datetime.now() + relativedelta(minutes=-30)),
        filter_to=datetime.now(),
        page_limit=5,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get a list of pipelines events returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new
opts = {
  filter_query: "@ci.provider.name:circleci",
  filter_from: (Time.now + -30 * 60),
  filter_to: Time.now,
  page_limit: 5,
}
p api_instance.list_ci_app_pipeline_events(opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get a list of pipelines events returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.ListCIAppPipelineEvents(ctx, *datadogV2.NewListCIAppPipelineEventsOptionalParameters().WithFilterQuery("@ci.provider.name:circleci").WithFilterFrom(time.Now().Add(time.Minute * -30)).WithFilterTo(time.Now()).WithPageLimit(5))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.ListCIAppPipelineEvents`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.ListCIAppPipelineEvents`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get a list of pipelines events returns "OK" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi.ListCIAppPipelineEventsOptionalParameters;
import com.datadog.api.client.v2.model.CIAppPipelineEventsResponse;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    try {
      CIAppPipelineEventsResponse result =
          apiInstance.listCIAppPipelineEvents(
              new ListCIAppPipelineEventsOptionalParameters()
                  .filterQuery("@ci.provider.name:circleci")
                  .filterFrom(OffsetDateTime.now().plusMinutes(-30))
                  .filterTo(OffsetDateTime.now())
                  .pageLimit(5));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling CiVisibilityPipelinesApi#listCIAppPipelineEvents");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Get a list of pipelines events returns "OK" response
use chrono::{DateTime, Utc};
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::ListCIAppPipelineEventsOptionalParams;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api
        .list_ci_app_pipeline_events(
            ListCIAppPipelineEventsOptionalParams::default()
                .filter_query("@ci.provider.name:circleci".to_string())
                .filter_from(
                    DateTime::parse_from_rfc3339("2021-11-11T10:41:11+00:00")
                        .expect("Failed to parse datetime")
                        .with_timezone(&Utc),
                )
                .filter_to(
                    DateTime::parse_from_rfc3339("2021-11-11T11:11:11+00:00")
                        .expect("Failed to parse datetime")
                        .with_timezone(&Utc),
                )
                .page_limit(5),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get a list of pipelines events returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiListCIAppPipelineEventsRequest = {
  filterQuery: "@ci.provider.name:circleci",
  filterFrom: new Date(new Date().getTime() + -30 * 60 * 1000),
  filterTo: new Date(),
  pageLimit: 5,
};

apiInstance
  .listCIAppPipelineEvents(params)
  .then((data: v2.CIAppPipelineEventsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/ci/pipelines/events/searchhttps://api.datadoghq.eu/api/v2/ci/pipelines/events/searchhttps://api.ddog-gov.com/api/v2/ci/pipelines/events/searchhttps://api.datadoghq.com/api/v2/ci/pipelines/events/searchhttps://api.us3.datadoghq.com/api/v2/ci/pipelines/events/searchhttps://api.us5.datadoghq.com/api/v2/ci/pipelines/events/search

개요

List endpoint returns CI Visibility pipeline events that match a search query. Results are paginated similarly to logs.

Use this endpoint to build complex events filtering and search.

This endpoint requires the ci_visibility_read permission.

OAuth apps require the ci_visibility_read authorization scope to access this endpoint.

요청

Body Data

Expand All

항목

유형

설명

filter

object

The search and filter query settings.

from

string

The minimum time for the requested events; supports date, math, and regular timestamps (in milliseconds).

default: now-15m

query

string

The search query following the CI Visibility Explorer search syntax.

default: *

to

string

The maximum time for the requested events, supports date, math, and regular timestamps (in milliseconds).

default: now

options

object

Global query options that are used during the query. Only supply timezone or time offset, not both. Otherwise, the query fails.

time_offset

int64

The time offset (in seconds) to apply to the query.

timezone

string

The timezone can be specified as GMT, UTC, an offset from UTC (like UTC+1), or as a Timezone Database identifier (like America/New_York).

default: UTC

page

object

Paging attributes for listing events.

cursor

string

List following results with a cursor provided in the previous query.

limit

int32

Maximum number of events in the response.

default: 10

sort

enum

Sort parameters when querying events. Allowed enum values: timestamp,-timestamp

{
  "filter": {
    "from": "now-15m",
    "query": "@ci.provider.name:github AND @ci.status:error",
    "to": "now"
  },
  "options": {
    "timezone": "GMT"
  },
  "page": {
    "limit": 5
  },
  "sort": "timestamp"
}
{
  "filter": {
    "from": "now-30s",
    "to": "now"
  },
  "options": {
    "timezone": "GMT"
  },
  "page": {
    "limit": 2
  },
  "sort": "timestamp"
}

응답

OK

Response object with all pipeline events matching the request and pagination information.

Expand All

항목

유형

설명

data

[object]

Array of events matching the request.

attributes

object

JSON object containing all event attributes and their associated values.

attributes

object

JSON object of attributes from CI Visibility pipeline events.

ci_level

enum

Pipeline execution level. Allowed enum values: pipeline,stage,job,step,custom

tags

[string]

Array of tags associated with your event.

id

string

Unique ID of the event.

type

enum

Type of the event. Allowed enum values: cipipeline

links

object

Links attributes.

next

string

Link for the next set of results. The request can also be made using the POST endpoint.

meta

object

The metadata associated with a request.

elapsed

int64

The time elapsed in milliseconds.

page

object

Paging attributes.

after

string

The cursor to use to get the next results, if any. To make the next request, use the same parameters with the addition of page[cursor].

request_id

string

The identifier of the request.

status

enum

The status of the response. Allowed enum values: done,timeout

warnings

[object]

A list of warnings (non-fatal errors) encountered. Partial results may return if warnings are present in the response.

code

string

A unique code for this type of warning.

detail

string

A detailed explanation of this specific warning.

title

string

A short human-readable summary of the warning.

{
  "data": [
    {
      "attributes": {
        "attributes": {
          "customAttribute": 123,
          "duration": 2345
        },
        "ci_level": "pipeline",
        "tags": [
          "team:A"
        ]
      },
      "id": "AAAAAWgN8Xwgr1vKDQAAAABBV2dOOFh3ZzZobm1mWXJFYTR0OA",
      "type": "cipipeline"
    }
  ],
  "links": {
    "next": "https://app.datadoghq.com/api/v2/ci/tests/events?filter[query]=foo\u0026page[cursor]=eyJzdGFydEF0IjoiQVFBQUFYS2tMS3pPbm40NGV3QUFBQUJCV0V0clRFdDZVbG8zY3pCRmNsbHJiVmxDWlEifQ=="
  },
  "meta": {
    "elapsed": 132,
    "page": {
      "after": "eyJzdGFydEF0IjoiQVFBQUFYS2tMS3pPbm40NGV3QUFBQUJCV0V0clRFdDZVbG8zY3pCRmNsbHJiVmxDWlEifQ=="
    },
    "request_id": "MWlFUjVaWGZTTTZPYzM0VXp1OXU2d3xLSVpEMjZKQ0VKUTI0dEYtM3RSOFVR",
    "status": "done",
    "warnings": [
      {
        "code": "unknown_index",
        "detail": "indexes: foo, bar",
        "title": "One or several indexes are missing or invalid, results hold data from the other indexes"
      }
    ]
  }
}

Bad Request

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipelines/events/search" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "filter": { "from": "now-15m", "query": "@ci.provider.name:github AND @ci.status:error", "to": "now" }, "options": { "timezone": "GMT" }, "page": { "limit": 5 }, "sort": "timestamp" } EOF
                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipelines/events/search" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "filter": { "from": "now-30s", "to": "now" }, "options": { "timezone": "GMT" }, "page": { "limit": 2 }, "sort": "timestamp" } EOF
// Search pipelines events returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppPipelineEventsRequest{
		Filter: &datadogV2.CIAppPipelinesQueryFilter{
			From:  datadog.PtrString("now-15m"),
			Query: datadog.PtrString("@ci.provider.name:github AND @ci.status:error"),
			To:    datadog.PtrString("now"),
		},
		Options: &datadogV2.CIAppQueryOptions{
			Timezone: datadog.PtrString("GMT"),
		},
		Page: &datadogV2.CIAppQueryPageOptions{
			Limit: datadog.PtrInt32(5),
		},
		Sort: datadogV2.CIAPPSORT_TIMESTAMP_ASCENDING.Ptr(),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.SearchCIAppPipelineEvents(ctx, *datadogV2.NewSearchCIAppPipelineEventsOptionalParameters().WithBody(body))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.SearchCIAppPipelineEvents`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.SearchCIAppPipelineEvents`:\n%s\n", responseContent)
}
// Search pipelines events returns "OK" response with pagination

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppPipelineEventsRequest{
		Filter: &datadogV2.CIAppPipelinesQueryFilter{
			From: datadog.PtrString("now-30s"),
			To:   datadog.PtrString("now"),
		},
		Options: &datadogV2.CIAppQueryOptions{
			Timezone: datadog.PtrString("GMT"),
		},
		Page: &datadogV2.CIAppQueryPageOptions{
			Limit: datadog.PtrInt32(2),
		},
		Sort: datadogV2.CIAPPSORT_TIMESTAMP_ASCENDING.Ptr(),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, _ := api.SearchCIAppPipelineEventsWithPagination(ctx, *datadogV2.NewSearchCIAppPipelineEventsOptionalParameters().WithBody(body))

	for paginationResult := range resp {
		if paginationResult.Error != nil {
			fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.SearchCIAppPipelineEvents`: %v\n", paginationResult.Error)
		}
		responseContent, _ := json.MarshalIndent(paginationResult.Item, "", "  ")
		fmt.Fprintf(os.Stdout, "%s\n", responseContent)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Search pipelines events returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi.SearchCIAppPipelineEventsOptionalParameters;
import com.datadog.api.client.v2.model.CIAppPipelineEventsRequest;
import com.datadog.api.client.v2.model.CIAppPipelineEventsResponse;
import com.datadog.api.client.v2.model.CIAppPipelinesQueryFilter;
import com.datadog.api.client.v2.model.CIAppQueryOptions;
import com.datadog.api.client.v2.model.CIAppQueryPageOptions;
import com.datadog.api.client.v2.model.CIAppSort;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppPipelineEventsRequest body =
        new CIAppPipelineEventsRequest()
            .filter(
                new CIAppPipelinesQueryFilter()
                    .from("now-15m")
                    .query("@ci.provider.name:github AND @ci.status:error")
                    .to("now"))
            .options(new CIAppQueryOptions().timezone("GMT"))
            .page(new CIAppQueryPageOptions().limit(5))
            .sort(CIAppSort.TIMESTAMP_ASCENDING);

    try {
      CIAppPipelineEventsResponse result =
          apiInstance.searchCIAppPipelineEvents(
              new SearchCIAppPipelineEventsOptionalParameters().body(body));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling CiVisibilityPipelinesApi#searchCIAppPipelineEvents");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}
// Search pipelines events returns "OK" response with pagination

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.PaginationIterable;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi.SearchCIAppPipelineEventsOptionalParameters;
import com.datadog.api.client.v2.model.CIAppPipelineEvent;
import com.datadog.api.client.v2.model.CIAppPipelineEventsRequest;
import com.datadog.api.client.v2.model.CIAppPipelinesQueryFilter;
import com.datadog.api.client.v2.model.CIAppQueryOptions;
import com.datadog.api.client.v2.model.CIAppQueryPageOptions;
import com.datadog.api.client.v2.model.CIAppSort;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppPipelineEventsRequest body =
        new CIAppPipelineEventsRequest()
            .filter(new CIAppPipelinesQueryFilter().from("now-30s").to("now"))
            .options(new CIAppQueryOptions().timezone("GMT"))
            .page(new CIAppQueryPageOptions().limit(2))
            .sort(CIAppSort.TIMESTAMP_ASCENDING);

    try {
      PaginationIterable<CIAppPipelineEvent> iterable =
          apiInstance.searchCIAppPipelineEventsWithPagination(
              new SearchCIAppPipelineEventsOptionalParameters().body(body));

      for (CIAppPipelineEvent item : iterable) {
        System.out.println(item);
      }
    } catch (RuntimeException e) {
      System.err.println(
          "Exception when calling"
              + " CiVisibilityPipelinesApi#searchCIAppPipelineEventsWithPagination");
      System.err.println("Reason: " + e.getMessage());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
"""
Search pipelines events returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_pipeline_events_request import CIAppPipelineEventsRequest
from datadog_api_client.v2.model.ci_app_pipelines_query_filter import CIAppPipelinesQueryFilter
from datadog_api_client.v2.model.ci_app_query_options import CIAppQueryOptions
from datadog_api_client.v2.model.ci_app_query_page_options import CIAppQueryPageOptions
from datadog_api_client.v2.model.ci_app_sort import CIAppSort

body = CIAppPipelineEventsRequest(
    filter=CIAppPipelinesQueryFilter(
        _from="now-15m",
        query="@ci.provider.name:github AND @ci.status:error",
        to="now",
    ),
    options=CIAppQueryOptions(
        timezone="GMT",
    ),
    page=CIAppQueryPageOptions(
        limit=5,
    ),
    sort=CIAppSort.TIMESTAMP_ASCENDING,
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.search_ci_app_pipeline_events(body=body)

    print(response)
"""
Search pipelines events returns "OK" response with pagination
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_pipeline_events_request import CIAppPipelineEventsRequest
from datadog_api_client.v2.model.ci_app_pipelines_query_filter import CIAppPipelinesQueryFilter
from datadog_api_client.v2.model.ci_app_query_options import CIAppQueryOptions
from datadog_api_client.v2.model.ci_app_query_page_options import CIAppQueryPageOptions
from datadog_api_client.v2.model.ci_app_sort import CIAppSort

body = CIAppPipelineEventsRequest(
    filter=CIAppPipelinesQueryFilter(
        _from="now-30s",
        to="now",
    ),
    options=CIAppQueryOptions(
        timezone="GMT",
    ),
    page=CIAppQueryPageOptions(
        limit=2,
    ),
    sort=CIAppSort.TIMESTAMP_ASCENDING,
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    items = api_instance.search_ci_app_pipeline_events_with_pagination(body=body)
    for item in items:
        print(item)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Search pipelines events returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppPipelineEventsRequest.new({
  filter: DatadogAPIClient::V2::CIAppPipelinesQueryFilter.new({
    from: "now-15m",
    query: "@ci.provider.name:github AND @ci.status:error",
    to: "now",
  }),
  options: DatadogAPIClient::V2::CIAppQueryOptions.new({
    timezone: "GMT",
  }),
  page: DatadogAPIClient::V2::CIAppQueryPageOptions.new({
    limit: 5,
  }),
  sort: DatadogAPIClient::V2::CIAppSort::TIMESTAMP_ASCENDING,
})
opts = {
  body: body,
}
p api_instance.search_ci_app_pipeline_events(opts)
# Search pipelines events returns "OK" response with pagination

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppPipelineEventsRequest.new({
  filter: DatadogAPIClient::V2::CIAppPipelinesQueryFilter.new({
    from: "now-30s",
    to: "now",
  }),
  options: DatadogAPIClient::V2::CIAppQueryOptions.new({
    timezone: "GMT",
  }),
  page: DatadogAPIClient::V2::CIAppQueryPageOptions.new({
    limit: 2,
  }),
  sort: DatadogAPIClient::V2::CIAppSort::TIMESTAMP_ASCENDING,
})
opts = {
  body: body,
}
api_instance.search_ci_app_pipeline_events_with_pagination(opts) { |item| puts item }

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Search pipelines events returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::SearchCIAppPipelineEventsOptionalParams;
use datadog_api_client::datadogV2::model::CIAppPipelineEventsRequest;
use datadog_api_client::datadogV2::model::CIAppPipelinesQueryFilter;
use datadog_api_client::datadogV2::model::CIAppQueryOptions;
use datadog_api_client::datadogV2::model::CIAppQueryPageOptions;
use datadog_api_client::datadogV2::model::CIAppSort;

#[tokio::main]
async fn main() {
    let body = CIAppPipelineEventsRequest::new()
        .filter(
            CIAppPipelinesQueryFilter::new()
                .from("now-15m".to_string())
                .query("@ci.provider.name:github AND @ci.status:error".to_string())
                .to("now".to_string()),
        )
        .options(CIAppQueryOptions::new().timezone("GMT".to_string()))
        .page(CIAppQueryPageOptions::new().limit(5))
        .sort(CIAppSort::TIMESTAMP_ASCENDING);
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api
        .search_ci_app_pipeline_events(
            SearchCIAppPipelineEventsOptionalParams::default().body(body),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}
// Search pipelines events returns "OK" response with pagination
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::SearchCIAppPipelineEventsOptionalParams;
use datadog_api_client::datadogV2::model::CIAppPipelineEventsRequest;
use datadog_api_client::datadogV2::model::CIAppPipelinesQueryFilter;
use datadog_api_client::datadogV2::model::CIAppQueryOptions;
use datadog_api_client::datadogV2::model::CIAppQueryPageOptions;
use datadog_api_client::datadogV2::model::CIAppSort;
use futures_util::pin_mut;
use futures_util::stream::StreamExt;

#[tokio::main]
async fn main() {
    let body = CIAppPipelineEventsRequest::new()
        .filter(
            CIAppPipelinesQueryFilter::new()
                .from("now-30s".to_string())
                .to("now".to_string()),
        )
        .options(CIAppQueryOptions::new().timezone("GMT".to_string()))
        .page(CIAppQueryPageOptions::new().limit(2))
        .sort(CIAppSort::TIMESTAMP_ASCENDING);
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let response = api.search_ci_app_pipeline_events_with_pagination(
        SearchCIAppPipelineEventsOptionalParams::default().body(body),
    );
    pin_mut!(response);
    while let Some(resp) = response.next().await {
        if let Ok(value) = resp {
            println!("{:#?}", value);
        } else {
            println!("{:#?}", resp.unwrap_err());
        }
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Search pipelines events returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiSearchCIAppPipelineEventsRequest = {
  body: {
    filter: {
      from: "now-15m",
      query: "@ci.provider.name:github AND @ci.status:error",
      to: "now",
    },
    options: {
      timezone: "GMT",
    },
    page: {
      limit: 5,
    },
    sort: "timestamp",
  },
};

apiInstance
  .searchCIAppPipelineEvents(params)
  .then((data: v2.CIAppPipelineEventsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));
/**
 * Search pipelines events returns "OK" response with pagination
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiSearchCIAppPipelineEventsRequest = {
  body: {
    filter: {
      from: "now-30s",
      to: "now",
    },
    options: {
      timezone: "GMT",
    },
    page: {
      limit: 2,
    },
    sort: "timestamp",
  },
};

(async () => {
  try {
    for await (const item of apiInstance.searchCIAppPipelineEventsWithPagination(
      params
    )) {
      console.log(item);
    }
  } catch (error) {
    console.error(error);
  }
})();

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/ci/pipelines/analytics/aggregatehttps://api.datadoghq.eu/api/v2/ci/pipelines/analytics/aggregatehttps://api.ddog-gov.com/api/v2/ci/pipelines/analytics/aggregatehttps://api.datadoghq.com/api/v2/ci/pipelines/analytics/aggregatehttps://api.us3.datadoghq.com/api/v2/ci/pipelines/analytics/aggregatehttps://api.us5.datadoghq.com/api/v2/ci/pipelines/analytics/aggregate

개요

Use this API endpoint to aggregate CI Visibility pipeline events into buckets of computed metrics and timeseries. This endpoint requires the ci_visibility_read permission.

OAuth apps require the ci_visibility_read authorization scope to access this endpoint.

요청

Body Data (required)

Expand All

항목

유형

설명

compute

[object]

The list of metrics or timeseries to compute for the retrieved buckets.

aggregation [required]

enum

An aggregation function. Allowed enum values: count,cardinality,pc75,pc90,pc95,pc98,pc99,sum,min,max,avg,median,latest,earliest,most_frequent,delta

interval

string

The time buckets' size (only used for type=timeseries) Defaults to a resolution of 150 points.

metric

string

The metric to use.

type

enum

The type of compute. Allowed enum values: timeseries,total

default: total

filter

object

The search and filter query settings.

from

string

The minimum time for the requested events; supports date, math, and regular timestamps (in milliseconds).

default: now-15m

query

string

The search query following the CI Visibility Explorer search syntax.

default: *

to

string

The maximum time for the requested events, supports date, math, and regular timestamps (in milliseconds).

default: now

group_by

[object]

The rules for the group-by.

facet [required]

string

The name of the facet to use (required).

histogram

object

Used to perform a histogram computation (only for measure facets). At most, 100 buckets are allowed, the number of buckets is (max - min)/interval.

interval [required]

double

The bin size of the histogram buckets.

max [required]

double

The maximum value for the measure used in the histogram (values greater than this one are filtered out).

min [required]

double

The minimum value for the measure used in the histogram (values smaller than this one are filtered out).

limit

int64

The maximum buckets to return for this group-by.

default: 10

missing

 <oneOf>

The value to use for logs that don't have the facet used to group-by.

Option 1

string

The missing value to use if there is a string valued facet.

Option 2

double

The missing value to use if there is a number valued facet.

sort

object

A sort rule. The aggregation field is required when type is measure.

aggregation

enum

An aggregation function. Allowed enum values: count,cardinality,pc75,pc90,pc95,pc98,pc99,sum,min,max,avg,median,latest,earliest,most_frequent,delta

metric

string

The metric to sort by (only used for type=measure).

order

enum

The order to use, ascending or descending. Allowed enum values: asc,desc

type

enum

The type of sorting algorithm. Allowed enum values: alphabetical,measure

default: alphabetical

total

 <oneOf>

A resulting object to put the given computes in over all the matching records.

Option 1

boolean

If set to true, creates an additional bucket labeled "$facet_total".

Option 2

string

A string to use as the key value for the total bucket.

Option 3

double

A number to use as the key value for the total bucket.

options

object

Global query options that are used during the query. Only supply timezone or time offset, not both. Otherwise, the query fails.

time_offset

int64

The time offset (in seconds) to apply to the query.

timezone

string

The timezone can be specified as GMT, UTC, an offset from UTC (like UTC+1), or as a Timezone Database identifier (like America/New_York).

default: UTC

{
  "compute": [
    {
      "aggregation": "pc90",
      "metric": "@duration",
      "type": "total"
    }
  ],
  "filter": {
    "from": "now-15m",
    "query": "@ci.provider.name:(gitlab OR github)",
    "to": "now"
  },
  "group_by": [
    {
      "facet": "@ci.status",
      "limit": 10,
      "total": false
    }
  ],
  "options": {
    "timezone": "GMT"
  }
}

응답

OK

The response object for the pipeline events aggregate API endpoint.

Expand All

항목

유형

설명

data

object

The query results.

buckets

[object]

The list of matching buckets, one item per bucket.

by

object

The key-value pairs for each group-by.

<any-key>

The values for each group-by.

computes

object

A map of the metric name to value for regular compute, or a list of values for a timeseries.

<any-key>

 <oneOf>

A bucket value, can either be a timeseries or a single value.

Option 1

string

A single string value.

Option 2

double

A single number value.

Option 3

[object]

A timeseries array.

time

date-time

The time value for this point.

value

double

The value for this point.

links

object

Links attributes.

next

string

Link for the next set of results. The request can also be made using the POST endpoint.

meta

object

The metadata associated with a request.

elapsed

int64

The time elapsed in milliseconds.

request_id

string

The identifier of the request.

status

enum

The status of the response. Allowed enum values: done,timeout

warnings

[object]

A list of warnings (non-fatal errors) encountered. Partial results may return if warnings are present in the response.

code

string

A unique code for this type of warning.

detail

string

A detailed explanation of this specific warning.

title

string

A short human-readable summary of the warning.

{
  "data": {
    "buckets": [
      {
        "by": {
          "<any-key>": "undefined"
        },
        "computes": {
          "<any-key>": {
            "description": "undefined",
            "type": "undefined"
          }
        }
      }
    ]
  },
  "links": {
    "next": "https://app.datadoghq.com/api/v2/ci/tests/events?filter[query]=foo\u0026page[cursor]=eyJzdGFydEF0IjoiQVFBQUFYS2tMS3pPbm40NGV3QUFBQUJCV0V0clRFdDZVbG8zY3pCRmNsbHJiVmxDWlEifQ=="
  },
  "meta": {
    "elapsed": 132,
    "request_id": "MWlFUjVaWGZTTTZPYzM0VXp1OXU2d3xLSVpEMjZKQ0VKUTI0dEYtM3RSOFVR",
    "status": "done",
    "warnings": [
      {
        "code": "unknown_index",
        "detail": "indexes: foo, bar",
        "title": "One or several indexes are missing or invalid, results hold data from the other indexes"
      }
    ]
  }
}

Bad Request

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ci/pipelines/analytics/aggregate" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "compute": [ { "aggregation": "pc90", "metric": "@duration", "type": "total" } ], "filter": { "from": "now-15m", "query": "@ci.provider.name:(gitlab OR github)", "to": "now" }, "group_by": [ { "facet": "@ci.status", "limit": 10, "total": false } ], "options": { "timezone": "GMT" } } EOF
// Aggregate pipelines events returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.CIAppPipelinesAggregateRequest{
		Compute: []datadogV2.CIAppCompute{
			{
				Aggregation: datadogV2.CIAPPAGGREGATIONFUNCTION_PERCENTILE_90,
				Metric:      datadog.PtrString("@duration"),
				Type:        datadogV2.CIAPPCOMPUTETYPE_TOTAL.Ptr(),
			},
		},
		Filter: &datadogV2.CIAppPipelinesQueryFilter{
			From:  datadog.PtrString("now-15m"),
			Query: datadog.PtrString("@ci.provider.name:(gitlab OR github)"),
			To:    datadog.PtrString("now"),
		},
		GroupBy: []datadogV2.CIAppPipelinesGroupBy{
			{
				Facet: "@ci.status",
				Limit: datadog.PtrInt64(10),
				Total: &datadogV2.CIAppGroupByTotal{
					CIAppGroupByTotalBoolean: datadog.PtrBool(false)},
			},
		},
		Options: &datadogV2.CIAppQueryOptions{
			Timezone: datadog.PtrString("GMT"),
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewCIVisibilityPipelinesApi(apiClient)
	resp, r, err := api.AggregateCIAppPipelineEvents(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `CIVisibilityPipelinesApi.AggregateCIAppPipelineEvents`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `CIVisibilityPipelinesApi.AggregateCIAppPipelineEvents`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Aggregate pipelines events returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.CiVisibilityPipelinesApi;
import com.datadog.api.client.v2.model.CIAppAggregationFunction;
import com.datadog.api.client.v2.model.CIAppCompute;
import com.datadog.api.client.v2.model.CIAppComputeType;
import com.datadog.api.client.v2.model.CIAppGroupByTotal;
import com.datadog.api.client.v2.model.CIAppPipelinesAggregateRequest;
import com.datadog.api.client.v2.model.CIAppPipelinesAnalyticsAggregateResponse;
import com.datadog.api.client.v2.model.CIAppPipelinesGroupBy;
import com.datadog.api.client.v2.model.CIAppPipelinesQueryFilter;
import com.datadog.api.client.v2.model.CIAppQueryOptions;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    CiVisibilityPipelinesApi apiInstance = new CiVisibilityPipelinesApi(defaultClient);

    CIAppPipelinesAggregateRequest body =
        new CIAppPipelinesAggregateRequest()
            .compute(
                Collections.singletonList(
                    new CIAppCompute()
                        .aggregation(CIAppAggregationFunction.PERCENTILE_90)
                        .metric("@duration")
                        .type(CIAppComputeType.TOTAL)))
            .filter(
                new CIAppPipelinesQueryFilter()
                    .from("now-15m")
                    .query("@ci.provider.name:(gitlab OR github)")
                    .to("now"))
            .groupBy(
                Collections.singletonList(
                    new CIAppPipelinesGroupBy()
                        .facet("@ci.status")
                        .limit(10L)
                        .total(new CIAppGroupByTotal(false))))
            .options(new CIAppQueryOptions().timezone("GMT"));

    try {
      CIAppPipelinesAnalyticsAggregateResponse result =
          apiInstance.aggregateCIAppPipelineEvents(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling CiVisibilityPipelinesApi#aggregateCIAppPipelineEvents");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
"""
Aggregate pipelines events returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.ci_visibility_pipelines_api import CIVisibilityPipelinesApi
from datadog_api_client.v2.model.ci_app_aggregation_function import CIAppAggregationFunction
from datadog_api_client.v2.model.ci_app_compute import CIAppCompute
from datadog_api_client.v2.model.ci_app_compute_type import CIAppComputeType
from datadog_api_client.v2.model.ci_app_pipelines_aggregate_request import CIAppPipelinesAggregateRequest
from datadog_api_client.v2.model.ci_app_pipelines_group_by import CIAppPipelinesGroupBy
from datadog_api_client.v2.model.ci_app_pipelines_query_filter import CIAppPipelinesQueryFilter
from datadog_api_client.v2.model.ci_app_query_options import CIAppQueryOptions

body = CIAppPipelinesAggregateRequest(
    compute=[
        CIAppCompute(
            aggregation=CIAppAggregationFunction.PERCENTILE_90,
            metric="@duration",
            type=CIAppComputeType.TOTAL,
        ),
    ],
    filter=CIAppPipelinesQueryFilter(
        _from="now-15m",
        query="@ci.provider.name:(gitlab OR github)",
        to="now",
    ),
    group_by=[
        CIAppPipelinesGroupBy(
            facet="@ci.status",
            limit=10,
            total=False,
        ),
    ],
    options=CIAppQueryOptions(
        timezone="GMT",
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = CIVisibilityPipelinesApi(api_client)
    response = api_instance.aggregate_ci_app_pipeline_events(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Aggregate pipelines events returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::CIVisibilityPipelinesAPI.new

body = DatadogAPIClient::V2::CIAppPipelinesAggregateRequest.new({
  compute: [
    DatadogAPIClient::V2::CIAppCompute.new({
      aggregation: DatadogAPIClient::V2::CIAppAggregationFunction::PERCENTILE_90,
      metric: "@duration",
      type: DatadogAPIClient::V2::CIAppComputeType::TOTAL,
    }),
  ],
  filter: DatadogAPIClient::V2::CIAppPipelinesQueryFilter.new({
    from: "now-15m",
    query: "@ci.provider.name:(gitlab OR github)",
    to: "now",
  }),
  group_by: [
    DatadogAPIClient::V2::CIAppPipelinesGroupBy.new({
      facet: "@ci.status",
      limit: 10,
      total: false,
    }),
  ],
  options: DatadogAPIClient::V2::CIAppQueryOptions.new({
    timezone: "GMT",
  }),
})
p api_instance.aggregate_ci_app_pipeline_events(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Aggregate pipelines events returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_ci_visibility_pipelines::CIVisibilityPipelinesAPI;
use datadog_api_client::datadogV2::model::CIAppAggregationFunction;
use datadog_api_client::datadogV2::model::CIAppCompute;
use datadog_api_client::datadogV2::model::CIAppComputeType;
use datadog_api_client::datadogV2::model::CIAppGroupByTotal;
use datadog_api_client::datadogV2::model::CIAppPipelinesAggregateRequest;
use datadog_api_client::datadogV2::model::CIAppPipelinesGroupBy;
use datadog_api_client::datadogV2::model::CIAppPipelinesQueryFilter;
use datadog_api_client::datadogV2::model::CIAppQueryOptions;

#[tokio::main]
async fn main() {
    let body = CIAppPipelinesAggregateRequest::new()
        .compute(vec![CIAppCompute::new(
            CIAppAggregationFunction::PERCENTILE_90,
        )
        .metric("@duration".to_string())
        .type_(CIAppComputeType::TOTAL)])
        .filter(
            CIAppPipelinesQueryFilter::new()
                .from("now-15m".to_string())
                .query("@ci.provider.name:(gitlab OR github)".to_string())
                .to("now".to_string()),
        )
        .group_by(vec![CIAppPipelinesGroupBy::new("@ci.status".to_string())
            .limit(10)
            .total(CIAppGroupByTotal::CIAppGroupByTotalBoolean(false))])
        .options(CIAppQueryOptions::new().timezone("GMT".to_string()));
    let configuration = datadog::Configuration::new();
    let api = CIVisibilityPipelinesAPI::with_config(configuration);
    let resp = api.aggregate_ci_app_pipeline_events(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Aggregate pipelines events returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.CIVisibilityPipelinesApi(configuration);

const params: v2.CIVisibilityPipelinesApiAggregateCIAppPipelineEventsRequest = {
  body: {
    compute: [
      {
        aggregation: "pc90",
        metric: "@duration",
        type: "total",
      },
    ],
    filter: {
      from: "now-15m",
      query: "@ci.provider.name:(gitlab OR github)",
      to: "now",
    },
    groupBy: [
      {
        facet: "@ci.status",
        limit: 10,
        total: false,
      },
    ],
    options: {
      timezone: "GMT",
    },
  },
};

apiInstance
  .aggregateCIAppPipelineEvents(params)
  .then((data: v2.CIAppPipelinesAnalyticsAggregateResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers