이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

aws_emr_settings

account_id

Type: STRING

block_public_access_configuration

Type: STRUCT
Provider name: BlockPublicAccessConfiguration
Description: A configuration for Amazon EMR block public access. The configuration applies to all clusters created in your account for the current Region. The configuration specifies whether block public access is enabled. If block public access is enabled, security groups associated with the cluster cannot have rules that allow inbound traffic from 0.0.0.0/0 or ::/0 on a port, unless the port is specified as an exception using PermittedPublicSecurityGroupRuleRanges in the BlockPublicAccessConfiguration. By default, Port 22 (SSH) is an exception, and public access is allowed on this port. You can change this by updating the block public access configuration to remove the exception. For accounts that created clusters in a Region before November 25, 2019, block public access is disabled by default in that Region. To use this feature, you must manually enable and configure it. For accounts that did not create an Amazon EMR cluster in a Region before this date, block public access is enabled by default in that Region.

  • block_public_security_group_rules
    Type: BOOLEAN
    Provider name: BlockPublicSecurityGroupRules
    Description: Indicates whether Amazon EMR block public access is enabled (true) or disabled (false). By default, the value is false for accounts that have created Amazon EMR clusters before July 2019. For accounts created after this, the default is true.
  • permitted_public_security_group_rule_ranges
    Type: UNORDERED_LIST_STRUCT
    Provider name: PermittedPublicSecurityGroupRuleRanges
    Description: Specifies ports and port ranges that are permitted to have security group rules that allow inbound traffic from all public sources. For example, if Port 23 (Telnet) is specified for PermittedPublicSecurityGroupRuleRanges, Amazon EMR allows cluster creation if a security group associated with the cluster has a rule that allows inbound traffic on Port 23 from IPv4 0.0.0.0/0 or IPv6 port ::/0 as the source. By default, Port 22, which is used for SSH access to the cluster Amazon EC2 instances, is in the list of PermittedPublicSecurityGroupRuleRanges.
    • max_range
      Type: INT32
      Provider name: MaxRange
      Description: The smallest port number in a specified range of port numbers.
    • min_range
      Type: INT32
      Provider name: MinRange
      Description: The smallest port number in a specified range of port numbers.

block_public_access_configuration_metadata

Type: STRUCT
Provider name: BlockPublicAccessConfigurationMetadata
Description: Properties that describe the Amazon Web Services principal that created the BlockPublicAccessConfiguration using the PutBlockPublicAccessConfiguration action as well as the date and time that the configuration was created. Each time a configuration for block public access is updated, Amazon EMR updates this metadata.

  • created_by_arn
    Type: STRING
    Provider name: CreatedByArn
    Description: The Amazon Resource Name that created or last modified the configuration.
  • creation_date_time
    Type: TIMESTAMP
    Provider name: CreationDateTime
    Description: The date and time that the configuration was created.

tags

Type: UNORDERED_LIST_STRING

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers