AWS Network Manager

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

AWS Network Manager is a centralized monitoring service for managing your AWS Cloud WAN core network and your AWS Transit Gateway network across AWS accounts, Regions, and on-premises locations.

Setup

Installation

If you haven’t already, set up the Amazon Web Services integration first.

Configuration

  1. In the AWS integration page, ensure that Network Manager is enabled under the Metric Collection tab.
  2. Install the Datadog - Amazon Network Manager integration.

Data Collected

Metrics

aws.ec2.infrastructureperformance.aggregate_aws_network_performance
(gauge)
The average latency between Regions, inter-Availability Zones, or intra-Availability Zones.
Shown as millisecond
aws.networkmanager.bytes_in
(count)
The number of bytes received by a resource.
Shown as byte
aws.networkmanager.bytes_out
(count)
The number of bytes sent from a resource.
Shown as byte
aws.networkmanager.packets_in
(count)
The number of packets received by a resource.
Shown as packet
aws.networkmanager.packets_out
(count)
The number of packets sent from a resource.
Shown as packet
aws.networkmanager.data_in
(count)
The number of bytes received by a resource.
Shown as byte
aws.networkmanager.data_out
(count)
The number of bytes sent from a resource.
Shown as byte
aws.networkmanager.tunnel_down_count
(gauge)
The number of VPN tunnels that have a DOWN status. Static VPN tunnels with a DOWN status, and BGP VPN tunnels with any state other than ESTABLISHED, are included in the count.
aws.networkmanager.bytes_drop_count_blackhole
(count)
The number of bytes dropped from a resource because it matched a blackhole route.
Shown as byte
aws.networkmanager.bytes_drop_count_no_route
(count)
The number of bytes dropped from a resource because it did not match a route.
Shown as byte
aws.networkmanager.packet_drop_count_blackhole
(count)
The number of packets dropped from a resource because it matched a blackhole route.
Shown as packet
aws.networkmanager.packet_drop_count_no_route
(count)
The number of packets dropped from a resource because it did not match a route.
Shown as packet

Service Checks

Amazon Network Manager does not include any service checks.

Events

Amazon Network Manager does not include any events.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers