Amazon Polly

개요

Amazon Polly는 텍스트를 자연스러운 음성 발화로 변환하는 서비스입니다.

이 통합을 활성화하면 Datadog에서 Polly 메트릭을 모두 확인할 수 있습니다.

설정

설치

아직 설치하지 않았다면 먼저 Amazon Web Services 통합을 설치하세요.

메트릭 수집

  1. AWS 통합 페이지에서 Metric Collection 탭 하단에 Polly가 활성화되어 있는지 확인합니다.
  2. Datadog - Amazon Polly 통합을 설치하세요.

로그 수집

로깅 활성화

S3 버킷이나 CloudWatch로 로그를 전송하도록 Amazon Polly를 구성하세요.

참고: S3 버킷에 로깅하는 경우 amazon_polly가 _Target prefix_로 지정되어야 합니다.

Datadog에 로그 전송

  1. 이미 하지 않은 경우 Datadog 포워더 람다 함수를 설정하세요.

  2. Lambda 함수를 설치한 후 AWS 콘솔에서 Amazon Polly 로그를 포함하는 S3 버킷이나 CloudWatch 로그 그룹에 수동으로 트리거를 추가하세요.

수집한 데이터

메트릭

aws.polly.2xx_count
(count)
Total number of HTTP 200 level code returned upon a successful response.
Shown as response
aws.polly.4xx_count
(count)
Total number of HTTP 400 level code returned upon a successful response. For each successful response, a zero (0) is emitted.
Shown as response
aws.polly.5xx_count
(count)
Total number of HTTP 500 level code returned upon a successful response. For each successful response, a zero (0) is emitted.
Shown as response
aws.polly.request_characters
(gauge)
The average number of characters in the request. This is billable characters only and does not include SSML tags.
aws.polly.request_characters.maximum
(gauge)
The maximum number of characters in the request. This is billable characters only and does not include SSML tags.
aws.polly.request_characters.minimum
(gauge)
The minimum number of characters in the request. This is billable characters only and does not include SSML tags.
aws.polly.request_characters.sum
(count)
The total number of characters in the request. This is billable characters only and does not include SSML tags.
aws.polly.response_latency
(gauge)
The average latency between when the request was made and the start of the streaming response.
Shown as millisecond
aws.polly.response_latency.maximum
(gauge)
The minimum latency between when the request was made and the start of the streaming response.
Shown as millisecond
aws.polly.response_latency.minimum
(gauge)
The minimum latency between when the request was made and the start of the streaming response.
Shown as millisecond
aws.polly.response_latency.samplecount
(count)
The total number of successful responses
Shown as response
aws.polly.response_latency.sum
(count)
The sum of the latency between when the request was made and the start of the streaming response.
Shown as millisecond

AWS에서 검색된 각 메트릭에는 호스트 이름, 보안 그룹 등을 포함하되 이에 국한되지 않고 AWS 콘솔에 표시되는 동일한 태그가 할당됩니다.

이벤트

Amazon Polly 통합에는 이벤트가 포함되어 있지 않습니다.

서비스 검사

Amazon Polly 통합에는 서비스 점검이 포함되지 않습니다.

트러블슈팅

도움이 필요하신가요? Datadog 지원팀에 문의하세요.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers