Modal

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Modal lets you run generative AI models, large-scale batch jobs, job queues, and much more. This integration collects logs (stdout/stderr logging from your modal applications, or audit logs for your account) that you can visualize through Datadog dashboards and set up alerts for with Datadog monitors.

Setup

Installation

To set up the Modal integration:

  1. Navigate to the Modal tile on the Datadog Integrations page and click Install Integration.

  2. Click Connect Accounts to begin authorization of this integration. You will be redirected to log into Modal, and once logged in, you’ll be redirected to the Datadog authorization page.

  3. Click the Authorize button to complete setup.

Logs and metrics from your Modal apps should now start appearing in Datadog.

Data Collected

Logs

Modal collects all application (stdout/stderr logging for functions) and audit logs.

Events

Modal does not include any events.

Metrics

See metadata.csv for a list of metrics provided by this integration.

Uninstallation

Once this integration has been uninstalled, any previous authorizations are revoked and logs/metrics stop being emitted to Datadog.

  1. Navigate to the Modal metrics settings page and select Delete Datadog Integration.
  2. On the Configure tab in the Modal integration tile in Datadog, click Uninstall Integration.
  3. Confirm that you want to uninstall the integration.
  4. Ensure that all API keys associated with this integration have been disabled by searching for the integration name on the API Keys page.

Troubleshooting

Need help? Contact Modal support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers