American Power Conversion

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

APC provides IT physical infrastructure products including surge protection, and battery back-up power.

Configure the APC integration and collect SNMP metrics from devices such as APC Uninterruptible Power Supply (UPS) products.

For details of monitored metrics, see the SNMP Data Collected section.

Setup

To install and configure the SNMP integration, see the Network Device Monitoring documentation.

Data Collected

Metrics

For details of monitored metrics, see the SNMP Data Collected section.

Troubleshooting

Need help? Contact Datadog support.

Further Reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers