Sortdb

Supported OS Linux Mac OS Windows

통합 버전1.0.0
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Get metrics from Sortdb service in real time to:

  • Visualize and monitor Sortdb stats.
  • Be notified about Sortdb failovers.
  • Check health of and get stats from multiple instances

Setup

The Sortdb check is not included in the Datadog Agent package, so you need to install it.

Installation

For Agent v7.21+ / v6.21+, follow the instructions below to install the Sortdb check on your host. See Use Community Integrations to install with the Docker Agent or earlier versions of the Agent.

  1. Run the following command to install the Agent integration:

    datadog-agent integration install -t datadog-sortdb==<INTEGRATION_VERSION>
    
  2. Configure your integration similar to core integrations.

Configuration

  1. Edit the sortdb.d/conf.yaml file in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your Sortdb metrics. See the sample sortdb.d/conf.yaml for all available configuration options.

  2. Restart the Agent.

Validation

Run the Agent’s status subcommand and look for sortdb under the Checks section.

Compatibility

The SortDB check is compatible with all major platforms.

Data Collected

Metrics

See metadata.csv for a list of metrics provided by this integration.

Service Checks

sortdb.http.can_connect
Returns CRITICAL if the check cannot connect to Sortdb, returns OK otherwise.
Statuses: ok, critical

Troubleshooting

The SortDB check does not include any events.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers