Upstash

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Upstash is a serverless data provider enabling Redis®, Kafka, and messaging/scheduling solutions for a diverse range of applications that provides speed, simplicity, and a seamless developer experience. Upstash uses the Redis and Kafka APIs, and is designed for:

  • Serverless functions (AWS Lambda)
  • Cloudflare Workers
  • Fastly Compute@Edge
  • Next.js Edge, Remix, and more
  • Client-side web or mobile applications
  • AI development
  • WebAssembly and other environments where HTTP is preferred over TCP connections

To centralize your monitoring stack and enable a comprehensive view of your data, the Upstash integration sends the following metrics to Datadog: * Hit/Miss Rate * Read/Write Latency (p99) * Keyspace * Number of Connections * Bandwidth * Total Data Size * Throughput

Setup

Installation

Visit Upstash to sign up for free. Once registered, visit the Upstash integration tile in Datadog and install the integration. Once installed, navigate to the Configure tab and click Connect Accounts. This guides you through the Datadog OAuth flow to grant Upstash access to your database metrics.

Uninstallation

To remove the Datadog integration from Upstash, navigate to the Upstash integrations page and click Remove. Additionally, uninstall this integration from Datadog by clicking the Uninstall Integration button on the integration tile. Once you uninstall this integration, any previous authorizations are revoked.

Additionally, ensure that all API keys associated with this integration have been disabled by searching for upstash on the API Keys management page.

Data Collected

Metrics

upstash.db.totaldatasize
(gauge)
The size of total data that you stored.
Shown as unit
upstash.db.missrate
(rate)
Miss rate of read requests.
Shown as miss
upstash.db.hitrate
(rate)
Hit rate of read requests.
Shown as hit
upstash.db.writelatencyp99
(gauge)
Write latency details p99 in ms.
Shown as millisecond
upstash.db.readlatencyp99
(gauge)
Read latency details p99 in ms.
Shown as millisecond
upstash.db.dailybandwidth
(gauge)
Daily bandwidth usage.
Shown as unit
upstash.db.monthlycost
(gauge)
Monthly cost of database.
Shown as unit
upstash.db.dailyprocessedcommands
(gauge)
Number of daily processed commands.
Shown as unit
upstash.db.dailywritecommands
(gauge)
Number of daily write commands.
Shown as unit
upstash.db.dailyreadcommands
(gauge)
Number of daily read commands.
Shown as unit
upstash.db.throughput
(gauge)
Database throughput metric.
Shown as unit
upstash.db.readpersecond
(gauge)
Read per second metric.
Shown as unit
upstash.db.writepersecond
(gauge)
Write per second metric.
Shown as unit
upstash.db.keyspace
(gauge)
Database keyspace metric.
Shown as unit
upstash.db.connections
(gauge)
Database connection count.
Shown as connection
upstash.db.restconnections
(gauge)
Database rest connection count.
Shown as connection
upstash.kafkacluster.daily_storage
(gauge)
The size of total data that you stored.
Shown as unit
upstash.kafkacluster.total_throughput
(gauge)
Kafka Cluster Total throughput metric.
Shown as unit
upstash.kafkacluster.consume_throughput
(gauge)
Kafka Cluster Consume throughput metric.
Shown as unit
upstash.kafkacluster.produce_throughput
(gauge)
Kafka Cluster Produce throughput metric.
Shown as unit
upstash.kafkacluster.monthly_cost
(gauge)
Number of monthly cost per Kafka Cluster.
Shown as unit
upstash.kafkacluster.consumed_daily_messages
(gauge)
Number of daily consumed messages per Kafka Cluster.
Shown as unit
upstash.kafkacluster.produced_daily_messages
(gauge)
Number of daily produced messages to Kafka Cluster.
Shown as unit
upstash.kafkacluster.consumed_monthly_messages
(gauge)
Number of monthly consumed messages per Kafka Cluster.
Shown as unit
upstash.kafkacluster.produced_monthly_messages
(gauge)
Number of monthly produced messages to Kafka Cluster.
Shown as unit
upstash.kafkacluster.replication
(gauge)
Replication count of certain Kafka Cluster.
Shown as unit
upstash.kafkacluster.topic_count
(gauge)
Topic count of certain Kafka Cluster.
Shown as unit
upstash.kafkacluster.partitions_count
(gauge)
Partition count of Kafka Cluster.
Shown as unit
upstash.topic.daily_produced
(gauge)
The size of total data that you stored.
Shown as unit
upstash.topic.daily_consumed
(gauge)
The size of total data consumed by certain Kafka topic.
Shown as unit
upstash.topic.daily_bytes
(gauge)
The amount of byte transmitted by certain Kafka topics.
Shown as unit
upstash.topic.monthly_produced
(gauge)
The amount of byte produced by certain Kafka topics.
Shown as unit
upstash.topic.monthly_consumed
(gauge)
The amount of byte consumed by certain Kafka topics.
Shown as unit
upstash.topic.monthly_bytes
(gauge)
The amount of byte transmitted for certain Kafka topics.
Shown as unit
upstash.metadata.metric_publish
(gauge)
The healthcheck metrics for upstash integration.
Shown as unit

Events

The Upstash integration does not include any events.

Service Checks

The Upstash integration does not include any service checks.

Support

Need help? Contact Upstash support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers