Vercel

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

datadog-integration

Overview

Vercel is a deployment and collaboration platform that enables frontend developers to build high-performance websites and applications. Vercel is also the creator of Next.js, a React framework developed in collaboration with engineers at Google and Facebook in 2016. Vercel users can leverage a built-in deployment tool that manages the build and rendering process, as well as a proprietary Edge Network that caches their sites for fast retrieval. Additionally, Vercel offers Serverless Functions, which allow users to deploy serverless code to accomplish essential backend processes like user authentication, form submission, and database queries.

Integrate Vercel with Datadog to:

Setup

Datadog

To connect Datadog with Vercel, enable the integration and select an API Key.

  1. Open the Vercel integration tile.

  2. Select the Configure tab and select Configure the Vercel integration.

  3. On the Your Datadog account info form, select Select an API Key and either choose an existing API key or select + Create New to use a new API key for the Vercel integration.

  4. After your selection is made, select Use API Key. This copies the selected API key to your device’s clipboard.

  5. After the API key is selected, you are redirected back to the Your Datadog account info form. Select Vercel > Add Integration to complete the integration setup for Vercel.

Vercel

  1. Click the Vercel > Add Integration link to be redirected to Vercel’s Datadog integration page.

  2. Select Connect Account to open the Connect Datadog Account form.

  3. Select which Vercel Team to connect the integration to. (Teams that already have the integration installed have an icon next to them labeled Installed)

  4. Select the radio button associated with either enabling the integration for all projects or a specific project that the team owns. Select Connect Account to save your changes.

  5. Paste the API key that was copied to your clipboard in Step 4 of the Datadog setup above into the box labeled Your Datadog API Key.

  6. Scroll to the bottom of the form and select Add Integration to save your changes.

Data Collected

Metrics

vercel.requests
(count)
The number of requests to each route in a Vercel project
Shown as request
vercel.builds.build_count
(count)
The number of builds of a Vercel project
Shown as build
vercel.functions.memorysize
(gauge)
The memory allocated to a Vercel Serverless Function
Shown as mebibyte
vercel.functions.max_memory_used
(gauge)
The max memory used by a Vercel Serverless Function invocation
Shown as mebibyte
vercel.functions.invocations
(count)
The number of invocations of a Vercel Serverless Function
Shown as invocation
vercel.functions.execution
(gauge)
The execution time of a Vercel Serverless Function invocation
Shown as microsecond
vercel.functions.errors
(count)
The number of errors in a Vercel Serverless Function
Shown as error
vercel.functions.duration
(gauge)
The duration of a Vercel Serverless Function invocation
Shown as nanosecond

Service Checks

The Vercel integration does not include any service checks.

Events

The Vercel integration does not include any events.

Logs

The Vercel integration collects logs from your Vercel Project using Vercel’s Log Drains feature.

Troubleshooting

If you are using the Vercel OpenTelemetry Collector, the serviceName specified in registerOTel block of your initializer must match the Vercel Project name. This enables traces to appear in Datadog with the appropriate logs and metrics.

Need help? Contact Datadog support.

Further Reading

추가 유용한 문서, 링크 및 기사:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers