Zenoh router

Supported OS Linux Windows Mac OS

통합 버전1.1.0
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

This check monitors Zenoh router.

Zenoh is an open source Zero Overhead Network Protocol.

Zenoh (/zeno/) is a pub/sub/query protocol unifying data in motion, data at rest, and computations. It elegantly blends traditional pub/sub with geo distributed storage, queries, and computations, while retaining a level of time and space efficiency that is well beyond any of the mainstream stacks.

The Zenoh router integration allows you to monitor router metrics and router/peer/client connection statuses in Datadog.

Setup

Installation with the Datadog Agent (v7.21+ and v6.21+)

For Agent v7.21+ / v6.21+, follow the instructions below to install Zenoh router check on your host.

  1. On your host, run the following command to install the Agent integration:

    datadog-agent integration install -t datadog-zenoh_router==<INTEGRATION_VERSION>
    

Note:

  • The datadog-zenoh_router integration version 1.0.0 is compatible with Zenoh router versions below 1.0.
  • For Zenoh router versions above or equal 1.0, integration version 1.1.0 should be used.

Installation from the source code

To install the Zenoh router check on your host:

  1. Install the developer toolkit on any machine.

  2. Run ddev release build zenoh_router to build the package.

  3. Upload the build artifact to any host with the Agent installed

  4. On the host, run datadog-agent integration install -w path/to/zenoh_router/dist/<ARTIFACT_NAME>.whl.

Configuration

  1. Make sure that the Zenoh REST API plugin is enabled.

Note:

  • The default Zenoh router provides only session information.
  • To access full statistics, this feature needs to be enabled at Zenoh router build time using the stats feature. For example:
cargo build --features stats

Alternatively, you can use routers from the Zetta Platform

  1. Edit the zenoh_router.d/conf.yaml file in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your Zenoh router metrics. See the sample zenoh_router.d/conf.yaml for all available configuration options.

  2. Restart the Agent.

Validation

Run the Agent’s status subcommand and look for zenoh_router under the Checks section.

Data Collected

Metrics

zenoh.router.sessions
(count)
The number of active sessions
Shown as connection
zenoh.router.rx_bytes
(gauge)
The number of received bytes
Shown as byte
zenoh.router.rx_n_dropped
(gauge)
The number of dropped network messages
Shown as message
zenoh.router.rx_n_msgs
(gauge)
The number of received network messages
Shown as message
zenoh.router.rx_t_msgs
(gauge)
The number of received transport messages
Shown as message
zenoh.router.rx_z_del_msgs
(gauge)
The number of received zenoh del messages
Shown as message
zenoh.router.rx_z_put_msgs
(gauge)
The number of received zenoh put messages
Shown as message
zenoh.router.rx_z_put_pl_bytes
(gauge)
The number of received bytes in zenoh put message payloads
Shown as byte
zenoh.router.rx_z_query_msgs
(gauge)
The number of received zenoh query messages
Shown as message
zenoh.router.rx_z_query_pl_bytes
(gauge)
The number of received bytes in zenoh query message payloads
Shown as byte
zenoh.router.rx_z_reply_msgs
(gauge)
The number of received zenoh reply messages
Shown as message
zenoh.router.rx_z_reply_pl_bytes
(gauge)
The number of received bytes in zenoh reply message payloads
Shown as byte
zenoh.router.tx_bytes
(gauge)
The number of sent bytes
Shown as byte
zenoh.router.tx_n_dropped
(gauge)
The number of dropped network messages
Shown as message
zenoh.router.tx_n_msgs
(gauge)
The number of sent network messages
Shown as message
zenoh.router.tx_t_msgs
(gauge)
The number of sent transport messages
Shown as message
zenoh.router.tx_z_del_msgs
(gauge)
The number of sent zenoh del messages
Shown as message
zenoh.router.tx_z_put_msgs
(gauge)
The number of sent zenoh put messages
Shown as message
zenoh.router.tx_z_put_pl_bytes
(gauge)
The number of sent bytes in zenoh put message payloads
Shown as byte
zenoh.router.tx_z_query_msgs
(gauge)
The number of sent zenoh query messages
Shown as message
zenoh.router.tx_z_query_pl_bytes
(gauge)
The number of sent bytes in zenoh query message payloads
Shown as byte
zenoh.router.tx_z_reply_msgs
(gauge)
The number of sent zenoh reply messages
Shown as message
zenoh.router.tx_z_reply_pl_bytes
(gauge)
The number of sent bytes in zenoh reply message payloads
Shown as byte

Events

Zenoh router does not include any events.

Service Checks

zenoh.router.can_connect
Returns CRITICAL if the Agent can’t connect to the Zenoh router, OK otherwise
Statuses: ok, critical

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers