Google Chronicle Destination

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Use Observability Pipelines’ Google Chronicle destination to send logs to Google Chronicle.

Setup

Set up the Google Chronicle destination and its environment variables when you set up a pipeline. The information below is configured in the pipelines UI.

Set up the destination

To authenticate the Observability Pipelines Worker for Google Chronicle, contact your Google Security Operations representative for a Google Developer Service Account Credential. This credential is a JSON file and must be placed under DD_OP_DATA_DIR/config. See Getting API authentication credential for more information.

To set up the Worker’s Google Chronicle destination:

  1. Enter the customer ID for your Google Chronicle instance.
  2. Enter the path to the credentials JSON file you downloaded earlier.
  3. Select JSON or Raw encoding in the dropdown menu.
  4. Enter the log type. See template syntax if you want to route logs to different log types based on specific fields in your logs.

Note: Logs sent to the Google Chronicle destination must have ingestion labels. For example, if the logs are from a A10 load balancer, it must have the ingestion label A10_LOAD_BALANCER. See Google Cloud’s Support log types with a default parser for a list of available log types and their respective ingestion labels.

Set the environment variables

  • Google Chronicle endpoint URL:
    • Stored in the environment variable: DD_OP_DESTINATION_GOOGLE_CHRONICLE_UNSTRUCTURED_ENDPOINT_URL.

How the destination works

Event batching

A batch of events is flushed when one of these parameters is met. See event batching for more information.

Max EventsMax BytesTimeout (seconds)
None1,000,00015
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers