이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

OTel Collector Contrib version 0.95.0 disables Trace Metrics computation in the Datadog Exporter by default.

In versions 0.95.0 and later, the calculation of Trace Metrics is handled by the Datadog Connector. This change ensures that:

  • Trace Metrics are consistently calculated on 100% of the trace data, even when sampling is applied.
  • Moving calculation to the Datadog Connector better aligns with the OpenTelemetry recommended architecture.

To continue receiving Trace Metrics, configure the Datadog Connector in the OpenTelemetry Collector.

Migrate to OpenTelemetry Collector version 0.95.0+

To continue receiving Trace Metrics, you must configure the Datadog Connector as a part of your upgrade to OpenTelemetry Collector version 0.95.0+. Upgrading without configuring the Datadog Connector might also result in difficulties viewing the APM Traces page within the application. Monitors and dashboards based on the affected metrics might also be impacted.

Before proceeding with the upgrade to the OTel Collector versions 0.95.0+:

  • Review the release notes to understand the nature of the changes.
  • Assess how these changes may affect your current configuration and deployment.
  • Consider reaching out to the Datadog support team for guidance and assistance in planning your upgrade strategy.

To upgrade:

  1. Include datadog/connector in the list of configured connectors.
  2. Include datadog/connector and datadog/exporter in the list of the configured exporters in your OpenTelemetry traces pipeline.
  3. Include datadog/connector in the list of the configured receivers in your OpenTelemetry metrics pipeline.
  4. Include datadog/exporter in the list of the configured exporters in your OpenTelemetry metrics pipeline.

Example configuration

Below is an example of an OpenTelemetry configuration before and after migration.

Before migration:

// Legacy default configuration before v0.95.0
receivers:
  otlp:
    protocols:
      http:
      grpc:
processors:
  batch:
exporters:
  datadog:
    api:
      key: <api key here>
service:
  pipelines:
    traces:
      receivers: [otlp]
      processors: [batch]
      exporters: [datadog/exporter]

After migration:

// New default configuration after v0.95.0
receivers:
  otlp:
    protocols:
      http:
        endpoint: 0.0.0.0:4318
      grpc:
        endpoint: 0.0.0.0:4317
processors:
  batch:
connectors:
  datadog/connector:
exporters:
  datadog/exporter:
    api:
      key: <api key here>
service:
  pipelines:
    traces:
      receivers: [otlp]
      processors: [batch]
      exporters: [datadog/connector, datadog/exporter]
    metrics:
      receivers: [datadog/connector, otlp] // The connector provides the metrics to your metrics pipeline
      processors: [batch]
      exporters: [datadog/exporter]

Vendor-specific Open-Telemetry distributions

If you’re running a vendor-specific OpenTelemetry distribution that does not include the Datadog Connector, revert to the previous Trace Connector behavior by disabling the exporter.datadogexporter.DisableAPMStats feature gate.

otelcol --config=config.yaml --feature-gates=-exporter.datadogexporter.DisableAPMStats

For questions or assistance, contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers