Backup recovery points should be encrypted at rest

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control ensures that AWS Backup recovery points are encrypted at rest, passing only if encryption is enabled.

An AWS Backup recovery point is a saved snapshot of your data at a specific time. Encrypting these recovery points enhances security, guarding against unauthorized access.

Remediation

For instructions on encrypting an AWS Backup recovery point, see Encryption for backups in AWS Backup in the AWS Backup Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers