EFS file systems should be in backup plans

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies whether Amazon EFS file systems are incorporated into AWS Backup plans.

Ensuring EFS file systems are part of backup plans helps safeguard data against loss and accidental deletion. If a third party backup system is in operation, findings from this control can be muted.

Remediation

To learn how to enable create a backup plan, see the Create a backup plan section of the AWS Backup Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers