Kubelet configuration file ownership should be assigned to root

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Ensure that the file ownership of the kubelet’s kubeconfig file is set to root:root. You should set its file ownership to maintain integrity.

Remediation

Run the following command to fix the kubelet configuration file’s ownership:

chown root:root /var/lib/kubelet/kubeconfig

Note: The path above is the default location in EKS.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers