ElastiCache clusters should not use the default subnet group

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This assessment verifies ElastiCache clusters are configured with a custom subnet group. The assessment will not pass for an ElastiCache cluster if the CacheSubnetGroupName is set to default.

When initiating an ElastiCache cluster, a default subnet group is automatically generated if one does not already exist. This default group utilizes subnets from the default Virtual Private Cloud (VPC). It is advised to utilize custom subnet groups that give more control over the subnets in which the cluster is located and the networking inherited from those subnets.

Remediation

For guidance on establishing a new subnet group for an ElastiCache cluster, please refer to the Creating a subnet group section in the Amazon ElastiCache User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers