MSK clusters should be encrypted in transit among broker nodes

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This rule checks whether Amazon MSK clusters have encryption enabled for data in transit among broker nodes.

By default, Amazon MSK encrypts data in transit within the cluster. This setting can be modified during the cluster creation process.

Remediation

To configure encryption in transit for MSK clusters, adjust the encryption settings during cluster creation. For detailed steps on setting up encryption in transit, refer to Updating security settings of a cluster in the Amazon Managed Streaming for Apache Kafka Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers