Neptune DB clusters should have IAM database authentication enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies whether IAM database authentication is enabled for a Neptune DB cluster.

Enabling IAM database authentication for Amazon Neptune clusters eliminates the need to store user credentials within the database itself, as authentication is handled externally through IAM. When enabled, all requests must be signed using AWS Signature Version 4.

Remediation

For guidance on enabling IAM database authentication, please refer to the Enabling IAM database authentication in Neptune section of the Neptune User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers