Network Firewall logging should be enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies whether at least one type of logging is enabled for an AWS Network Firewall.

Enabling logging is essential for ensuring the reliability, availability, and performance of your firewalls. AWS Network Firewall logging provides detailed insights into network traffic, including timestamps of when the stateful engine processed a packet flow, detailed packet flow information, and any actions taken by stateful rules against the packet flow.

Remediation

For guidance on configuring firewall logging, please refer to the Updating a firewall’s logging configuration section of the AWS Network Firewall Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers