EC2 Transit Gateways should not automatically accept VPC attachment requests

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This check verifies whether EC2 transit gateways are set to automatically accept shared VPC attachments. The check will not pass if a transit gateway is configured to automatically accept attachment requests for shared VPCs.

Enabling the AutoAcceptSharedAttachments setting allows a transit gateway to automatically accept VPC attachment requests from other accounts without verification. To adhere to best practices for authorization and authentication, it is advised to disable this feature so that only authorized attachment requests are accepted.

Remediation

For instructions on how to make changes to a transit gateway, refer to the Modify a transit gateway section in the Amazon VPC Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers