Excessive payment failures from IP

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect excessive payment failures from an IP.

This may be caused by a malicious actor trying to use stolen payment cards to buy products from you. Those payments will lead to expensive chargebacks and unpaid but shipped products.

Required business logic events

Datadog auto-instruments many event types. Review your instrumented business logic events. This detection requires the following instrumented event:

  • payment.failure

Strategy

Count the number of payment failures generated coming from a single IP.

Require the payment failure to be flagged using a user event with a status metadata field set to success or failed.

A Medium signal is then generated if more than 3 signups from a single IP over 5 minutes are found.

Triage and response

  1. Investigate the IP activity and validate that it is legitimate.
  2. Flag transactions from this IP for advanced review and require a captcha to perform payment until the attack is over.
  3. Consider blocking the IP to slow down the attacker.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers