Google Workspace accessed by Google

Set up the gsuite integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Create a signal when Google accesses your Google Workspace tenant using administrative tools.

Strategy

Monitor Google Workspace logs to detect ACCESS events, which are part of Google’s Access Transparency logs.

Triage and response

  1. Determine the scope of Google’s access activity, which can be found in the ACCESS event in the Google Workspace event log.
  2. Review which Google Workspace user (@event.parameters.OWNER_EMAIL) and resources (@event.parameters.RESOURCE_NAME) were accessed by Google.
  3. Investigate the resource(s) being accessed to determine if there is a legitimate reason it should be reviewed by Google.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers