The Controller Manager profiling should be disabled

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Controller manager profiling should be disabled if not required. Profiling allows for the identification of specific performance bottlenecks, and generates a significant amount of program data that could potentially be exploited to uncover system and program details. If you are not experiencing any bottlenecks and do not need the profiler for troubleshooting purposes, it is recommended to turn it off to reduce the potential attack surface.

Remediation

Edit the Controller Manager pod specification file /etc/kubernetes/manifests/kube-controller-manager.yaml on the master node and set the following parameter:

--profiling=false
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers