Suricata high number of requests detected from single IP address

Set up the suricata integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect an unusually high number of requests are made from a single IP address, which could indicate a potential brute force attack, Denial-of-Service (DoS) attempt, or other malicious activities aimed at overwhelming or exploiting the server.

Strategy

Monitor Suricata logs where a single IP address generates a high number of requests within a short period. This detection rule aims to identify potential threats early, allowing for timely investigation and mitigation to protect server resources and maintain service availability.

Triage and response

  1. Analyse the pattern and volume of requests to distinguish between legitimate traffic and potential attacks.
  2. Investigate the source IP {{@network.client.ip}} address to determine if the activity is malicious.
  3. Implement immediate measures to block or limit the impact of the suspicious activity if confirmed as a threat.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers