Record Events that Modify the System's Mandatory Access Controls

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

If the auditd daemon is configured to use the augenrules program to read audit rules during daemon startup (the default), add the following line to a file with suffix .rules in the directory /etc/audit/rules.d:

-w /etc/selinux/ -p wa -k MAC-policy

If the auditd daemon is configured to use the auditctl utility to read audit rules during daemon startup, add the following line to /etc/audit/audit.rules file:

-w /etc/selinux/ -p wa -k MAC-policy

Rationale

The system’s mandatory access policy (SELinux) should not be arbitrarily changed by anything other than administrator action. All changes to MAC policy should be audited.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Perform the remediation for both possible tools: 'auditctl' and 'augenrules'
<ns10:sub idref="xccdf_org.ssgproject.content_value_function_fix_audit_watch_rule" use="legacy"/>
fix_audit_watch_rule "auditctl" "/etc/selinux/" "wa" "MAC-policy"
fix_audit_watch_rule "augenrules" "/etc/selinux/" "wa" "MAC-policy"
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers