Verify Permissions on shadow File

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

To properly set the permissions of /etc/shadow, run the command:

$ sudo chmod 0640 /etc/shadow

Rationale

The /etc/shadow file contains the list of local system accounts and stores password hashes. Protection of this file is critical for system security. Failure to give ownership of this file to root provides the designated owner with access to sensitive information which could weaken the system security posture.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

chmod u-xs,g-xws,o-xwrt /etc/shadow

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Test for existence /etc/shadow
  stat:
    path: /etc/shadow
  register: file_exists
  tags:
  - CJIS-5.5.2.2
  - NIST-800-53-AC-6(1)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.7.c
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - configure_strategy
  - file_permissions_etc_shadow
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Ensure permission u-xs,g-xws,o-xwrt on /etc/shadow
  file:
    path: /etc/shadow
    mode: u-xs,g-xws,o-xwrt
  when: file_exists.stat is defined and file_exists.stat.exists
  tags:
  - CJIS-5.5.2.2
  - NIST-800-53-AC-6(1)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.7.c
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - configure_strategy
  - file_permissions_etc_shadow
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers