Install PAE Kernel on Supported 32-bit x86 Systems

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Systems that are using the 64-bit x86 kernel package do not need to install the kernel-PAE package because the 64-bit x86 kernel already includes this support. However, if the system is 32-bit and also supports the PAE and NX features as determined in the previous section, the kernel-PAE package should be installed to enable XD or NX support. The kernel-PAE package can be installed with the following command:


$ sudo yum install kernel-PAE

The installation process should also have configured the bootloader to load the new kernel at boot. Verify this after reboot and modify /etc/default/grub if necessary.

Rationale

On 32-bit systems that support the XD or NX bit, the vendor-supplied PAE kernel is required to enable either Execute Disable (XD) or No Execute (NX) support.

Warning

The kernel-PAE package should not be installed on older systems that do not support the XD or NX bit, as 8this may prevent them from booting.8

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers