Credential stuffing attack on Auth0

Set up the auth0 integration.

Goal

Detect Account Take Over (ATO) through credential stuffing attack.

Strategy

To determine a successful attempt: Detect a high number of failed logins from at least ten unique users and at least one successful login for a user. This generates a HIGH severity signal.

To determine an unsuccessful attempt: Detect a high number of failed logins from at least ten unique users. This generates an INFO severity signal.

Triage and response

  1. Inspect the logs to see if this was a valid login attempt.
  2. See if 2FA was authenticated
  3. If the user was compromised, rotate user credentials.

Changelog

13 June 2022 - Updated Keep Alive window and evaluation window to reduce rule noise.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers